FREE ENGLISH SPEED QUEEN JC50EG (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN JC50EG (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN JC50EG (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What are the key safety warnings for the SPEED QUEEN JC50EG?
FAILURE TO INSTALL, MAINTAIN, AND/OR OPERATE THIS MACHINE ACCORDING TO MANUFACTURER’S INSTRUCTIONS MAY RESULT IN CONDITIONS WHICH CAN PRODUCE SERIOUS INJURY, DEATH AND/OR PROPERTY DAMAGE.
It must be understood that common sense, caution and carefulness are factors which CANNOT be built into this tumbler. These factors MUST BE supplied by the person(s) installing, maintaining or operating the tumbler.
What should I do if my SPEED QUEEN JC50EG is not performing correctly?
To reduce the risk of fire, electrical shock, serious injury or death, do not operate the tumbler if it does not perform according to these instructions. Immediately disconnect electrical service, shut off gas supply and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.
What are the basic precautions to reduce risk when using the SPEED QUEEN JC50EG?
To reduce the risk of fire, electrical shock, serious injury or death to persons when using the tumbler unit, follow these basic precautions:
• Read all instructions before using the tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into the tumbler if the cylinder is revolving.
What materials should NOT be dried in the SPEED QUEEN JC50EG?
To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials in your SPEED QUEEN JC50EG:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
What general safety precautions should be followed when using the SPEED QUEEN JC50EG?
To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN JC50EG, follow these basic precautions:
1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
3. Do not install or store the tumbler where it will be exposed to water and/or weather.
4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
5. Run the tumbler with a load before putting it into service.
6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off the appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.
7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram. Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from the machine.
What does the primary warning label on the SPEED QUEEN JC50EG state?
The warning label states the following:
– DO NOT put articles soiled with flammable liquids or flammable cleaning solvents in the dryer.
– DO NOT store or use flammable liquids near this appliance.
– DO NOT spray or store aerosols in the vicinity of this appliance.
– Various chemicals used in laundries contain chlorine (some dry cleaning fluids, aerosols, bleaches). When decomposed in a flame, these materials may rapidly corrode and destroy this appliance.
– The dryer must be exhausted outdoors, and the area around the dryer must be free of lint because the dryer produces combustible lint.
– DO NOT dry articles containing foam rubber, plastic or similarly textured rubberlike materials.
– Use for drying water washed fabrics only.
– DO NOT put articles soiled with vegetable or cooking oil in the dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
– DO NOT reach into the dryer until all moving parts have stopped.
– DO NOT let children play in the dryer.
Where can I find the model and serial number on my SPEED QUEEN JC50EG?
The model and serial numbers for your SPEED QUEEN JC50EG will be found on the nameplate. The nameplate is located on the rear of the tumbler or underneath the door hinge.
What are the specifications for the SPEED QUEEN JC50EG?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 37″ x 30″ (94 cm x 76.2 cm) perforated galvanized steel with four baffles; 50 pounds (22.7 kg) dry weight (cotton load) |
| Motor (Nonreversing Models): | 1/2 H.P., lifetime lubricated, internal overload protected |
| Electrical Requirements (Non-Reversing Models): | 230 Volt, 50 Hertz, 1 Phase, 6.0 Amp |
| Gas Consumption: | Energy Saver Models – 95,000 BTU per hour (100.2 MJ/hr.) Standard Models – 120,000 BTU per hour (126.6 MJ/hr.) |
| Types of Gas: | Factory equipped with Natural/Mixed Gas (6-1/2 ± 1-1/2 inch water column line pressure) (1.62 ± .37 kPa); or Liquefied Petroleum gas (11 ± .3″ water column line pressure) (2.74 ± .07 kPa) |
| Gas Connection: | 1/2 inch (12.7 mm) N.P.T. |
| Air Flow: | Energy Saver Models — 390 C.F.M. at 0.5″ W.C. (185 liters/sec. at 1.25 mBar) Standard Models — 600 C.F.M. at 0.5″ W.C. (284 liters/sec. at 1.25 mBar) |
| Net Weight: | 545 Pounds (247 kg) (approximate) |
| Calorific Value: | Natural Gas — 8900 kCal/m³ (37.2 MJ/m³) L.P. Gas — 22,250 kCal/m³ (93.1 MJ/m³) |
What should I do upon receiving my SPEED QUEEN JC50EG?
Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there are signs of possible damage, have the carrier note the condition on the shipping papers before signing the receipt, or advise the carrier as soon as it is discovered. A written claim should be filed with the carrier immediately if articles are damaged or missing.
