FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CSH (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB75CSH (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What are the basic precautions for using the SPEED QUEEN SCB75CSH dryer?
To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN SCB75CSH, follow these basic precautions:
1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
3. Do not install or store the tumbler where it will be exposed to water and/or weather.
4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
5. Run tumbler with a load before putting tumbler into service.
6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.
7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram.
NOTE: Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from machine.
What are the essential safety warnings when operating the SPEED QUEEN SCB75CSH?
AWARNING: To reduce the risk of fire, electrical shock, serious injury or death to persons when using the SPEED QUEEN SCB75CSH unit, follow these basic precautions:
• Read all instructions before using tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into tumbler if cylinder is revolving.
What materials should not be dried in the SPEED QUEEN SCB75CSH to avoid fire or damage?
AWARNING: To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials in the SPEED QUEEN SCB75CSH:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
• DO NOT put articles soiled with vegetable or cooking oil in dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
What do the warning labels on the SPEED QUEEN SCB75CSH indicate?
The following warning labels will be found on the SPEED QUEEN SCB75CSH:
• A clothes dryer produces combustible lint. TUMBLER MUST BE EXHAUSTED OUTDOORS.
• Do not touch rotating parts.
• Do not touch surface until it has cooled.
• WARNING!
• Do not operate without guards in place.
• Disconnect electrical power before servicing.
• To reduce risk of accumulating unsafe concentrations of combustion gases, tumbler MUST BE EXHAUSTED OUTDOORS.
Where can I find the model and serial numbers on my SPEED QUEEN SCB75CSH?
When writing for information on any tumbler, be sure to mention model and serial numbers. The model and serial numbers for the SPEED QUEEN SCB75CSH will be found on the nameplate as shown on the rear of the tumbler or underneath the door hinge.
What are the specifications for the SPEED QUEEN SCB75CSH steam tumbler?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 37″ x 36″ (94 x 91.4 cm) perforated galvanized steel with four baffles; 75 pounds (34.1 kg) dry weight (cotton load) |
| Motor: (Non-reversing models) | High Pressure Steam — 3/4 H.P. Low Pressure Steam — 3/4 H.P. Both motors are lifetime lubricated, internal overload protected. (See below for reversing models.) |
| Boiler Horsepower: | High Pressure Steam (6 Coil) — 4.60 BPH (154,100 BTU/hr., 72.1 kg/hr., 38,833 kCal/hr.) Low Pressure Steam (4 Coil) — 4.00 BHP (134,000 BTU/hr., 62.7 kg/hr., 33,768 kCal/hr.) |
| Electrical Requirements: (See nameplate for voltage of your tumbler) | Low Pressure — 230 Volt, 50 Hertz, 1 Phase, 8.5 Amp High Pressure — 230 Volt, 50 Hertz, 1 Phase, 9.0 Amp |
| Air Flow: | Low Pressure — 950 C.F.M. at 0.5″ W.C. (449 liters/sec at 1.25 mBar) High Pressure — 900 C.F.M. at 0.5″ W.C. (425 liters/sec at 1.25 mBar) |
| Net Weight: | 615 Pounds (280 kg) (approx.) |
What are the reversing motor sizes for the 75 lb SPEED QUEEN SCB75CSH models?
| REVERSING MOTOR SIZES | ||||
|---|---|---|---|---|
| 75 LB. | GAS | ELECTRIC | STEAM | |
| HIGH PRESSURE | LOW PRESSURE | |||
| FAN | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/2 H.P. |
| CYLINDER | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. |
What should I do upon receiving my SPEED QUEEN SCB75CSH?
Upon delivery, visually inspect the crate carton and parts for any visible shipping damage. If the crate, carton, or cover are damaged or signs of possible damage are evident, have the carrier note the condition on shipping papers before the shipping receipt is signed, or advise the carrier of the condition as soon as it is discovered.
Remove the crate and protective cover as soon as possible and check items listed on the packing list. Advise the carrier of any damaged or missing articles as soon as possible. A written claim should be filed with the carrier immediately if articles are damaged or missing.
IMPORTANT: Remove shipping tape from two back draft dampers located in the exhaust thimble.
What materials are required for installing a SPEED QUEEN SCB75CSH steam drying tumbler?
Gas, Electric or Steam Drying Tumblers:
• One circuit breaker.
Steam Drying Tumblers Only:
• One steam shut-off gate valve for steam service line to be connected upstream of solenoid steam valve.
