FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN SCB30CE (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB30CE (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What are the key warnings for operating the SPEED QUEEN SCB30CE?
Failure to install, maintain, and/or operate the SPEED QUEEN SCB30CE according to the manufacturer’s instructions may result in conditions which can produce serious injury, death, and/or property damage.
The WARNING and IMPORTANT instructions appearing in the manual are not meant to cover all possible conditions and situations that may occur. It must be understood that common sense, caution, and carefulness are factors which CANNOT be built into this tumbler. These factors MUST BE supplied by the person(s) installing, maintaining, or operating the tumbler.
What should I do if my SPEED QUEEN SCB30CE is not performing correctly?
To reduce the risk of fire, electrical shock, serious injury, or death to persons, do not operate the SPEED QUEEN SCB30CE if it does not perform according to these instructions. Immediately disconnect electrical service and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.
What basic precautions should I follow when using the SPEED QUEEN SCB30CE?
To reduce the risk of fire, electrical shock, serious injury, or death to persons when using the SPEED QUEEN SCB30CE, follow these basic precautions:
• Read all instructions before using the tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into the tumbler if the cylinder is revolving.
What materials should NOT be dried in the SPEED QUEEN SCB30CE?
To avoid creating any flammable vapors which may explode, ignite, or cause corrosive damage, DO NOT dry the following materials in the SPEED QUEEN SCB30CE:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals, or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
What safety precautions should be taken regarding children and the SPEED QUEEN SCB30CE?
Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
What are the general safety warnings for the SPEED QUEEN SCB30CE?
• Do not install or store the tumbler where it will be exposed to water and/or weather.
• Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
• Run the tumbler with a load before putting it into service.
• Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off the appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.
• All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram. Activation of the emergency stop switch stops all machine control circuit functions but does not remove all electrical power from the machine.
What do the warning labels on the SPEED QUEEN SCB30CE indicate?
The warning labels found on the SPEED QUEEN SCB30CE indicate the following:
• A clothes dryer produces combustible lint. TUMBLER MUST BE EXHAUSTED OUTDOORS.
• Do not touch rotating parts.
• Do not touch surface until it has cooled.
• Do not operate without guards in place.
• Disconnect electrical power before servicing.
• WARNING! – This symbol indicates a general warning.
• A comprehensive warning label states:
– DO NOT put articles soiled with flammable liquids or flammable cleaning solvents in the dryer.
– DO NOT store or use flammable liquids near this appliance.
– DO NOT spray or store aerosols in the vicinity of this appliance.
– Various chemicals used in laundries contain chlorine. When decomposed in a flame, these materials may rapidly corrode and destroy this appliance.
– Dryer must be exhausted outdoors, and the area around the dryer must be free of lint because the dryer produces combustible lint.
– DO NOT dry articles containing foam rubber, plastic or similarly textured rubberlike materials.
– Use for drying water washed fabrics only.
– DO NOT put articles soiled with vegetable or cooking oil in the dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
– DO NOT reach into the dryer until all moving parts have stopped.
– DO NOT let children play in the dryer.
Where can I find the model and serial numbers on my SPEED QUEEN SCB30CE?
The model and serial numbers for the SPEED QUEEN SCB30CE will be found on the nameplate as shown on the rear of the tumbler or underneath the door hinge.
What are the specifications for the SPEED QUEEN SCB30CE?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 30″ x 30″ (76.2 x 76.2 cm) perforated galvanized steel with three baffles; 30 pounds (13.6 kg) dry weight (cotton load) |
| Motor: | 1/3 H.P., lifetime lubricated, internal overload protected |
| Electrical Requirements: (see nameplate for voltage of your tumbler) |
230 Volt, 50 Hertz, 1 Phase, 90 Amp 230 Volt, 50 Hertz, 3 Phase, 54 Amp 380 Volt, 50 Hertz, 3 Phase, 33 Amp 415 Volt, 50 Hertz, 3 Phase, 30 Amp |
| Element: | 21,000 Watts (all voltages) |
| Air Flow: | 600 C.F.M. at 0.5″ W.C. (283 liters/sec. at 1.25 mBar) |
| Net Weight: | 450 pounds (204 kg) (approximate) |
What should I do upon receiving my SPEED QUEEN SCB30CE?
Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there are signs of damage, have the carrier note the condition on shipping papers before signing the receipt, or advise the carrier as soon as it is discovered. A written claim should be filed with the carrier immediately if articles are damaged or missing.
Remove the crate and protective cover as soon as possible and check items listed on the packing list.
IMPORTANT: Remove shipping tape from the two back draft dampers located in the exhaust thimble.
What materials are required for installing a SPEED QUEEN SCB30CE?
For an electric SPEED QUEEN SCB30CE, you will need to obtain one circuit breaker locally.
What are the floor and layout requirements for installing a SPEED QUEEN SCB30CE?
Floor: The SPEED QUEEN SCB30CE may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
Layout: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler.
What are the venting requirements for the SPEED QUEEN SCB30CE?
For maximum efficiency and minimum lint accumulation, the air from the SPEED QUEEN SCB30CE must be exhausted to the outdoors by the shortest possible route. Proper sized exhaust ducts are essential for proper operation. All elbows should be the sweep type. Exhaust ducts must be constructed of sheet metal or other noncombustible material, equivalent in strength and corrosion resistance to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.
Individual Venting:
It is preferred to exhaust tumblers individually to the outdoors. At no point may the cross area of the installed venting be less than the cross area of the exhaust thimble of the tumbler. The maximum allowable length of venting is 14 feet (4.3 m) and two 90° elbows or equivalent. If the duct length exceeds this, the diameter must be increased.
Collector Venting:
A main collector duct may be used if sized correctly. The collector duct must be tapered, and individual tumbler ducts must enter the collector duct at a 45° angle in the direction of airflow. Never connect a tumbler duct at a 90° angle to the collector duct. The collector system must be designed so the static back pressure measured 12 inches from the exhaust thimble does not exceed the maximum allowable pressure specified on the installation sticker on the rear of the tumbler.
What are the make-up air requirements for the SPEED QUEEN SCB30CE?
The SPEED QUEEN SCB30CE is a forced air exhausted tumbler and requires provisions for make-up air to replace the exhausted air. The recommended make-up air opening is 144 square inches (928 sq. cm) for a 30-pound tumbler.
Protective louvers in the opening can reduce air movement by approximately 40%, so the opening must compensate for the area taken up by louvers.
What are the minimum diameter requirements for a collector duct system for the SPEED QUEEN SCB30CE?
| MINIMUM DIAMETER | MINIMUM DIAMETER | ||
|---|---|---|---|
| DUCT STATION | *GAS ELECTRIC | DUCT STATION | *GAS ELECTRIC |
| A | 9″ (22.9 cm) | G | 23″ (58.4 cm) |
| B | 12″ (30.5 cm) | H | 25″ (63.5 cm) |
| C | 15″ (38.1 cm) | I | 26″ (66 cm) |
| D | 17″ (43.2 cm) | J | 27″ (68.6 cm) |
| E | 19″ (48.3 cm) | K | 29″ (73.9 cm) |
| F | 21″ (53.3 cm) | L | 30″ (76.2 cm) |
What are the electrical requirements for the SPEED QUEEN SCB30CE?
NOTE: DO NOT use aluminum wire.
| 240 V, 1 Ph, 50 Hz. | 240 V, 3 Ph, 50 Hz. | 380 V, 3 Ph, 50 Hz. | 415 V, 3 Ph, 50 Hz. | |
|---|---|---|---|---|
| Minimum Wire Size | 2 AWG (33.63 mm²) | 6 AWG (13.32 mm²) | 8 AWG (8.366 mm²) | 8 AWG (8.366 mm²) |
| AMP Rating | 90 Amp | 54 Amp | 33 Amp | 30 Amp |
| Circuit Breaker | 100 Amp | 60 Amp | 40 Amp | 35 Amp |
| Poles | 2 | 3 | 3 | 3 |
What are the grounding instructions for the SPEED QUEEN SCB30CE?