Remove the crate and protective cover as soon as possible and check items listed on the packing list.
IMPORTANT: Remove shipping tape from the two back draft dampers located in the exhaust thimble.
What materials are required for installing a gas-powered SPEED QUEEN JC50EG?
You will need to obtain the following materials locally:
• One circuit breaker.
• One gas shut-off valve for the gas service line to the tumbler.
What are the facility requirements for installing the SPEED QUEEN JC50EG?
Floor: The SPEED QUEEN JC50EG may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
Layout: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed.
Venting: For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to outdoors by the shortest possible route.
Construction: Construction must not block airflow at the top rear of the tumbler. Doing so would prevent an adequate air supply to the tumbler’s combustion chamber.
What are the exhaust venting requirements for the SPEED QUEEN JC50EG?
Properly sized exhaust ducts are essential for proper operation. Exhaust ducts must be constructed of sheet metal or other noncombustible material, equivalent in strength and corrosion resistance to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.
• Individual Venting: It is preferred to exhaust tumblers individually to the outdoors. The maximum allowable length of venting is 14 feet (4.3 m) and two 90° elbows or equivalent. If the duct length exceeds this, the duct diameter must be increased.
• Duct Joints: Do not use sheet metal screws to join vent sections. All elbows should be sweep type.
• Airflow: With the tumbler in operation, airflow at any point in the duct must be at least 1200 feet (366 m) per minute to ensure lint remains airborne.
• Clearance: Where an exhaust duct pierces a combustible wall or ceiling, an opening having a diameter of 4 inches (10.2 cm) larger than the duct diameter shall be provided, with the duct centered in the opening.
| DUCT DIAMETER | EQUIVALENT LENGTH |
|---|---|
| 6″ (15.2 cm) | One 90° elbow = 7′ (2.1 m) |
| 8″ (20.3 cm) | One 90° elbow = 9.3′ (2.83 m) |
| 10″ (25.4 cm) | One 90° elbow = 11.6′ (3.5 m) |
| 12″ (30.5 cm) | One 90° elbow = 14′ (4.3 m) |
What are the make-up air requirements for the SPEED QUEEN JC50EG?
A tumbler is a forced air exhaust and requires provisions for make-up air to replace the air exhausted by the tumbler. The manufacturer’s recommended make-up air opening for the SPEED QUEEN JC50EG is 144 square inches (928 sq. cm).
At a minimum, tumblers must have at least 1 sq. in (2.54 cm²) of opening for every 1000 BTU/hr (252 Kcal/hr) of input rating for proper combustion.
For example, a tumbler with a rated input of 120,000 BTU/hr requires 120 sq. in (774 cm²) of free opening.
Protective louvers in an opening to the outdoors can reduce air movement by approximately 40%. The opening must compensate for the area taken up by louvers.
What are the electrical requirements for a SPEED QUEEN JC50EG?
The SPEED QUEEN JC50EG is a non-reversing gas model.
| Heat Source | Electrical Specs | Wires Required and Terminal Block Connection |
|---|---|---|
| Gas & Steam (Non-Reversing Models) | 230/50/1 | L1, L2, Ground to PE Busbar |
| 208V / 240 V, 1 Phase, 50 Hz. | 208 / 240 V, 3 Phase, 50 Hz. | 380 / 415 V, 3 Phase, 50 Hz. | |
|---|---|---|---|
| Minimum Wire Size | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) |
| Circuit Breaker | 15 AMP | 15 AMP | 15 AMP |
| Poles | 2 | 3 | 3 |
NOTE: DO NOT use aluminum wire. The drying tumbler must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current.
How do I make the electrical connections to the SPEED QUEEN JC50EG?
All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
1. Install a circuit breaker, as close to the tumbler as possible. If more than one tumbler is being installed, a circuit breaker should be provided for each tumbler.
2. a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch.
For 1 Phase Units: Connect one lead to the top left connection point. Connect the other lead to the top right connection point.
For 3 Phase Units: Connect one lead to each connection point.
e. Connect a ground wire to the PE Busbar in the junction box.
3. Check electrical service phase sequence (three phase only) as follows:
a. Energize electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct. If the cylinder rotates counterclockwise, proceed with step “b”.
b. Disconnect and reverse any two leads at the connections.
4. Close the junction box cover and turn “on” the disconnect switch.
How do I position and level the SPEED QUEEN JC50EG?