• Two steam shut-off gate valves for each condensate return line.
• Flexible steam hoses with a 125 psig (pounds per square inch gauge) (8.79 kg/sq. cm) working pressure for connecting steam coils.
• Two steam traps for steam coil outlet to condensate return line.
• One steam pressure relief valve rated at 125 psig. (8.79 kg/cm²).
What are the facility requirements for installing the SPEED QUEEN SCB75CSH?
FLOOR
The SPEED QUEEN SCB75CSH drying tumbler may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
LAYOUT
Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler. Doing so would prevent an adequate air supply to the tumbler’s combustion chamber.
VENTING
For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to the outdoors by the shortest possible route.
What are the requirements for individual venting on the SPEED QUEEN SCB75CSH?
For maximum efficiency and performance, it is preferred to exhaust tumbler(s) individually to outdoors. At no point may the cross area of installed venting be less than the cross area of the exhaust thimble of the tumbler.
Maximum allowable length of venting is 14 feet (4.3 m) and two 90° elbows or equivalent. If the equivalent length of a duct required for an installation exceeds the maximum allowable equivalent length, the diameter of a round duct must be increased by 10% for each additional 20 feet (6.1 m). Cross section area of a rectangular duct must be increased by 20% for each additional 20 feet (6.1 m). The table below shows how to determine equivalent venting:
| DUCT DIAMETER | EQUIVALENT LENGTH OF STRAIGHT DUCT |
|---|---|
| 6″ (15.2 cm) | One 90° elbow = 7′ (2.1 m) |
| 8″ (20.3 cm) | One 90° elbow = 9.3′ (2.83 m) |
| 10″ (25.4 cm) | One 90° elbow = 11.6′ (3.5 m) |
| 12″ (30.5 cm) | One 90° elbow = 14′ (4.3 m) |
| Equivalent Length (feet) (m) = 1.17 x Duct Diameter (inches) (cm) | |
With the tumbler in operation, airflow at any point in the duct must be at least 1200 feet (366 m) per minute to ensure that lint remains airborne.
What are the make-up air requirements for the SPEED QUEEN SCB75CSH?
A tumbler is forced air exhausted and requires provisions for make-up air to replace the air exhausted by the tumbler.
Manufacturer’s recommended make-up air opening for each tumbler is 195 square inches (1258 sq. cm) for 75 pound tumblers. At a minimum, tumblers must have at least 1 in² (2.54 cm²) of opening for every 1000 BTU/hr (252 Kcal/hr) of input rating for proper combustion.
Protective louvers in opening to outdoors can reduce air movement by approximately 40%. The opening must compensate for the area taken up by louvers.
Make-up air openings for a room containing tumbler(s) and/or gas-fired hot water heater or other gravity-vented appliances must be increased sufficiently to prevent downdrafts in any vents when all tumblers are in operation. Do not locate gravity-vented appliances between tumbler(s) and make-up air openings. If it is necessary to duct make-up air to tumbler(s), increase the area of work by 25% to compensate for any restriction in air movement.
What precaution should be taken if dry cleaning machines are in the same area as the SPEED QUEEN SCB75CSH?
AWARNING: Solvent gases and vapors from dry cleaning machines create acids when drawn through the heater of a drying tumbler. These acids are corrosive to the drying tumbler as well as to the laundry load being dried. Be sure make-up air is free of solvent gases and vapors.
If the dry cleaning machines are in the same area as the tumbler, then the tumbler make-up air must come from a source free of solvent gases and vapors.
Where should the SPEED QUEEN SCB75CSH not be exhausted to?
AWARNING: To reduce the risk of fire and accumulation of combustible gases, DO NOT exhaust tumbler air into a window well, gas vent, chimney or enclosed, unventilated area such as an attic wall, ceiling, crawl space under a building, or concealed space of a building.
