SPEED QUEEN JCB50CSH (01) Image

FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN JCB50CSH (01) PDF OPERATING INSTRUCTIONS.


CLICK HERE TO DOWNLOAD SPEED QUEEN JCB50CSH (01) PDF DOCUMENT

If this is not the document you want for this product, click here to see if we have any other documents for this product.

How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.

NO IMAGE CONTENT AT THIS TIME. PLEASE CHECK BACK LATER

What are the basic safety precautions for using the SPEED QUEEN JCB50CSH?

To reduce the risk of fire, electrical shock, serious injury or death to persons when using the SPEED QUEEN JCB50CSH, follow these basic precautions:

• Read all instructions before using the tumbler.

• DO NOT tamper with controls.

• DO NOT bypass any safety devices.

• Always follow the fabric care instructions supplied by the garment manufacturer.

• Remove laundry immediately after the tumbler stops.

• DO NOT reach into the tumbler if the cylinder is revolving.


What materials should NOT be dried in the SPEED QUEEN JCB50CSH to avoid fire, explosion, or damage?

To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials in the SPEED QUEEN JCB50CSH:

• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.

• Plastics or articles containing foam rubber or similarly textured rubberlike materials.

• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals or thinner.

• Articles containing wax or cleaning chemicals.

• Fiberglass curtains or draperies (unless the label says it can be done).


What should I do if my SPEED QUEEN JCB50CSH is not performing correctly?

To reduce the risk of fire, electrical shock, serious injury or death, do not operate the SPEED QUEEN JCB50CSH if it does not perform according to its instructions. Immediately disconnect electrical service, shut off the gas supply, and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.


What key precautions should be followed when using the SPEED QUEEN JCB50CSH dryer?

To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN JCB50CSH, follow these basic precautions:

1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children.

2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.

3. Do not install or store the tumbler where it will be exposed to water and/or weather.

4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.

5. Run the tumbler with a load before putting it into service.

6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off the appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.

7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from the machine.


What do the various warning labels on the SPEED QUEEN JCB50CSH signify?

The following warning labels will be found on the SPEED QUEEN JCB50CSH:

• A clothes dryer produces combustible lint. TUMBLER MUST BE EXHAUSTED OUTDOORS.

• Do not touch rotating parts.

• Do not touch surface until it has cooled.

• WARNING!

• Do not operate without guards in place.

• Disconnect electrical power before servicing.

• To reduce risk of accumulating unsafe concentrations of combustion gases, tumbler MUST BE EXHAUSTED OUTDOORS.


What are the general warnings for operating the SPEED QUEEN JCB50CSH?

The main warning label on the SPEED QUEEN JCB50CSH states:

– DO NOT put articles soiled with flammable liquids or flammable cleaning solvents in dryer.

– DO NOT store or use flammable liquids near this appliance.

– DO NOT spray or store aerosols in the vicinity of this appliance.

– Various chemicals used in laundries contain chlorine. When decomposed in a flame, these materials may rapidly corrode and destroy this appliance.

– Dryer must be exhausted outdoors, and area around dryer must be free of lint because dryer produces combustible lint.

– DO NOT dry articles containing foam rubber, plastic or similarly textured rubberlike materials.

– Use for drying water washed fabrics only.

– DO NOT put articles soiled with vegetable or cooking oil in dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.

– DO NOT reach into the dryer until all moving parts have stopped.

– DO NOT let children play in the dryer.


Where can I find the model and serial numbers on my SPEED QUEEN JCB50CSH tumbler?

The model and serial numbers for the SPEED QUEEN JCB50CSH will be found on the nameplate. The nameplate is located on the rear of the tumbler or underneath the door hinge.


What are the technical specifications for the 50 Pound SPEED QUEEN JCB50CSH gas tumbler?