Positioning:
The tumbler may be removed from its shipping skid before moving to the installation location. Remove the tumbler from the skid by unscrewing the four shipping capscrews (one at each corner). The lint panel door will have to be removed to access two front capscrews. Do not throw these four capscrews away – they are the leveling legs.
Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight of the tumbler is evenly distributed. The tumbler must not rock.
Leveling:
Each tumbler should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the clothes cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.
What are the gas requirements for the SPEED QUEEN JC50EG?
The size of the gas service pipe is dependent upon many variables (lengths, tees, etc.). Specific pipe size information should be obtained from a gas supplier. It is important that equal gas pressure be maintained at all tumbler gas connections. This can best be done by installing a one-inch pipe gas loop.
To reduce the risk of fire or explosion, if the tumbler is to be connected to Liquefied Petroleum (L.P.) gas, a vent to the outdoors must be provided in the room where the tumbler is installed.
What is the recommended setup for gas piping for the SPEED QUEEN JC50EG?
Gas loop piping must be installed to equalize gas pressure for all tumblers connected to a single gas service. Other gas-using appliances should be connected upstream from the loop. The minimum pipe size to the tumbler is 1/2″ (1.27 cm).
Line pressure must be maintained at 6-1/2″ ± 1-1/2″ water column inches (1.62 ± .37 kPa) for Natural Gas or 11 ± .3 water column inches (2.74 ± .07 kPa) for L.P. Gas with all gas appliances running. An in-line pressure regulator may be required on Natural Gas models if the line pressure exceeds eight water column inches (2.00 kPa) with all gas appliances firing.
How do I determine the correct gas pipe size for my SPEED QUEEN JC50EG installation?
Use the following table for Natural Gas at 6½ ± 1½ inch water column pressure, based on a 0.3″ water column pressure drop. You will need to know the total BTU/Hr load of all appliances on the line and the equivalent length of the pipe from the meter to the furthest appliance.
| TOTAL BTU/HR. (Kcal/hr) | EQUIVALENT LENGTH | |||||
|---|---|---|---|---|---|---|
| 25 FT. (7.63 m) |
50 FT. (15.25 m) |
75 FT. (22.88 m) |
100 FT. (30.50 m) |
125 FT. (38.13 m) |
150 FT. (45.75 m) |
|
| 100,000 (25,200) | 3/4″ | 3/4″ | 1″ | 1″ | 1″ | 1″ |
| 120,000 (30,240) | 3/4″ | 1″ | 1″ | 1″ | 1″ | 1″ |
| 140,000 (35,280) | 3/4″ | 1″ | 1″ | 1″ | 1″ | 1 1/4″ |
| 160,000 (40,320) | 3/4″ | 1″ | 1″ | 1 1/4″ | 1 1/4″ | 1 1/4″ |
| 180,000 (45,360) | 1″ | 1″ | 1″ | 1 1/4″ | 1 1/4″ | 1 1/4″ |
| 200,000 (50,400) | 1″ | 1″ | 1 1/4″ | 1 1/4″ | 1 1/4″ | 1 1/2″ |
| 300,000 (75,600) | 1″ | 1 1/4″ | 1 1/4″ | 1 1/2″ | 1 1/2″ | 1 1/2″ |
| 400,000 (100,800) | 1 1/4″ | 1 1/4″ | 1 1/2″ | 1 1/2″ | 1 1/2″ | 2″ |
| 500,000 (126,000) | 1 1/4″ | 1 1/2″ | 1 1/2″ | 2″ | 2″ | 2″ |
| 600,000 (151,200) | 1 1/2″ | 1 1/2″ | 2″ | 2″ | 2″ | 2″ |
| 700,000 (176,400) | 1 1/2″ | 2″ | 2″ | 2″ | 2″ | 2 1/2″ |
| 800,000 (201,600) | 1 1/2″ | 2″ | 2″ | 2″ | 2 1/2″ | 2 1/2″ |
How do I connect the gas supply to the SPEED QUEEN JC50EG?
Before connecting gas piping to the tumbler, make certain the gas service is the same as that specified on the nameplate. Natural Gas service must be supplied at 6½ ± 1½ inch water column pressure. L.P. Gas service must be supplied at 11 ± .3 inch water column pressure. If the gas service is not the same, DO NOT CONNECT the gas line; it will be necessary to convert the gas burner orifice and gas valve.
1. Purge air and sediment from the gas service line before connecting it loosely to the tumbler.
2. Purge the remaining air until the odor of gas is detected, then tighten the connection.
3. Use pipe compound, resistant to the actions of L.P. gas, on all pipe threads.
4. Check all pipe connections, internal and external, for gas leaks using a soapy solution. To reduce the risk of explosion or fire, DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS! Gas connections should be checked annually for leakage.