What are the minimum duct diameters for a collector venting system with multiple SPEED QUEEN SCB75CSH tumblers?
| MINIMUM DIAMETER | MINIMUM DIAMETER | ||||
|---|---|---|---|---|---|
| DUCT STATION | *GAS ELECTRIC | STEAM | DUCT STATION | *GAS ELECTRIC | STEAM |
| A | 9″ (22.9 cm) | 10″ (25.4 cm) | G | 23″ (58.4 cm) | 26″ (66 cm) |
| B | 12″ (30.5 cm) | 14″ (35.6 cm) | H | 25″ (63.5 cm) | 28″ (71.1 cm) |
| C | 15″ (38.1 cm) | 17″ (43.2 cm) | I | 26″ (66 cm) | 30″ (76.2 cm) |
| D | 17″ (43.2 cm) | 20″ (50.8 cm) | J | 27″ (68.6 cm) | 31″ (78 cm) |
| E | 19″ (48.3 cm) | 22″ (55.9 cm) | K | 29″ (73.9 cm) | 33″ (83.8 cm) |
| F | 21″ (53.3 cm) | 24″ (61 cm) | L | 30″ (76.2 cm) | 34″ (86.4 cm) |
What are the electrical spec requirements for the SPEED QUEEN SCB75CSH?
| Heat Source | Electrical Specs | Wires Required and Terminal Block Connection | |||
|---|---|---|---|---|---|
| Gas & Steam | 230/50/1 | L1 | L2 | Ground to PE Busbar | |
| Electric | 208-230/50-60/3 | L1 | L2 | L3 | Ground to PE Busbar |
| Electric | 380/50/3 | L1 | L2 | L3 | Ground to PE Busbar |
| Electric | 415/50/3 | L1 | L2 | L3 | Ground to PE Busbar |
| Steam | 380/50/3 | L1 | L2 | L3 | Ground to PE Busbar |
What are the electrical wiring and circuit breaker requirements for a high-pressure steam SPEED QUEEN SCB75CSH?
| 208V / 240 V 1 Phase, 50 Hz. |
208 / 240 V 3 Phase, 50 Hz. |
380 / 415 V 3 Phase, 50 Hz. |
|
|---|---|---|---|
| Minimum Wire Size | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) |
| Circuit Breaker | 15 AMP | 15 AMP | 15 AMP |
| Poles | 2 | 3 | 3 |
How should the SPEED QUEEN SCB75CSH be grounded?
The SPEED QUEEN SCB75CSH drying tumbler must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. The drying tumbler must be connected to a grounded metal, permanent wiring system; or an equipment grounding conductor must be run with circuit conductors and connected to the PE Busbar.
AWARNING: To reduce the risk of fire and electric shock, check with a qualified serviceman for proper ground procedures. Improper connection of the equipment grounding conductor can result in a risk of electric shock.
What is the warning regarding three-phase service and the SPEED QUEEN SCB75CSH?
AWARNING: To reduce the risk of fire and electric shock, if electrical supply is coming from a three phase service, DO NOT connect a “Stinger Leg” to a single phase machine.
How do I make the electrical connections to the SPEED QUEEN SCB75CSH?
AWARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
Use the following steps to connect electrical service to the tumbler:
1. Install a circuit breaker, as close to the tumbler as possible. If more than one tumbler is being installed, a circuit breaker should be provided for each tumbler. This will make it possible to disconnect each tumbler for maintenance purposes.
2. a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch.
1 Phase Units: Connect one lead to the top left connection point. Connect the other lead to the top right connection point.
3 Phase Units: Connect one lead to each connection point.
e. Connect a ground wire to the PE Busbar in the junction box.
3. Check electrical service phase sequence (three phase only).
4. Close the junction box cover and turn “on” the disconnect switch.
How do I check the electrical service phase sequence for a three-phase SPEED QUEEN SCB75CSH?
To check the electrical service phase sequence (three phase only), follow these steps:
a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from front), the phase sequence is correct. If the cylinder rotates counterclockwise, proceed with step “b”.
b. Disconnect and reverse any two leads at the connections.
How do I position the SPEED QUEEN SCB75CSH for installation?
The tumbler may be removed from its skid before moving to the installation location or moved while still attached to the skid. Remove the tumbler from the skid by unscrewing four shipping capscrews (one at each corner) and remove the tumbler from the skid. The lint panel door will have to be removed in order to remove two front capscrews.
NOTE: Do not throw these four capscrews away — they are the leveling legs.
Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location and level. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight of the tumbler is evenly distributed. The tumbler must not rock.
How do I level the SPEED QUEEN SCB75CSH?
Each tumbler should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front to rear level by rotating the clothes cylinder until one rib is at the bottom, then place a level on the bottom rib. The side to side level should be checked by placing a level on the front and rear of the top panel.
What are the clearance and construction requirements for an enclosure around the SPEED QUEEN SCB75CSH?
IMPORTANT: DO NOT block airflow at the top rear of the tumbler with laundry, etc. Doing so would prevent adequate air supply to the tumbler’s heat chamber.
