SPEED QUEEN SC75CSH (01) Image

FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN SC75CSH (01) PDF OPERATING INSTRUCTIONS.


CLICK HERE TO DOWNLOAD SPEED QUEEN SC75CSH (01) PDF DOCUMENT

If this is not the document you want for this product, click here to see if we have any other documents for this product.

How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.

NO IMAGE CONTENT AT THIS TIME. PLEASE CHECK BACK LATER

What are the key safety warnings for the SPEED QUEEN SC75CSH drying tumbler?

Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.

NOTE: The WARNING and IMPORTANT instructions appearing in this manual are not meant to cover all possible conditions and situations that may occur. It must be understood that common sense, caution and carefulness are factors which CANNOT be built into this tumbler. These factors MUST BE supplied by the person(s) installing, maintaining or operating the tumbler.


What should I do if my SPEED QUEEN SC75CSH drying tumbler is not performing correctly?

To reduce the risk of fire, electrical shock, serious injury or death, do not operate the tumbler if it does not perform according to these instructions. Immediately disconnect electrical service, shut off gas supply (if applicable) and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.


What basic precautions should be followed when using the SPEED QUEEN SC75CSH tumbler?

To reduce the risk of fire, electrical shock, serious injury or death to persons when using the tumbler unit, follow these basic precautions:

• Read all instructions before using the tumbler.

• DO NOT tamper with controls.

• DO NOT bypass any safety devices.

• Always follow the fabric care instructions supplied by the garment manufacturer.

• Remove laundry immediately after the tumbler stops.

• DO NOT reach into the tumbler if the cylinder is revolving.


What materials should NOT be dried in the SPEED QUEEN SC75CSH tumbler to avoid fire or explosion?

To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials in your SPEED QUEEN SC75CSH:

• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.

• Plastics or articles containing foam rubber or similarly textured rubberlike materials.

• Articles that have traces of flammable substances like cooking oil, machine, oil, flammable chemicals or thinner.

• Articles containing wax or cleaning chemicals.

• Fiberglass curtains or draperies (unless the label says it can be done).

• DO NOT put articles soiled with vegetable or cooking oil in the dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.


What are the general safety rules for operating the SPEED QUEEN SC75CSH drying tumbler?

To reduce the risk of fire, electric shock, serious injury or death to persons when using your dryer, follow these basic precautions:

1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.

2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.

3. Do not install or store the tumbler where it will be exposed to water and/or weather.

4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.

5. Run the tumbler with a load before putting it into service.

6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off the appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.

7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram. Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from the machine.


Where can I find the model and serial numbers on my SPEED QUEEN SC75CSH tumbler?

The model and serial numbers for your SPEED QUEEN SC75CSH tumbler will be found on the nameplate located on the rear of the tumbler or underneath the door hinge.


What are the specifications for the SPEED QUEEN SC75CSH drying tumbler?

The following are the specifications for the 75 Pound (34 kg) Steam Tumblers like the SPEED QUEEN SC75CSH.

Cabinet Finish: Electrostatically applied thermosetting polyester
Cylinder: 37″ x 36″ (94 x 91.4 cm) perforated galvanized steel with four baffles; 75 pounds (34.1 kg) dry weight (cotton load)
Motor (Non-reversing models): High Pressure Steam – 3/4 H.P.
Low Pressure Steam – 3/4 H.P.
Both motors are lifetime lubricated, internal overload protected. (See below for reversing models.)
Boiler Horsepower: High Pressure Steam (6 Coil) — 4.60 BPH (154,100 BTU/hr., 72.1 kg/hr., 38,833 kCal/hr.)
Low Pressure Steam (4 Coil) — 4.00 BHP (134,000 BTU/hr., 62.7 kg/hr., 33,768 kCal/hr.)
Electrical Requirements: Low Pressure — 230 Volt, 50 Hertz, 1 Phase, 8.5 Amp
High Pressure — 230 Volt, 50 Hertz, 1 Phase, 9.0 Amp
Air Flow: Low Pressure — 950 C.F.M. at 0.5″ W.C. (449 liters/sec at 1.25 mBar)
High Pressure — 900 C.F.M. at 0.5″ W.C. (425 liters/sec at 1.25 mBar)
Net Weight: 615 Pounds (280 kg) (approx.)

REVERSING MOTOR SIZES

GAS ELECTRIC STEAM
HIGH PRESSURE LOW PRESSURE
75 LB. FAN 1/3 H.P. 1/3 H.P. 1/3 H.P. 1/2 H.P.
CYLINDER 1/3 H.P. 1/3 H.P. 1/3 H.P. 1/3 H.P.

What should I do upon receiving my SPEED QUEEN SC75CSH tumbler?

Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there are signs of possible damage, have the carrier note the condition on the shipping papers before signing the receipt, or advise the carrier as soon as it is discovered. A written claim should be filed immediately if articles are damaged or missing.

Remove the crate and protective cover as soon as possible and check items listed on the packing list.

IMPORTANT: Remove shipping tape from the two back draft dampers located in the exhaust thimble.


What materials are required for installing a SPEED QUEEN SC75CSH steam tumbler?

The following materials should be obtained locally for installation:

For All Tumblers:

• One circuit breaker.

For Steam Drying Tumblers Only (like the SPEED QUEEN SC75CSH):

• One steam shut-off gate valve for the steam service line to be connected upstream of the solenoid steam valve.

• Two steam shut-off gate valves for each condensate return line.

• Flexible steam hoses with a 125 psig (8.79 kg/sq. cm) working pressure for connecting steam coils.

• Two steam traps for the steam coil outlet to the condensate return line.

• One steam pressure relief valve rated at 125 psig (8.79 kg/cm²).