Cabinet Finish: Electrostatically applied thermosetting polyester
Cylinder: 37″ x 30″ (94 cm x 76.2 cm) perforated galvanized steel with four baffles; 50 pounds (22.7 kg) dry weight (cotton load)
Motor (Nonreversing Models): 1/2 H.P., lifetime lubricated, internal overload protected (See reversing models table for your specific model)
Electrical Requirements: Non-Reversing Models 230 Volt, 50 Hertz, 1 Phase, 6.0 Amp
Electrical Requirements: Reversing Models 230 Volt, 50 Hertz, 1 Phase, 8.0 Amp
Gas Consumption: Energy Saver Models – 95,000 BTU per hour (100.2 MJ/hr.)
Standard Models – 120,000 BTU per hour (126.6 MJ/hr.)
Types of Gas: Factory equipped with Natural/Mixed Gas (6-1/2 ± 1-1/2 inch water column line pressure) (1.62 ± .37 kPa); or Liquefied Petroleum gas (11 ± .3″ water column line pressure) (2.74 ± .07 kPa)
Gas Connection: 1/2 inch (12.7 mm) N.P.T.
Air Flow: Energy Saver Models — 390 C.F.M. at 0.5″ W.C. (185 liters/sec. at 1.25 mBar)
Standard Models — 600 C.F.M. at 0.5″ W.C. (284 liters/sec. at 1.25 mBar)
Net Weight: 545 Pounds (247 kg) (approximate)
Calorific Value: Natural Gas — 8900 kCal/m³ (37.2 MJ/m³)
L.P. Gas — 22,250 kCal/m³ (93.1 MJ/m³)

What are the motor sizes for the 50 lb reversing SPEED QUEEN JCB50CSH?

The motor sizes for the 50 lb reversing SPEED QUEEN JCB50CSH are as follows:

GAS ELECTRIC STEAM
HIGH PRESSURE LOW PRESSURE
50 LB. FAN 1/3 H.P. 1/3 H.P. 1/3 H.P. 1/2 H.P.
CYLINDER 1/3 H.P. 1/3 H.P. 1/3 H.P. 1/3 H.P.

What should I do upon receiving my SPEED QUEEN JCB50CSH tumbler?

Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there is damage or signs of possible damage, have the carrier note the condition on the shipping papers before signing, or advise the carrier as soon as it is discovered. A written claim should be filed with the carrier immediately if articles are damaged or missing.

Remove the crate and protective cover and check items against the packing list.

IMPORTANT: Remove the shipping tape from the two back draft dampers located in the exhaust thimble.


What materials are required for installing a gas SPEED QUEEN JCB50CSH?

The following materials, which should be obtained locally, are required for installation:

For All Gas, Electric, or Steam Tumblers:

• One circuit breaker.

For Gas Drying Tumblers Only (like the SPEED QUEEN JCB50CSH):

• One gas shut-off valve for the gas service line to each tumbler.


What facility requirements are needed for the installation of a SPEED QUEEN JCB50CSH?

FLOOR: The SPEED QUEEN JCB50CSH may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.

LAYOUT: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler, as this would prevent an adequate air supply to the tumbler’s combustion chamber.

VENTING: For maximum efficiency and minimum lint accumulation, the tumbler air must be exhausted to the outdoors by the shortest possible route.


What are the requirements for the exhaust ducting on a SPEED QUEEN JCB50CSH?

Properly sized exhaust ducts are essential for the operation of the SPEED QUEEN JCB50CSH. All elbows should be sweep type. Exhaust ducts must be constructed of sheet metal or other noncombustible material, equivalent in strength to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.

Where the exhaust duct pierces a combustible wall or ceiling, an opening with a diameter 4 inches (10.2 cm) larger than the duct must be provided, with the duct centered. The space around the duct must be sealed with non-combustible material.

Individual Venting:

It is preferred to exhaust tumblers individually to the outdoors. At no point may the cross area of the installed venting be less than the cross area of the tumbler’s exhaust thimble. The maximum allowable length of venting is 14 feet (4.3 m) with two 90° elbows or equivalent. If a longer duct is needed, the diameter must be increased.


How is the equivalent length of venting calculated for the SPEED QUEEN JCB50CSH?

The table below shows how to determine the equivalent length of straight duct for 90° elbows.

DUCT DIAMETER EQUIVALENT LENGTH OF STRAIGHT DUCT
6″ (15.2 cm) One 90° elbow = 7′ (2.1 m)
8″ (20.3 cm) One 90° elbow = 9.3′ (2.83 m)
10″ (25.4 cm) One 90° elbow = 11.6′ (3.5 m)
12″ (30.5 cm) One 90° elbow = 14′ (4.3 m)

Formula: Equivalent Length (feet) (m) = 1.17 x Duct Diameter (inches) (cm)

Example: A 6-inch (15.2 cm) diameter duct’s equivalent length of 14 feet (4.3 m) of duct and two 90° elbows is:

Equivalent length = 14 feet (4.3 m) + (2) 90° elbows

= 14 feet (4.3 m) + 7 feet (2.1 m) + 7 feet (2.1 m)

= 28 feet (8.5 m)


What are the guidelines for collector venting if multiple SPEED QUEEN JCB50CSH tumblers are installed?