The tumbler and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.45 kPa). The tumbler must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig (3.45 kPa).
What are the requirements for building an enclosure around the SPEED QUEEN JC50EG?
When installing the SPEED QUEEN JC50EG in an enclosure, follow these guidelines. Be aware that there may be local codes and ordinances which must also be complied with.
• DO NOT block airflow at the top rear of the tumbler with laundry, etc. This would prevent an adequate air supply to the tumbler’s heat chamber.
• To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of the tumblers.
• The clearance of the tumbler cabinet from combustible construction must be a minimum of 12 inches (30.5 cm) at the top.
• 0″ clearance is permitted for the first 4″ (10.16 cm) along the front of the machine top.
• A minimum of 24″ (61 cm) clearance is recommended at the rear for maintenance purposes. 36″ (91.4 cm) is recommended.
• 0″ clearance is permitted at the sides.
How do I light and shut down the gas ignition system on the SPEED QUEEN JC50EG?
Lighting the System:
1. Turn the machine disconnect switch, located on the rear of the tumbler, to the “on” position.
2. Turn the gas shut-off valve, located on the rear of the tumbler, to the “on” position (gas valve handle should be parallel with the gas line).
3. Start the tumbler, following the operating instructions that accompanied it.
NOTE: The ignition control circuitry will verify the airflow switch is open before starting the cylinder motor. Once the motor is started, air flowing through the tumbler will close the airflow switch. The tumbler will purge air for 18 seconds. Ignition will then start by a three-second release of gas from the gas valve and sparking of the ignitor. If ignition does not occur during the first three seconds, the ignition control will “lockout,” causing the gas valve to close and a red button on the ignition control to illuminate.
To reset the ignition system, open the access door and press the red button on the ignition control. Close and lock the access door, verify that the gas shut-off valve is in the “on” position and return to step three.
Shutting Down the System:
If the tumbler will not start, remove it from service by turning the machine disconnect switch to the “off” position and turning the gas shut-off valve to the “off” position (gas valve handle should be at a right angle to the gas line).
What preliminary operating checks should be performed on the SPEED QUEEN JC50EG after installation?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals and fittings for security.
2. Check belt tension, adjust if necessary (refer to Adjustment Section).
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Turn on the gas supply at the manual gas shut off valve in the gas supply line. The handle of the gas shut off valve should be parallel with the gas supply line when in the “ON” position.
5. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop rotating, adjust the cylinder door interlock.
6. Load the tumbler with clothes or clean rags.
7. Start the tumbler and check the burner flame, adjust the gas inlet shutter if necessary.
8. Check air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.
9. Turn off the tumbler.
10. Check air flow switch operation by opening the lint panel again. Heating systems should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.
How do I perform final operating checks on my SPEED QUEEN JC50EG?
Manual Dual Timer Tumbler:
1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.
2. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light and the drying selector will rotate counterclockwise.
3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light and the cooling selector will rotate counterclockwise.
4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.
Coin Operated Tumbler:
1. Set the temperature selector to HIGH.
2. Insert the required amount of coins.
3. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start and the heat system will turn on.
4. Near the end of the cycle, a preset 2 1/2 minute cool down cycle will start.
5. When metered time expires, the motor will stop, indicating the drying cycle is finished.
Electronic Control Tumbler:
The tumbler comes equipped with Electronic Control. Electronic Control gives the owner a variety of programming options. To learn how to use Electronic Control, consult the supplemental manual.
How do I adjust the main gas burner air shutter on the SPEED QUEEN JC50EG?
NOTICE: Both air inlet shutters on the burner must be adjusted so sufficient air is metered into the system for proper combustion and maximum efficiency. Before adjusting, ensure all lint is removed from the lint compartment and lint screen.
1. Unlock and open the access door.
2. Start the tumbler and check the flame pattern. A correct air and gas mixture is indicated if the flame pattern is primarily blue, with small yellow tips, and bends to the right of the heater section. Too little air is indicated if the flame is yellow, lazy, and smokey.
3. To adjust the air shutter, loosen the air inlet shutter adjusting screw.
4. Open or close the air shutter as necessary to obtain the proper flame intensity.
5. After the air shutter is adjusted for proper flame, tighten the air shutter adjusting screw securely.
6. If the shutter is correctly adjusted, but the flame pattern is straight up, insufficient primary air is flowing through the tumbler. If the flame pattern flares to the right and left, it indicates no air is flowing through the tumbler.
