FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN JCB50EG (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN JCB50EG (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What should I do with the instruction manual for my SPEED QUEEN JCB50EG tumbler?
Please read the enclosed instructions before using the SPEED QUEEN JCB50EG machine. It is important to KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE. If the tumbler changes ownership, this manual must accompany the tumbler. A copy of the operating instructions must remain with the tumbler after installation.
What are the basic safety precautions for using the SPEED QUEEN JCB50EG?
To reduce the risk of fire, electrical shock, serious injury or death to persons when using the SPEED QUEEN JCB50EG tumbler unit, follow these basic precautions:
• Read all instructions before using tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into tumbler if cylinder is revolving.
What types of materials should NOT be dried in the SPEED QUEEN JCB50EG to avoid fire or explosion?
To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials in your SPEED QUEEN JCB50EG:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
What are the basic precautions to reduce the risk of fire, electric shock, or injury when using the SPEED QUEEN JCB50EG dryer?
To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN JCB50EG dryer, follow these basic precautions:
1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children.
2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
3. Do not install or store the tumbler where it will be exposed to water and/or weather.
4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
5. Run tumbler with a load before putting tumbler into service.
6. Always disconnect the electrical power to the tumbler before servicing.
7. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram. Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from the machine.
What are the key warnings on the labels found on the SPEED QUEEN JCB50EG?
The warning labels on the SPEED QUEEN JCB50EG include the following critical information:
• A clothes dryer produces combustible lint. TUMBLER MUST BE EXHAUSTED OUTDOORS.
• Do not touch rotating parts.
• Do not touch surfaces until they have cooled.
• Do not operate without guards in place.
• Disconnect electrical power before servicing.
• To reduce risk of accumulating unsafe concentrations of combustion gases, the tumbler MUST BE EXHAUSTED OUTDOORS.
• **WARNING:**
– DO NOT put articles soiled with flammable liquids or flammable cleaning solvents in the dryer.
– DO NOT store or use flammable liquids near this appliance.
– DO NOT spray or store aerosols in the vicinity of this appliance.
– Various chemicals used in laundries contain chlorine. When decomposed in a flame, these materials may rapidly corrode and destroy this appliance.
– The dryer must be exhausted outdoors, and the area around the dryer must be free of lint because the dryer produces combustible lint.
– DO NOT dry articles containing foam rubber, plastic, or similarly textured rubberlike materials.
– Use for drying water-washed fabrics only.
– DO NOT put articles soiled with vegetable or cooking oil in the dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
– DO NOT reach into the dryer until all moving parts have stopped.
– DO NOT let children play in the dryer.
Where can I find the model and serial numbers on my SPEED QUEEN JCB50EG tumbler?
The model and serial numbers for your SPEED QUEEN JCB50EG will be found on the nameplate located on the rear of the tumbler or underneath the door hinge.
What are the clearance requirements for installing a SPEED QUEEN JCB50EG tumbler?
The minimum clearances to the nearest combustible material for the SPEED QUEEN JCB50EG are:
• **Top:** 12 inches (30.5 cm) Minimum. 0 inches permitted for the first 4 inches (10.2 cm) along the front of the machine.
• **Back:** 0 inches – 24 inches (61 cm) Minimum recommended for service access.
• **Sides:** 0 inches Permitted.
What are the general specifications for a 50-pound gas SPEED QUEEN JCB50EG tumbler?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 37″ x 30″ (94 cm x 76.2 cm) perforated galvanized steel with four baffles; 50 pounds (22.7 kg) dry weight (cotton load) |
| Motor (Reversing Models): | See motor size table for reversing models. |
| Electrical Requirements (Reversing Models): | 230 Volt, 50 Hertz, 1 Phase, 8.0 Amp |
| Gas Consumption: | Energy Saver Models – 95,000 BTU per hour (100.2 MJ/hr.) Standard Models – 120,000 BTU per hour (126.6 MJ/hr.) |
| Types of Gas: | Factory equipped with Natural/Mixed Gas (6-1/2 ± 1-1/2 inch water column line pressure) (1.62 ± .37 kPa); or Liquefied Petroleum gas (11 ± .3″ water column line pressure) (2.74 ± .07 kPa) |
| Gas Connection: | 1/2 inch (12.7 mm) N.P.T. |
| Air Flow: | Energy Saver Models – 390 C.F.M. at 0.5″ W.C. (185 liters/sec. at 1.25 mBar) Standard Models – 600 C.F.M. at 0.5″ W.C. (284 liters/sec. at 1.25 mBar) |
| Net Weight: | 545 Pounds (247 kg) (approximate) |
| Calorific Value: | Natural Gas — 8900 kCal/m³ (37.2 MJ/m³) L.P. Gas — 22,250 kCal/m³ (93.1 MJ/m³) |
What are the motor sizes for the different configurations of a 50 lb. SPEED QUEEN JCB50EG tumbler?