While individual exhaust is preferred, a main collector duct may be used if sized correctly. The diameters should be increased if the collector length exceeds 20 feet (6.1 m).

• Collector ducts can be rectangular if the area is not reduced.

• Provisions must be made for lint removal and cleaning.

• The duct must be tapered.

• Individual tumbler ducts must enter the collector duct at a 45° angle in the direction of airflow. Never connect at a 90° angle.

• Never connect two tumbler exhaust ducts directly across from each other at the point of entry.

• The system must be designed so static back pressure measured 12 inches (30.5 cm) from the exhaust thimble does not exceed the maximum allowable pressure, measured with all tumblers running.


What are the make-up air requirements for the SPEED QUEEN JCB50CSH?

The SPEED QUEEN JCB50CSH is a forced air exhaust unit and requires make-up air to replace the exhausted air. The manufacturer’s recommended make-up air opening is 144 square inches (928 sq. cm). At a minimum, the tumbler must have at least 1 in² (2.54 cm²) of opening for every 1000 BTU/hr of input rating for proper combustion.

Protective louvers can reduce air movement by approximately 40%, so the opening size must compensate for this. Make-up air openings must be increased sufficiently to prevent downdrafts in other gravity-vented appliances in the same room.


What are the electrical requirements for a reversing gas SPEED QUEEN JCB50CSH?

The SPEED QUEEN JCB50CSH is a reversing gas model. The required wires are L1, L2, and Ground to PE Busbar. Electrical specifications depend on the service available.

Terminal Block Connection for Reversing Gas & Steam Models:

Electrical Specs Wires Required and Terminal Block Connection
230/50/1 L1 L2 Ground to PE Busbar
380-415/50/3 L1 L2 L3 Ground to PE Busbar

Gas and High Pressure Steam Drying Tumblers Requirements:

208V / 240 V, 1 Phase, 50 Hz. 208 / 240 V, 3 Phase, 50 Hz. 380 / 415 V, 3 Phase, 50 Hz.
Minimum Wire Size 14 AWG (2.081 mm²) 14 AWG (2.081 mm²) 14 AWG (2.081 mm²)
Circuit Breaker 15 AMP 15 AMP 15 AMP
Poles 2 3 3

How do I perform the electrical connections for the SPEED QUEEN JCB50CSH?

All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit before making any connections.

1. Install a circuit breaker as close to the tumbler as possible. Each tumbler should have its own circuit breaker.

2. Follow these steps:

a. Connect conduit-encased leads to the circuit breaker.

b. Turn “off” the disconnect switch on the tumbler and open the junction box.

c. Insert the conduit-encased leads through a knockout hole in the junction box.

d. Connect the wire leads to the disconnect switch:

1 Phase Units: Connect one lead to the top left connection point and the other lead to the top right connection point.

3 Phase Units: Connect one lead to each connection point.

e. Connect a ground wire to the PE Busbar in the junction box.

3. Check the electrical service phase sequence (for three-phase units only).

4. Close the junction box cover and turn “on” the disconnect switch.


How do I check the electrical service phase sequence for a three-phase SPEED QUEEN JCB50CSH?

Follow these steps to check the phase sequence for a three-phase SPEED QUEEN JCB50CSH:

a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct.

b. If the cylinder rotates counterclockwise, disconnect the power and reverse any two leads at the connections. Then re-test.


How do I position and level the SPEED QUEEN JCB50CSH?

Positioning:

The SPEED QUEEN JCB50CSH can be removed from its shipping skid before or after moving to its installation location. Unscrew the four shipping capscrews at each corner. The lint panel door may need to be removed to access the two front capscrews. NOTE: Do not throw away these four capscrews; they are the leveling legs.

Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible, ensuring all four legs rest firmly on the floor to evenly distribute the weight.

Leveling:

The SPEED QUEEN JCB50CSH should be leveled within 1/8 inch (3.2 mm) from front to rear and side to side. Check the front-to-rear level by rotating the cylinder until one rib is at the bottom, then place a level on that rib. Check the side-to-side level by placing a level on the front and rear of the top panel.


What are the gas requirements for the SPEED QUEEN JCB50CSH?

The size of the gas service pipe depends on many variables. Specific pipe size information should be obtained from your gas supplier. It is important that equal gas pressure is maintained at all tumbler gas connections, which can be achieved by installing a one-inch pipe gas loop.

WARNING: To reduce the risk of fire or explosion, if the SPEED QUEEN JCB50CSH is to be connected to Liquefied Petroleum (L.P.) gas, a vent to the outdoors must be provided in the room where the tumbler is installed.