The SPEED QUEEN SCB30CE must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. The drying tumbler must be connected to a grounded metal, permanent wiring system; or an equipment grounding conductor must be run with the circuit conductors and connected to the PE Busbar.
WARNING: To reduce the risk of fire and electric shock, check with a qualified serviceman for proper grounding procedures. Improper connection of the equipment grounding conductor can result in a risk of electric shock.
WARNING: To reduce the risk of fire and electric shock, if the electrical supply is coming from a three-phase service, DO NOT connect a “Stinger Leg” to a single-phase machine.
How do I make the electrical connections to the SPEED QUEEN SCB30CE?
WARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
1. Install a circuit breaker, as close to the tumbler as possible. If more than one tumbler is being installed, a circuit breaker should be provided for each tumbler.
2. a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch.
– 1 Phase Units: Connect one lead to the top left connection point. Connect the other lead to the top right connection point.
– 3 Phase Units: Connect one lead to each connection point.
e. Connect a ground wire to the PE Busbar in the junction box.
3. For three-phase units, check the electrical service phase sequence.
4. Close the junction box cover and turn “on” the disconnect switch.
How do I check the electrical service phase sequence on a three-phase SPEED QUEEN SCB30CE?
a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct.
b. If the cylinder rotates counterclockwise, disconnect the power and reverse any two leads at the connections.
How do I position and level the SPEED QUEEN SCB30CE?
Positioning:
The tumbler may be removed from its shipping skid before or during moving to the installation location. To remove from the skid, unscrew the four shipping capscrews (one at each corner). The lint panel door will have to be removed to access two front capscrews.
NOTE: Do not throw these four capscrews away – they are the leveling legs.
Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight of the tumbler is evenly distributed and the tumbler does not rock.
Leveling:
The SPEED QUEEN SCB30CE should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the clothes cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.
What are the requirements for constructing an enclosure for the SPEED QUEEN SCB30CE?
IMPORTANT: DO NOT block airflow at the top rear of the tumbler with laundry, etc. Doing so would prevent adequate air supply to the tumbler’s heat chamber.
The enclosure can touch the tumbler top and side panels. Be aware that there may be local codes and ordinances which must be complied with.
NOTICE: Clearance of the tumbler cabinet from combustible construction must be a minimum of 12 inches (30.5 cm) at the top.
IMPORTANT: Install the SPEED QUEEN SCB30CE with sufficient clearance for servicing and operating. A minimum of 24″ (61 cm) is required at the rear, with 36″ (91.4 cm) recommended for maintenance purposes.
WARNING: To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of the tumblers.
How do I install an accessory timing cam on a coin-operated SPEED QUEEN SCB30CE?
Removal of Existing Timing Cam:
1. Rotate the cam by hand until the “V” notch lines up beneath the ratchet tooth.
2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft. Lift gently off the shaft. Make sure that pressure is directed upward and that the “V” notch clears the ratchet tooth.
Installation of New Timing Cam:
1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.
2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press the timing cam down firmly to seat the timing cam onto the motor shaft.
4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to the fully seated timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one cycle before an accurate measure of time can be made.
What are the preliminary operating checks for the SPEED QUEEN SCB30CE?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals, and fittings for security.
2. Check belt tension; adjust if necessary.
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop rotating, adjust the cylinder door interlock.
5. Load the tumbler with clothes or clean rags.
6. Start the tumbler.
7. Check the air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.
8. Turn off the tumbler.
9. Check the air flow switch operation by opening the lint panel. Heating systems should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.
How do I perform final operating checks on a Manual Dual Timer SPEED QUEEN SCB30CE?
1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.
2. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light, and the drying selector will rotate counterclockwise.
3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light, and the cooling selector will rotate counterclockwise.
4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.
How do I perform final operating checks on a Coin Operated SPEED QUEEN SCB30CE?
1. Set the temperature selector to HIGH.
2. Insert the required amount of coins.
3. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start and the heat system will turn on.
4. Near the end of the cycle, a preset 2 1/2 minute cool-down cycle will start.
5. When metered time expires, the motor will stop, indicating the drying cycle is finished.
How do I adjust the air flow switch on the SPEED QUEEN SCB30CE?