REVERSING MOTOR SIZES – 50 LB. MODELS
| GAS | ELECTRIC | STEAM (HIGH PRESSURE) | STEAM (LOW PRESSURE) | |
|---|---|---|---|---|
| FAN | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/2 H.P. |
| CYLINDER | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. |
What should I do upon receiving my new SPEED QUEEN JCB50EG tumbler?
Upon delivery, visually inspect the crate carton and parts for any visible shipping damage. If there is damage, have the carrier note the condition on the shipping papers before signing the receipt, or advise the carrier as soon as it is discovered. Remove the crate and protective cover and check the items against the packing list. File a written claim with the carrier immediately if articles are damaged or missing. IMPORTANT: Remove the shipping tape from the two back draft dampers located in the exhaust thimble.
What materials are required for installing a gas-powered SPEED QUEEN JCB50EG tumbler?
The following materials, which must be obtained locally, are required for installation:
• One circuit breaker.
• One gas shut-off valve for the gas service line to the tumbler.
What are the facility requirements for the floor, layout, and construction for a SPEED QUEEN JCB50EG tumbler?
FLOOR: The SPEED QUEEN JCB50EG tumbler may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
LAYOUT: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed.
CONSTRUCTION: Construction must not block airflow at the top rear of the tumbler. Doing so would prevent an adequate air supply to the tumbler’s combustion chamber.
What are the requirements for the exhaust duct and venting for the SPEED QUEEN JCB50EG?
Properly sized exhaust ducts are essential for the operation of your SPEED QUEEN JCB50EG. For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to the outdoors by the shortest possible route.
• Exhaust ducts shall be constructed of sheet metal or other noncombustible material, equivalent in strength and corrosion resistance to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.
• Where an exhaust duct pierces a combustible wall or ceiling, an opening 4 inches (10.2 cm) larger in diameter than the duct must be provided, with the duct centered in the opening. The space around the duct must be sealed with non-combustible material.
• **Individual Venting:** It is preferred to exhaust each tumbler individually. At no point may the cross area of the installed venting be less than the cross area of the tumbler’s exhaust thimble.
• **Collector Venting:** A main collector duct may be used if sized properly. The collector duct must be tapered, and individual tumbler ducts must enter the collector duct at a 45° angle in the direction of air flow. Never connect a tumbler duct at a 90° angle to the collector duct.
• With the tumbler in operation, airflow at any point in the duct must be at least 1200 feet (366 m) per minute to ensure that lint remains airborne.
What is the rule for equivalent venting length for the SPEED QUEEN JCB50EG’s exhaust duct?
The maximum allowable length of venting is 14 feet (4.3 m) and two 90° elbows or equivalent. Use the following table to determine the equivalent length of straight duct for 90° elbows.
| DUCT DIAMETER | EQUIVALENT LENGTH OF STRAIGHT DUCT |
|---|---|
| 6″ (15.2 cm) | One 90° elbow = 7′ (2.1 m) |
| 8″ (20.3 cm) | One 90° elbow = 9.3′ (2.83 m) |
| 10″ (25.4 cm) | One 90° elbow = 11.6′ (3.5 m) |
| 12″ (30.5 cm) | One 90° elbow = 14′ (4.3 m) |
Equivalent Length (feet) (m) = 1.17 x Duct Diameter (inches) (cm)
What are the requirements for make-up air for the SPEED QUEEN JCB50EG tumbler?