What are the required gas pipe sizes for the SPEED QUEEN JCB50CSH based on BTU load and pipe length?

The following table shows the required gas pipe sizes for Natural Gas (.64 Specific Gravity) at 6½ ± 1½ inch water column pressure, based on a 0.3″ water column pressure drop.

GAS PIPE SIZE REQUIRED FOR 1,000 BTU NATURAL GAS — .64 SPECIFIC GRAVITY
AT 6½ ± 1½ INCH WATER COLUMN PRESSURE (1.62 ± .37 kPa)
GAS APPLIANCES TOTAL
BTU/HR. (Kcal/hr)
EQUIVALENT LENGTH
25 FT.
(7.63 m)
50 FT.
(15.25 m)
75 FT.
(22.88 m)
100 FT.
(30.50 m)
125 FT.
(38.13 m)
150 FT.
(45.75 m)
100,000 (25,200) 3/4″ (1.905cm) 3/4″ (1.905cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm)
120,000 (30,240) 3/4″ (1.905cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm)
140,000 (35,280) 3/4″ (1.905cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1 1/4″ (3.18cm)
160,000 (40,320) 3/4″ (1.905cm) 1″ (2.54cm) 1″ (2.54cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm)
180,000 (45,360) 1″ (2.54cm) 1″ (2.54cm) 1″ (2.54cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm)
200,000 (50,400) 1″ (2.54cm) 1″ (2.54cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/2″ (3.81cm)
300,000 (75,600) 1″ (2.54cm) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm)
400,000 (100,800) 1 1/4″ (3.18cm) 1 1/4″ (3.18cm) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm) 2″ (5.08cm)
500,000 (126,000) 1 1/4″ (3.18cm) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm)
600,000 (151,200) 1 1/2″ (3.81cm) 1 1/2″ (3.81cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm)
700,000 (176,400) 1 1/2″ (3.81cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2 1/2″ (6.35cm)
800,000 (201,600) 1 1/2″ (3.81cm) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2 1/2″ (6.35cm) 2 1/2″ (6.35cm)
900,000 (226,800) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2 1/2″ (6.35cm) 2 1/2″ (6.35cm) 2 1/2″ (6.35cm)
1,000,000 (252,000) 2″ (5.08cm) 2″ (5.08cm) 2″ (5.08cm) 2 1/2″ (6.35cm) 2 1/2″ (6.35cm) 2 1/2″ (6.35cm)

How do I make the gas connections to the SPEED QUEEN JCB50CSH?

Before connecting, make certain the gas service is the same as specified on the tumbler’s nameplate. If it is not the same, DO NOT CONNECT the gas line. The gas burner orifice and gas valve will need to be converted first by authorized personnel.

• NATURAL GAS service must be supplied at 6½ ± 1½ inch water column pressure (1.62 ± .37 kPa).

• L.P. GAS service must be supplied at 11 ± .3 inch water column pressure (2.74 ± .07 kPa).

Purge air and sediment from the gas service line before connecting it loosely to the tumbler. Purge the remaining air until the odor of gas is detected, then tighten the connection. Use pipe compound resistant to L.P. gas on all pipe threads.

WARNING: Check all pipe connections, internal and external, for gas leaks using a soapy solution. To reduce the risk of explosion or fire, DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS! Gas connections should be checked annually for leakage.

WARNING: The tumbler and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.45 kPa). The tumbler must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig (3.45 kPa).


What are the clearance requirements when installing a SPEED QUEEN JCB50CSH in an enclosure?

When installing the SPEED QUEEN JCB50CSH in an enclosure, follow these clearance requirements. Do not block airflow at the top rear of the tumbler.

Top: A minimum of 12 inches (30.5 cm) clearance from combustible construction must be maintained.

Front: 0″ clearance is permitted for the first 4″ (10.16 cm) of the cabinet.

Sides: 0″ clearance is permitted.

Rear: A minimum of 24″ (61 cm) is recommended for maintenance purposes, with 36″ (91.4 cm) being ideal.

WARNING: To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of the tumblers.


How do I light and shut down the gas ignition system on the SPEED QUEEN JCB50CSH?

1. Turn the machine disconnect switch, located on the rear of the tumbler, to the “on” position.

2. Turn the gas shut-off valve, located on the rear of the tumbler, to the “on” position (gas valve handle should be parallel with the gas line).