How do I adjust the air flow switch on the SPEED QUEEN JC50EG?
Air flow switch operation may be affected by a clogged lint screen, lack of make-up air, or obstructions in the ducts. These conditions must be checked and corrected before adjusting the air flow switch. Always adjust air flow at installation.
NOTICE: The control panel must be in place and the access door closed before attempting to adjust the air flow switch.
The counterweight should be adjusted so airflow will force the disc away from the cabinet when the lint panel is opened 6 inches (15.24 cm) with a full load. Adjust as follows:
1. Load the tumbler.
2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening switch contacts and shutting off the heat system. This indicates proper operation.
3. If the switch is not opening as described, it should be adjusted to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest by opening the lint panel and continue moving the counterweight toward the disc until it operates correctly.
4. If the switch opens BEFORE the lint panel is opened the proper distance, it should be adjusted to be LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates correctly.
How do I adjust the loading door switch on the SPEED QUEEN JC50EG?
The loading door switch turns off the tumbler any time the loading door is opened. To adjust it, follow these steps:
1. Start the tumbler following its operating instructions.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
3. Slowly close the loading door. The loading door switch should close with an audible “click” when the loading door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
4. If the loading door switch does not close at the correct point:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the switch coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify the loading door switch operation.
How do I adjust the cylinder door strike on the SPEED QUEEN JC50EG?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of the load tumbling against it. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.
To adjust, open the door, loosen the jamnut on the door strike, and turn the door strike screw in or out as required. Retighten the jamnut when finished.
How do I adjust the drive V-belt on the SPEED QUEEN JC50EG?
To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation. Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) by applying light thumb pressure at a point midway between the sheave and motor pulley.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
4. To loosen V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
5. Replace the guard on the rear of the tumbler. The guard MUST be installed on the rear of the tumbler after belt adjustment is made.
6. The upper belt (Poly V-belt) requires no adjustment since it is self-adjusting.
What are the daily preventive maintenance tasks for the SPEED QUEEN JC50EG?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the lint compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.
6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps allow lint to flow into the ductwork system.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.
8. Replace and securely lock the lint panel.
What are the monthly preventive maintenance tasks for the SPEED QUEEN JC50EG?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
5. Reinstall the exhaust duct.
6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
7. Reinstall the vertical exhaust duct cover.
8. Inspect the entire duct work assembly and clean out all accumulated lint.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What are the quarterly preventive maintenance tasks for the SPEED QUEEN JC50EG?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
5. Shut off the gas supply at the manual gas shut off valve in the gas supply line. The handle of the gas shut off valve should be at a 90° angle to the gas supply line when in the “OFF” position.
6. Remove the screws holding the rear drive guard to the back of the tumbler.
7. Inspect belts for wear and proper tension.
8. Reinstall the rear drive guard to the back of the tumbler.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
10. Turn on the gas supply at the manual gas shut off valve in the gas supply line. The handle of the gas shut off valve should be parallel with the gas supply line when in the “ON” position.
What are the biannual preventive maintenance tasks for the SPEED QUEEN JC50EG?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.
6. Shut off the gas supply at the manual gas shut off valve in the gas supply line. The handle of the gas shut off valve should be at a 90° angle to the gas supply line when in “OFF” position.
7. Unlock and open the service panel and inspect gas connections for evidence of leakage or loose connections. NOTE: Spraying a mild solution of soap and water on joints will cause bubbles to appear on any leaking connections.
8. Close and securely lock the service panel.
9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.
10. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
11. Turn on the gas supply at the manual gas shut off valve in the gas supply line. The handle of the gas shut off valve should be parallel with the gas supply line when in “ON” position.
What is the maintenance check chart for the SPEED QUEEN JC50EG?
QUARTERLY MAINTENANCE
| Clean air vents on drive motor. |
| Clean exhaust ducts. |
| Check flow of combustion air. |
| Check flow of ventilation air. |
| Check belt tension. |
BIANNUAL MAINTENANCE
| Check for loose nuts. |
| Check for loose bolts. |
| Check for loose screws. |
| Check for loose gas connections. |
| Check for loose electrical connections. |
How do I decommission the SPEED QUEEN JC50EG?
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Turn off the gas supply external to the machine.
4. Turn off the manual gas shut-off valve on the machine.
5. Turn off the steam supply external to the machine (if applicable).
6. Remove all electric, gas, and steam connections.
CLICK HERE TO DOWNLOAD SPEED QUEEN JC50EG (01) PDF DOCUMENT