The SPEED QUEEN JCB50EG is a forced air exhausted tumbler and requires provisions for make-up air to replace the air it exhausts.
• The recommended make-up air opening is 144 square inches (928 sq. cm).
• At a minimum, the tumbler must have at least 1 sq. inch (2.54 cm²) of opening for every 1000 BTU/hr of input rating for proper combustion.
• Protective louvers in the opening can reduce air movement by approximately 40%, so the opening must be sized to compensate for the area taken up by louvers.
• Make-up air openings for a room containing the tumbler and/or other gas-fired appliances must be increased sufficiently to prevent downdrafts in any vents when all tumblers are in operation.
What are the warnings regarding venting and make-up air for the SPEED QUEEN JCB50EG?
WARNING: Solvent gases and vapors from dry cleaning machines create acids when drawn through the heater of a drying tumbler. These acids are corrosive to the drying tumbler as well as to the laundry load being dried. Be sure make-up air is free of solvent gases and vapors. If dry cleaning machines are in the same area as the tumbler, then the tumbler make-up air must come from a source free of solvent gases and vapors.
WARNING: To reduce the risk of fire and accumulation of combustible gases, DO NOT exhaust tumbler air into a window well, gas vent, chimney or enclosed, unventilated area such as an attic wall, ceiling, crawl space under a building, or concealed space of a building.
What are the minimum duct diameters for a collector duct system connected to multiple SPEED QUEEN tumblers?
| MINIMUM DIAMETER | MINIMUM DIAMETER | ||||
|---|---|---|---|---|---|
| DUCT STATION | *GAS ELECTRIC | STEAM | DUCT STATION | *GAS ELECTRIC | STEAM |
| A | 9″ (22.9 cm) | 10″ (25.4 cm) | G | 23″ (58.4 cm) | 26″ (66 cm) |
| B | 12″ (30.5 cm) | 14″ (35.6 cm) | H | 25″ (63.5 cm) | 28″ (71.1 cm) |
| C | 15″ (38.1 cm) | 17″ (43.2 cm) | I | 26″ (66 cm) | 30″ (76.2 cm) |
| D | 17″ (43.2 cm) | 20″ (50.8 cm) | J | 27″ (68.6 cm) | 31″ (78 cm) |
| E | 19″ (48.3 cm) | 22″ (55.9 cm) | K | 29″ (73.9 cm) | 33″ (83.8 cm) |
| F | 21″ (53.3 cm) | 24″ (61 cm) | L | 30″ (76.2 cm) | 34″ (86.4 cm) |
What are the electrical requirements for a reversing 50-pound gas SPEED QUEEN JCB50EG tumbler?
The SPEED QUEEN JCB50EG is a reversing model. It must be grounded. Improper connection of the equipment grounding conductor can result in a risk of electric shock. DO NOT connect a “Stinger Leg” from a three-phase service to a single-phase machine.
Terminal Block Connection for Reversing Gas & Steam Models (230/50/1):
| Heat Source | Electrical Specs | Wires Required and Terminal Block Connection | ||
|---|---|---|---|---|
| Gas & Steam | 230/50/1 | L1 | L2 | Ground to PE Busbar |
GAS AND HIGH PRESSURE STEAM DRYING TUMBLERS
| 208V / 240 V 1 Phase, 50 Hz. | 208 / 240 V 3 Phase, 50 Hz. | 380 / 415 V 3 Phase, 50 Hz. | |
|---|---|---|---|
| Minimum Wire Size | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) |
| Circuit Breaker | 15 AMP | 15 AMP | 15 AMP |
| Poles | 2 | 3 | 3 |
How do I make the electrical connections to my SPEED QUEEN JCB50EG tumbler?
WARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
Use the following steps to connect electrical service to the tumbler:
1. Install a circuit breaker, as close to the tumbler as possible. If more than one tumbler is being installed, a separate circuit breaker should be provided for each.
2. Follow these sub-steps:
a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch. For 1 Phase Units: Connect one lead to the top left connection point and the other lead to the top right connection point. For 3 Phase Units: Connect one lead to each connection point.
e. Connect a ground wire to the PE Busbar in the junction box.