NOTICE: CLEARANCE OF TUMBLER CABINET FROM COMBUSTIBLE CONSTRUCTION MUST BE A MINIMUM OF 12 INCHES (30.5 cm) AT TOP.
A typical tumbler enclosure can touch the tumbler top and side panels. Note the following minimum and maximum dimensions. Be aware that there may be local codes and ordinances which must also be complied with.
• Top Clearance: 12″ (30.5 cm) minimum.
• Side Clearance: 0″ clearance permitted for the first 4″ (10.16 cm) from the front, then a maximum of 4″ (10.16 cm).
• Rear Clearance: 24″ (61 cm) minimum, 36″ (91.4 cm) recommended for maintenance purposes.
AWARNING: To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of tumblers.
What are the steam pressure requirements for a SPEED QUEEN SCB75CSH?
High pressure machines require a (constant) 80 to 100 psig (5.62 to 7.03 kg/sq. cm) steam service for optimum operation. Low pressure machines require a (constant) 10 to 15 psig (.70 to 1.05 kg/sq. cm) steam service for optimum operation. The size of the steam service pipe is dependent upon many variables (length, tees, high pressure system, low pressure system, etc.). Specific pipe size information should be obtained from the steam system supplier or a qualified steam fitter.
How do I install the steam solenoid valve and make the inlet connections on the SPEED QUEEN SCB75CSH?
The following steps outline the procedure for installing the steam solenoid valve and connecting steam service:
a. Install a manual shut-off gate valve in the condensate return line after the steam trap for each coil.
b. Connect the steam solenoid valve to the related steam coil inlet connection with nipples, flex hoses, unions, tee, and pressure relief valve.
c. Install a gate shut-off valve in the steam supply line. Connect the shut-off gate valve outlet to the solenoid steam valve inlet connection.
AWARNING: The flexible steam hoses connecting the solenoid steam valve to the coil inlets must have a 125 psig (pounds per square inch gauge) (8.79 kg/sq. cm) working pressure. A shut-off gate valve must be installed upstream from the solenoid steam valve. This way, steam can be shut off for maintenance purposes, or in the event the hose ruptures. The steam solenoid valve must be supported so minimum load is exerted on the steam coil inlet connections.
How do I install the steam trap and make the condensate return connections on the SPEED QUEEN SCB75CSH?
A steam trap must be installed and coil outlet connections must be connected to condensate return lines. The following steps outline the procedure:
a. Connect a flexible hose to each steam coil outlet.
b. Install a strainer to the ends of each flexible hose.
c. Install a steam trap to each strainer.
IMPORTANT: The steam trap must be installed a minimum of 10 inches (25.4 cm) below the steam coil outlet connections.
d. Install a gate shut-off valve to each steam trap.
e. Connect to condensate return lines.
AWARNING: The flexible steam hoses connecting the coil outlet connections and steam traps must have a minimum of 125 psig (pounds per square inch gauge) (8.79 kg/sq. cm.) working pressure. A shutoff gate valve must be installed downstream from each steam trap so the condensate return line can be isolated in the event a steam trap requires maintenance. Each steam trap must be supported so minimum load is exerted on the coil outlet connection.
What are the minimum pipe diameter and steam trap size for a high-pressure steam SPEED QUEEN SCB75CSH?
| TUMBLER MODEL | STEAM PRESSURE (PSI) | MINIMUM PIPE DIAMETER | STEAM TRAP SIZE (Pounds Condensate/Hour) |
|---|---|---|---|
| 75 CSL | 7-15 | 3/4″ (1.9 cm) | 140 |
| 75 CSH (SCB75CSH) | 80-100 | 3/4″ (1.9 cm) | 160 |
How do I determine the cycle length based on the number of pins in the cam for a coin-operated SPEED QUEEN SCB75CSH?
To figure time increments, use this formula: Timer Motor Speed (60) divided by number of pins on cam = Cycle Length (minutes). Cams are available with 1 to 12 pins.
Example: 60 ÷ 5 (Pin cam) = 12 minute cycle.
| No. of Pins in Cam | Cycle Length (Minutes) |
|---|---|
| 6 | 10 |
| 5 | 12 |
| 4 | 15 |
How do I remove the existing timing cam on a coin-operated SPEED QUEEN SCB75CSH?
1. Rotate the cam by hand until the “V” notch lines up beneath the ratchet tooth.
2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft. Lift gently off the shaft. Make sure that pressure is directed upward and that the “V” notch clears the ratchet tooth.