3. Start the tumbler, following the operating instructions.

NOTE: The ignition control circuitry will verify the airflow switch is open before starting the cylinder motor. Once the motor starts, air flowing through the tumbler will close the airflow switch. The tumbler will purge air for 18 seconds. Ignition will then start with a three-second release of gas and sparking of the ignitor. If ignition does not occur during the first three seconds, the ignition control will “lockout,” causing the gas valve to close and a red button on the ignition control to illuminate.

To reset the ignition system: Open the access door and press the red button on the ignition control. Close and lock the access door, verify the gas shut-off valve is in the “on” position, and return to step three.

4. To shut down: If the tumbler will not start, remove it from service by turning the machine disconnect switch to the “off” position and turning the gas shut-off valve to the “off” position (gas valve handle should be at a right angle to the gas line).


How do I install an accessory timing cam on coin-operated models of the SPEED QUEEN JCB50CSH?

Cycle length is determined by the number of pins on the cam. The formula is: Timer Motor Speed (60) divided by number of pins on cam = Cycle Length (minutes).

No. of Pins in Cam Cycle Length (Minutes)
6 10
5 12
4 15

Removal of Existing Timing Cam:

1. Rotate the cam by hand until the “V” notch lines up beneath a ratchet tooth.

2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft. Lift gently off the shaft, ensuring the “V” notch clears the ratchet tooth.

Installation of New Timing Cam:

1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.

2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.

3. Press the timing cam down firmly to seat it onto the motor shaft.

4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to the fully seated timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one cycle before an accurate measure of time can be made.


What preliminary operating checks should be performed on the SPEED QUEEN JCB50CSH after installation?

1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals, and fittings for security.

2. Check belt tension and adjust if necessary.

3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.

4. Turn on the gas supply at the manual gas shut-off valve (gas models only). The handle should be parallel with the gas supply line when “ON”.

5. Press and hold the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If it doesn’t stop, adjust the cylinder door interlock.

6. Load the tumbler with clothes or clean rags.

7. Start the tumbler and check the burner flame; adjust the gas inlet shutter if necessary.

8. Check air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.

9. Turn off the tumbler.

10. Check air flow switch operation by opening the lint panel again. The heating system should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.


How do I operate a Manual Dual Timer SPEED QUEEN JCB50CSH?

1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.

2. Press and hold the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light, and the drying selector will rotate counterclockwise.

3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light, and the cooling selector will rotate counterclockwise.

4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.


How do I adjust the main gas burner air shutter on the SPEED QUEEN JCB50CSH?

Before adjusting, ensure all lint is removed from the lint compartment and screen. Both air inlet shutters on the burner must be adjusted for proper combustion.

1. Unlock and open the access door.

2. Start the tumbler and check the flame pattern. A correct mixture is indicated if the flame is primarily blue with small yellow tips and bends to the right of the heater section. Too little air is indicated if the flame is yellow, lazy, and smokey.

3. To adjust, loosen the air inlet shutter adjusting screw.

4. Open or close the air shutter as necessary to obtain the proper flame intensity.

5. After adjustment, tighten the air shutter adjusting screw securely.

6. If the shutter is correctly adjusted but the flame pattern is straight up, it indicates insufficient primary air is flowing through the tumbler. A flame that flares to the right and left indicates no air is flowing through the tumbler.


How is the air flow switch adjusted on the SPEED QUEEN JCB50CSH?

The air flow switch is factory-set but can be adjusted if necessary. Before adjusting, ensure the control panel is in place and the access door is closed.

WARNING: Air flow switch operation can be affected by a clogged lint screen, lack of make-up air, or obstructions in ductwork. These conditions must be checked and corrected before adjusting the switch.

1. Load the tumbler.

2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation.

3. If the switch does not open as described, it needs to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest and continue moving the counterweight toward the disc until it operates correctly.

4. If the switch opens BEFORE the lint panel is opened 6 inches, it needs to be LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates correctly.


How do I adjust the loading door switch on the SPEED QUEEN JCB50CSH?

The loading door switch turns off the tumbler when the door is opened. To adjust it:

1. Start the tumbler.

2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).

3. Slowly close the loading door. The switch should close with an audible “click” when the door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).

4. If the switch does not close at the correct point:

a. Close the loading door completely.

b. Loosen the lower screw on the switch coupler and rotate the coupler COUNTERCLOCKWISE until it stops.

c. Tighten the lower screw on the switch coupler.

d. Return to step 1 to verify the adjustment.


How do I adjust the cylinder door strike on the SPEED QUEEN JCB50CSH?