The air flow switch on the SPEED QUEEN SCB30CE is set at the factory for proper operation. However, if there is a problem, it should be adjusted as follows:
NOTICE: The control panel must be in place and the access door closed before attempting to adjust the air flow switch.
IMPORTANT: The air flow switch disc must remain closed during operation. If it opens and closes during the drying cycle, this indicates insufficient air flow through the tumbler.
1. Load the tumbler.
2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening switch contacts and shutting off the heat system. This indicates proper operation and adjustment.
3. If the switch is not opening as described, it should be adjusted to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest by opening the lint panel and continue moving the counterweight toward the disc until it operates correctly.
4. If the switch opens BEFORE the lint panel is opened the proper distance, it should be adjusted to be LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates as described.
What should I know about the air flow switch operation on the SPEED QUEEN SCB30CE?
For Electric Models like the SPEED QUEEN SCB30CE: If the switch remains open, or pops open and closed during the cycle, the heating system will shut off. The cylinder and fan will continue to operate even though the air flow switch is malfunctioning.
WARNING: To reduce the risk of fire, air flow switch operation may be affected by a clogged lint screen, lack of make-up air, obstructions in the vertical recirculation stack, or in the customer-installed main or collector ducts. These conditions must be checked and necessary corrections made before adjusting the air flow switch. Always adjust the air flow at installation.
How do I adjust the loading door switch on the SPEED QUEEN SCB30CE?
The loading door switch turns off the tumbler anytime the loading door is opened. To adjust the switch:
1. Start the tumbler following operating instructions.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
3. Slowly close the loading door. The loading door switch should close with an audible “click” when the loading door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
4. If the loading door switch does not close at the correct point:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the switch coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify the loading door switch operation.
How do I adjust the cylinder door strike on the SPEED QUEEN SCB30CE?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of the load tumbling against it. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.
To adjust, open the door, loosen the jamnut, and turn the door strike screw in or out as required. Retighten the jamnut.
How do I adjust the drive V-belt on the SPEED QUEEN SCB30CE?
WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation.
Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) by applying light thumb pressure at a point midway between the sheave and motor pulley.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten the V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
4. To loosen the V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
5. Replace the guard on the rear of the tumbler.
6. The upper belt requires no adjustment since it is self-adjusting.
WARNING: To reduce the risk of serious injury or death, the guard MUST be installed on the rear of the tumbler after belt adjustment is made.
What are the daily preventive maintenance tasks for the SPEED QUEEN SCB30CE?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the lint compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.
6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps allow lint to flow into the ductwork system.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.
8. Replace and securely lock the lint panel.
What are the monthly preventive maintenance tasks for the SPEED QUEEN SCB30CE?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
3. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
4. Reinstall the exhaust duct.
5. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
6. Reinstall the vertical exhaust duct cover.
7. Inspect the entire duct work assembly and clean out all accumulated lint.
8. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What are the quarterly preventive maintenance tasks for the SPEED QUEEN SCB30CE?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
5. Remove screws holding the rear drive guard to the back of the tumbler.
6. Inspect belts for wear and proper tension (refer to the Adjustments section).
7. Reinstall the rear drive guard to the back of the tumbler.
8. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What are the biannual preventive maintenance tasks for the SPEED QUEEN SCB30CE?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals, and fittings for tightness.
6. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.
7. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
What is the maintenance check chart for the SPEED QUEEN SCB30CE?
| QUARTERLY MAINTENANCE | (DATES) |
|---|---|
| Clean air vents on drive motor. | |
| Clean exhaust ducts. | |
| Check flow of combustion air. | |
| Check flow of ventilation air. | |
| Check belt tension. |
| BIANNUAL MAINTENANCE | (DATES) |
|---|---|
| Check for loose nuts. | |
| Check for loose bolts. | |
| Check for loose screws. | |
| Check for loose electrical connections. |
How do I decommission the SPEED QUEEN SCB30CE?
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Remove all electric connections.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB30CE (01) PDF DOCUMENT