3. For three-phase units only, check the electrical service phase sequence:
a. Energize electrical service and momentarily start the tumbler. Check the direction of cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct.
b. If the cylinder rotates counterclockwise, disconnect power and reverse any two leads at the connections.
4. Close the junction box cover and turn “on” the disconnect switch.
How do I properly position and level my SPEED QUEEN JCB50EG tumbler?
Positioning: The tumbler can be removed from its shipping skid before or after moving to the installation location. To remove, unscrew the four shipping capscrews (one at each corner). The lint panel door will need to be removed to access the two front capscrews. NOTE: Do not throw away these four capscrews; they are the leveling legs. Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight is evenly distributed and the tumbler does not rock.
Leveling: The SPEED QUEEN JCB50EG should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the clothes cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.
What are the gas requirements for a gas-powered SPEED QUEEN JCB50EG tumbler?
The size of the gas service pipe depends on many variables like length and fittings; specific pipe size information should be obtained from your gas supplier. It is important that equal gas pressure be maintained at all tumbler gas connections. This can be achieved by installing a one-inch pipe gas loop. Line pressure must be maintained at 6-1/2″ ± 1-1/2″ water column inches for Natural Gas, or 11 ± .3 water column inches for L.P. Gas, with all gas appliances running.
WARNING: To reduce the risk of fire or explosion, if the SPEED QUEEN JCB50EG is to be connected to Liquefied Petroleum (L.P.) gas, a vent to the outdoors must be provided in the room where the tumbler is installed.
What is the required gas pipe size for a SPEED QUEEN JCB50EG based on total BTU/hr load and pipe length?
The following table is for Natural Gas at 6½ ± 1½ inch water column pressure, based on a 0.3″ water column pressure drop.
| GAS APPLIANCES TOTAL BTU/HR. (Kcal/hr) | 25 FT. (7.63 m) | 50 FT. (15.25 m) | 75 FT. (22.88 m) | 100 FT. (30.50 m) | 125 FT. (38.13 m) | 150 FT. (45.75 m) |
|---|---|---|---|---|---|---|
| 100,000 (25,200) | 3/4″ (1.905cm) | 3/4″ (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) |
| 120,000 (30,240) | 3/4″ (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) |
| … | … | … | … | … | … | … |
| 3,000,000 (756,000) | 2 1/2″ (6.35cm) | 3″ (7.62cm) | 3 1/2″ (8.89cm) | 3 1/2″ (8.89cm) | 3 1/2″ (8.89cm) | 4″ (10.16cm) |
Note: Table has been truncated for brevity. Refer to the full table in the manual for all values.
How do I connect the gas supply to my SPEED QUEEN JCB50EG tumbler?
Before connecting, verify the gas service is the same as specified on the nameplate. Natural Gas requires 6½ ± 1½ inch water column pressure. L.P. Gas requires 11 ± .3 inch water column pressure. If service is not correct, DO NOT CONNECT; the burner orifice and gas valve must first be converted by authorized personnel.
1. Purge air and sediment from the gas service line before connecting it loosely to the tumbler.
2. Purge the remaining air until the odor of gas is detected, then tighten the connection. Use pipe compound resistant to L.P. gas on all pipe threads.
WARNING: Check all pipe connections, internal and external, for gas leaks using a soapy solution. To reduce the risk of explosion or fire, DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS! Gas connections should be checked annually for leakage.
WARNING: The tumbler and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.45 kPa). The tumbler must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig (3.45 kPa).
What are the requirements for building an enclosure around a SPEED QUEEN JCB50EG tumbler?
IMPORTANT: DO NOT block airflow at the top rear of the tumbler with laundry, etc. This would prevent an adequate air supply to the tumbler’s heat chamber.
WARNING: To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of tumblers.
• **NOTICE:** Clearance of the tumbler cabinet from combustible construction must be a minimum of 12 inches (30.5 cm) at the top.
• A 0-inch clearance is permitted for the first 4 inches (10.16 cm) along the front of the machine.
• A minimum of 24 inches (61 cm) is recommended at the rear for maintenance purposes, with 36 inches (91.4 cm) being ideal.
• The enclosure must include a provision for make-up air.