How do I install a new timing cam on a coin-operated SPEED QUEEN SCB75CSH?
1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.
2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press the timing cam down firmly to seat the timing cam onto the motor shaft.
4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to the fully seated timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one cycle before an accurate measure of time can be made.
What are the preliminary operating checks for the SPEED QUEEN SCB75CSH?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals and fittings for security.
2. Check belt tension, adjust if necessary (refer to Adjustment Section).
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop rotating, adjust the cylinder door interlock (refer to Adjustment Section).
5. Load the tumbler with clothes or clean rags.
6. Start tumbler.
7. Turn off the tumbler.
How do I operate a Manual Dual Timer SPEED QUEEN SCB75CSH?
1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.
2. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light and the drying selector will rotate counterclockwise.
3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light and the cooling selector will rotate counterclockwise.
4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.
How do I operate a Coin Operated SPEED QUEEN SCB75CSH?
1. Set the temperature selector to HIGH.
2. Insert the required amount of coins.
3. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start and the heat system will turn on.
4. Near the end of the cycle, a preset 2 1/2 minute cool down cycle will start.
5. When metered time expires, the motor will stop, indicating the drying cycle is finished.
How do I operate an Electronic Control SPEED QUEEN SCB75CSH?
The tumbler comes equipped with Electronic Control. The Electronic Control gives the owner a variety of programming options. To learn how to use the Electronic Control, consult the supplemental manual.
How do I adjust the loading door switch on the SPEED QUEEN SCB75CSH?
The loading door switch turns off the tumbler any time the loading door is opened. To adjust the loading door switch, follow these steps:
1. Start the tumbler following the operating instructions which accompanied it.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
3. Slowly close the loading door. The loading door switch should close with an audible “click” when the loading door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
4. If the loading door switch does not close at the specified distance:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the switch coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify loading door switch operation.
How do I adjust the cylinder door strike on the SPEED QUEEN SCB75CSH?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of the load tumbling against it. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.
To adjust, open the door, loosen the jamnut and turn the door strike screw in or out as required. Retighten the jamnut.
How do I check and adjust the drive V-belt on the SPEED QUEEN SCB75CSH?
AWARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation.
Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) by applying light thumb pressure at a point midway between the sheave and motor pulley.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
4. To loosen V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
5. Replace the guard on the rear of the tumbler.
6. The upper belt requires no adjustment since it is self-adjusting.
AWARNING: To reduce the risk of serious injury or death, the guard MUST be installed on the rear of the tumbler after belt adjustment is made.
What are the daily preventive maintenance tasks for the SPEED QUEEN SCB75CSH?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the lint compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.
6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps between the lint screen and lint screen hood allow lint to flow into the ductwork system, restricting air circulation.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.
8. Replace and securely lock the lint panel.
What are the monthly preventive maintenance tasks for the SPEED QUEEN SCB75CSH?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
5. Reinstall the exhaust duct.
6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
7. Reinstall the vertical exhaust duct cover.
8. Inspect the entire duct work assembly and clean out all accumulated lint.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What are the quarterly preventive maintenance tasks for the SPEED QUEEN SCB75CSH?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
6. Remove screws holding the rear drive guard to the back of the tumbler.
7. Inspect belts for wear and proper tension (refer to Adjustments section).
8. Reinstall the rear drive guard to the back of the tumbler.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What are the biannual preventive maintenance tasks for the SPEED QUEEN SCB75CSH?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.
8. Close and securely lock the service panel.
9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.
10. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
What is the preventive maintenance check chart for the SPEED QUEEN SCB75CSH?
QUARTERLY MAINTENANCE
| Task | (DATES) |
|---|---|
| Clean air vents on drive motor. | |
| Check and clean steam coils. (Steam Models Only) | |
| Clean exhaust ducts. | |
| Check flow of combustion air. | |
| Check flow of ventilation air. | |
| Check belt tension. |
BIANNUAL MAINTENANCE
| Task | (DATES) |
|---|---|
| Check for loose nuts. | |
| Check for loose bolts. | |
| Check for loose screws. | |
| Check for loose gas connections. | |
| Check for loose electrical connections. | |
| Check for loose steam connections. (Steam Models Only.) |
How do I decommission the SPEED QUEEN SCB75CSH?
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Turn off the steam supply external to the machine.
4. Remove all electric and steam connections.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB75CSH (01) PDF DOCUMENT