The door strike must have sufficient tension to hold the loading door closed against the force of a tumbling load. Proper adjustment is achieved when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.

To adjust, open the door, loosen the jamnut on the door strike, and turn the door strike screw in or out as required. Retighten the jamnut when finished.


How do I adjust the drive V-belt on the SPEED QUEEN JCB50CSH?

WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation.

Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) with light thumb pressure at a point midway between the sheave and motor pulley. The upper Poly V-belt is self-adjusting and requires no adjustment.

1. Remove the guard from the rear of the tumbler.

2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.

3. To tighten V-belt:

a. Loosen the lower nut on the adjusting bolt.

b. Turn the bolt up until the belt has proper tension.

c. Tighten the upper and lower nut or adjusting bolt.

4. To loosen V-belt:

a. Loosen the top nut on the adjusting bolt.

b. Turn the bolt down until the belt has proper tension.

c. Tighten the upper and lower nut or adjusting bolt.

5. Replace the guard on the rear of the tumbler.

WARNING: The guard MUST be installed on the rear of the tumbler after belt adjustment is made.


What daily maintenance is required for the SPEED QUEEN JCB50CSH?

1. Make certain the drying cycle has ended.

2. Open the loading door.

3. Unlock and remove the lint panel.

4. Remove accumulated lint from the lint compartment. Lint left in the compartment will be drawn back onto the lint screen and restrict air circulation.

5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately.

6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps will allow lint to flow into the ductwork.

7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the probe will cause overheating.

8. Replace and securely lock the lint panel.


What monthly maintenance is required for the SPEED QUEEN JCB50CSH?

1. Perform daily cleaning of accumulated lint.

2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.

4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.

5. Reinstall the exhaust duct.

6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.

7. Reinstall the vertical exhaust duct cover.

8. Inspect the entire duct work assembly and clean out all accumulated lint.

9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.


What quarterly maintenance is required for the SPEED QUEEN JCB50CSH?

1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.

2. Perform daily cleaning of accumulated lint.

3. Perform monthly inspection and cleaning of accumulated lint.

4. Clean accumulated lint and other debris from the front and back motor air vents.

5. Shut off the gas supply at the manual gas shut-off valve. The handle should be at a 90° angle to the gas supply line when in the “OFF” position.

6. Remove the screws holding the rear drive guard to the back of the tumbler.

7. Inspect belts for wear and proper tension.

8. Reinstall the rear drive guard.

9. Energize the electrical circuit by turning on the disconnect switch.

10. Turn on the gas supply at the manual gas shut-off valve. The handle should be parallel with the gas supply line when in the “ON” position.


What biannual maintenance should be performed on the SPEED QUEEN JCB50CSH?

1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.

2. Perform daily cleaning of accumulated lint.

3. Perform monthly inspection and cleaning of accumulated lint.

4. Perform quarterly inspection and cleaning of accumulated lint.

5. Remove or open all panels and check accessible bolts, nuts, screws, terminals, and fittings for tightness.

6. Shut off the gas supply at the manual gas shut-off valve. The handle should be at a 90° angle to the supply line in the “OFF” position.

7. Unlock and open the service panel and inspect gas connections for evidence of leakage or loose connections. NOTE: Spraying a mild solution of soap and water on joints will cause bubbles to appear on any leaking connections.

8. Close and securely lock the service panel.

9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose connections.

10. Close the electrical junction box cover and energize the electrical circuit.

11. Turn on the gas supply at the manual gas shut-off valve. The handle should be parallel with the supply line in the “ON” position.


What is the maintenance check chart for the SPEED QUEEN JCB50CSH?

Quarterly Maintenance

Clean air vents on drive motor.
Check and clean steam coils. (Steam Models Only)
Clean exhaust ducts.
Check flow of combustion air.
Check flow of ventilation air.
Check belt tension.

Biannual Maintenance

Check for loose nuts.
Check for loose bolts.
Check for loose screws.
Check for loose gas connections.
Check for loose electrical connections.
Check for loose steam connections. (Steam Models Only.)

How do I decommission the SPEED QUEEN JCB50CSH?

1. Turn off the electrical supply external to the machine.

2. Turn off the electrical disconnect on the machine.

3. Turn off the gas supply external to the machine.

4. Turn off the manual gas shut-off valve on the machine.

5. Turn off the steam supply external to the machine (if applicable).

6. Remove all electric, gas, and steam connections.


CLICK HERE TO DOWNLOAD SPEED QUEEN JCB50CSH (01) PDF DOCUMENT


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.