How do I light and shut down the gas ignition system on my SPEED QUEEN JCB50EG tumbler?
Lighting the System:
1. Turn the machine disconnect switch, located on the rear of the tumbler, to the “on” position.
2. Turn the gas shut-off valve, located on the rear of the tumbler, to the “on” position (gas valve handle should be parallel with the gas line).
3. Start the tumbler following its operating instructions. The ignition control circuitry will verify the airflow switch is open, then start the cylinder motor. Air flowing will close the airflow switch. The tumbler will purge air for 18 seconds, then ignition will start with a three-second release of gas and sparking of the ignitor.
NOTE: If ignition does not occur during the first three seconds, the ignition control will “lockout,” causing the gas valve to close and a red button on the ignition control to illuminate. To reset, open the access door, press the red button on the ignition control, close and lock the access door, verify the gas shut-off valve is “on,” and return to step 3.
Shutting Down the System:
If the tumbler will not start, remove it from service by turning the machine disconnect switch to the “off” position and turning the gas shut-off valve to the “off” position (handle at a right angle to the gas line).
How do I install a new accessory timing cam on a coin-operated SPEED QUEEN JCB50EG model?
Removal of Existing Cam:
1. Rotate the cam by hand until the “V” notch lines up beneath the ratchet tooth.
2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft, and lift gently off the shaft, ensuring the “V” notch clears the ratchet tooth.
Installation of New Cam:
1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.
2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press the timing cam down firmly to seat it onto the motor shaft.
4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to fully seat the timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one full cycle before an accurate measure of time can be made.
How do I calculate the cycle length for a coin-operated SPEED QUEEN JCB50EG based on the timing cam?
To figure time increments, use this formula: Timer Motor Speed (60) divided by the number of pins on the cam = Cycle Length (minutes). Cams are available with 1 to 12 pins.
Example: 60 ÷ 5 (Pin cam) = 12 minute cycle.
| No. of Pins in Cam | Cycle Length (Minutes) |
|---|---|
| 6 | 10 |
| 5 | 12 |
| 4 | 15 |
What preliminary operating checks should be performed on the SPEED QUEEN JCB50EG after installation?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals, and fittings for security.
2. Check belt tension and adjust if necessary.
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Turn on the gas supply at the manual gas shut-off valve in the gas supply line (handle parallel with the line for “ON”).
5. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If not, adjust the cylinder door interlock.
6. Load the tumbler with clothes or clean rags.
7. Start the tumbler and check the burner flame, adjusting the gas inlet shutter if necessary.
8. Check the air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.
9. Turn off the tumbler.
10. Check the air flow switch operation again by opening the lint panel. Heating systems should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.
How do I perform a final operating check on a coin-operated SPEED QUEEN JCB50EG tumbler?
1. Set the temperature selector to HIGH.
2. Insert the required amount of coins.
3. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start and the heat system will turn on.
4. Near the end of the cycle, a preset 2 1/2 minute cool down cycle will start.
5. When the metered time expires, the motor will stop, indicating the drying cycle is finished.
How do I adjust the main gas burner air shutter on my SPEED QUEEN JCB50EG for proper flame?
NOTICE: Before adjusting, ensure all lint is removed from the lint compartment and screen. Adjustments vary based on location, vent system, and gas pressure.
1. Unlock and open the access door.
2. Start the tumbler and check the flame pattern. A correct flame is primarily blue with small yellow tips and bends to the right of the heater section. A yellow, lazy, and smokey flame indicates too little air.
3. To adjust, loosen the air inlet shutter adjusting screw.
4. Open or close the air shutter as necessary to obtain the proper flame intensity.
5. After adjustment, tighten the air shutter adjusting screw securely.
6. If the shutter is correctly adjusted but the flame pattern is straight up, it indicates insufficient primary air is flowing through the tumbler. A flame that flares to the right and left indicates no air is flowing through the tumbler.
How do I adjust the air flow switch on my gas-powered SPEED QUEEN JCB50EG tumbler?
WARNING: To reduce the risk of fire, air flow switch operation may be affected by a clogged lint screen, lack of make-up air, or obstructions in ducts. These conditions must be checked and corrected before adjusting the switch. Always adjust air flow at installation.
The air flow switch is factory-set but can be adjusted as follows:
1. Load the tumbler.
2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation.
3. If the switch does not open as described, it needs to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest and continue moving the counterweight toward the disc until it operates correctly.
4. If the switch opens BEFORE the lint panel is opened 6 inches, it needs to be LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates correctly.
How do I adjust the loading door switch on my SPEED QUEEN JCB50EG?
The loading door switch turns off the tumbler when the door is opened. To adjust:
1. Start the tumbler.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
3. Slowly close the loading door. The switch should close with an audible “click” when the door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
4. If the switch does not close at the correct point:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify correct operation.
How do I adjust the cylinder door strike on my SPEED QUEEN JCB50EG?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of a tumbling load. Proper adjustment is achieved when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door. To adjust, open the door, loosen the jamnut on the door strike, and turn the door strike screw in or out as required. Retighten the jamnut when finished.
How do I adjust the drive V-belt on my SPEED QUEEN JCB50EG?
WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation. The guard MUST be reinstalled on the rear of the tumbler after belt adjustment is made.
Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) with light thumb pressure at a point midway between the sheave and motor pulley. The upper poly V-belt is self-adjusting.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten the V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut on the adjusting bolt.
4. To loosen the V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut on the adjusting bolt.
5. Replace the guard on the rear of the tumbler.
What daily preventive maintenance is required for the SPEED QUEEN JCB50EG tumbler?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately.
6. Ensure the lint screen covers the entire opening in the lint screen hood to prevent lint from flowing into the ductwork.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the probe will cause overheating.
8. Replace and securely lock the lint panel.
What monthly preventive maintenance is required for the SPEED QUEEN JCB50EG tumbler?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
5. Reinstall the exhaust duct.
6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
7. Reinstall the vertical exhaust duct cover.
8. Inspect the entire duct work assembly and clean out all accumulated lint.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What quarterly preventive maintenance is required for the SPEED QUEEN JCB50EG tumbler?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
5. Shut off the gas supply at the manual gas shut-off valve in the gas supply line (handle at 90° angle to the gas supply line for “OFF” position).
6. Remove screws holding the rear drive guard to the back of the tumbler.
7. Inspect belts for wear and proper tension.
8. Reinstall the rear drive guard to the back of the tumbler.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
10. Turn on the gas supply at the manual gas shut-off valve (handle parallel with the gas supply line for “ON” position).
What biannual preventive maintenance is required for the SPEED QUEEN JCB50EG tumbler?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals, and fittings for tightness.
6. Shut off the gas supply at the manual gas shut-off valve (handle at 90° angle for “OFF”).
7. Unlock and open the service panel and inspect gas connections for evidence of leakage or loose connections. NOTE: Spraying a mild solution of soap and water on joints will cause bubbles to appear on any leaking connections.
8. Close and securely lock the service panel.
9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose connections.
10. Close the electrical junction box cover and energize the electrical circuit by turning on the disconnect switch.
11. Turn on the gas supply at the manual gas shut-off valve (handle parallel for “ON”).
What is the maintenance check chart for the SPEED QUEEN JCB50EG?
| QUARTERLY MAINTENANCE | (DATES) |
|---|---|
| Clean air vents on drive motor. | |
| Check and clean steam coils. (Steam Models Only) | |
| Clean exhaust ducts. | |
| Check flow of combustion air. | |
| Check flow of ventilation air. | |
| Check belt tension. |
| BIANNUAL MAINTENANCE | (DATES) |
|---|---|
| Check for loose nuts. | |
| Check for loose bolts. | |
| Check for loose screws. | |
| Check for loose gas connections. | |
| Check for loose electrical connections. | |
| Check for loose steam connections. (Steam Models Only.) |
How do I decommission my SPEED QUEEN JCB50EG tumbler?
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Turn off the gas supply external to the machine.
4. Turn off the manual gas shut-off valve on the machine.
5. Turn off the steam supply external to the machine (if applicable).
6. Remove all electric, gas, and steam connections.
CLICK HERE TO DOWNLOAD SPEED QUEEN JCB50EG (01) PDF DOCUMENT