What are the facility requirements for installing the SPEED QUEEN SC75CSH?

Floor: The drying tumbler may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.

Layout: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler, as this would prevent an adequate air supply.

Venting: For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to the outdoors by the shortest possible route.

Make-Up Air: A tumbler is a forced air exhausted unit and requires provisions for make-up air to replace the air it exhausts. The recommended make-up air opening is 195 square inches (1258 sq. cm).


How should the exhaust venting be installed for the SPEED QUEEN SC75CSH?

Properly sized exhaust ducts are essential. All elbows should be sweep type. Ducts must be assembled so interior surfaces are smooth. Do not use sheet metal screws to join vent sections. Improperly sized or assembled ductwork causes excess back pressure, leading to slow drying, lint collection, and fire hazard.

Exhaust ducts must be constructed of sheet metal or other noncombustible material, equivalent in strength to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.

Individual Venting:

It is preferred to exhaust tumblers individually to the outdoors. At no point may the cross area of installed venting be less than the cross area of the tumbler’s exhaust thimble. The maximum allowable length of venting is 14 feet (4.3 m) with two 90° elbows or equivalent. The following table shows the equivalent length of straight duct for a 90° elbow:

DUCT DIAMETER EQUIVALENT LENGTH OF STRAIGHT DUCT
6″ (15.2 cm) One 90° elbow = 7′ (2.1 m)
8″ (20.3 cm) One 90° elbow = 9.3′ (2.83 m)
10″ (25.4 cm) One 90° elbow = 11.6′ (3.5 m)
12″ (30.5 cm) One 90° elbow = 14′ (4.3 m)

Collector Venting:

A main collector duct may be used if sized properly. The collector duct must be tapered. Individual tumbler ducts must enter the collector duct at a 45° angle in the direction of air flow. Never connect a tumbler duct at a 90° angle to the collector duct. The collector system must be designed so static back pressure does not exceed the maximum allowable pressure specified on the installation sticker on the rear of the tumbler.


What are the electrical requirements for the SPEED QUEEN SC75CSH steam tumbler?

The following tables show the electrical requirements for the 75 Pound (34 kg) steam tumblers. The SC75CSH is a high pressure steam model.

REQUIREMENTS

Heat Source Electrical Specs Wires Required and Terminal Block Connection
Steam 380/50/3 L1 L2 L3 Ground to PE Busbar

HIGH PRESSURE STEAM DRYING TUMBLERS

380 / 415 V, 3 Phase, 50 Hz.
Minimum Wire Size 14 AWG (2.081 mm²)
Circuit Breaker 15 AMP
Poles 3

NOTE: DO NOT use aluminum wire.


How do I make the electrical connections to the SPEED QUEEN SC75CSH?

WARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.

Use the following steps to connect electrical service to the tumbler:

1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a circuit breaker should be provided for each tumbler.

2. Perform the following steps:

a. Connect conduit-encased leads to the circuit breaker.

b. Turn “off” the disconnect switch on the tumbler and open the junction box.

c. Insert conduit-encased leads through one of the knockout holes in the junction box.

d. Connect wire leads to the disconnect switch. For 3 Phase Units, connect one lead to each connection point.

e. Connect a ground wire to the PE Busbar in the junction box.

3. For three-phase units, check the electrical service phase sequence:

a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct. If it rotates counterclockwise, proceed with step “b”.

b. Disconnect power and reverse any two leads at the connections.

4. Close the junction box cover and turn “on” the disconnect switch.


How do I properly position and level the SPEED QUEEN SC75CSH tumbler?

Positioning: The tumbler can be removed from its shipping skid by unscrewing the four shipping capscrews at each corner. The lint panel door may need to be removed to access two front capscrews. NOTE: Do not throw these four capscrews away – they are the leveling legs.

Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight is evenly distributed and the tumbler does not rock.

Leveling: The tumbler should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.


How do I install the steam connections for the SPEED QUEEN SC75CSH?

High pressure machines like the SC75CSH require a constant 80 to 100 psig (5.62 to 7.03 kg/sq. cm) steam service for optimum operation.

Installing Steam Solenoid Valve and Making Steam Inlet Connections:

1. Install a manual shut-off gate valve in the condensate return line after the steam trap for each coil.

2. Connect the steam solenoid valve to the related steam coil inlet connection with nipples, flex hoses, unions, a tee, and a pressure relief valve.

3. Install a gate shut-off valve in the steam supply line. Connect the shut-off gate valve outlet to the solenoid steam valve inlet connection.

WARNING: The flexible steam hoses connecting the solenoid steam valve to the coil inlets must have a 125 psig working pressure. A shut-off gate valve must be installed upstream from the solenoid steam valve. The steam solenoid valve must be supported so minimum load is exerted on the steam coil inlet connections.

Installing Steam Trap and Making Condensate Return Connections:

1. Connect a flexible hose to each steam coil outlet.

2. Install a strainer to the ends of each flexible hose.

3. Install a steam trap to each strainer. The steam trap must be installed a minimum of 10 inches (25.4 cm) below the steam coil outlet connections.

4. Install a gate shut-off valve to each steam trap.

5. Connect to the condensate return lines.

WARNING: The flexible steam hoses connecting the coil outlet connections and steam traps must have a minimum of 125 psig working pressure. A shutoff gate valve must be installed downstream from each steam trap so the condensate return line can be isolated for maintenance.


What are the steam connection specifications for the SPEED QUEEN SC75CSH?

TUMBLER MODEL STEAM PRESSURE (PSI) MINIMUM PIPE DIAMETER STEAM TRAP SIZE (Pounds Condensate/Hour)
75 CSH 80-100 3/4″ (1.9 cm) 160

How do I perform preliminary operating checks on the SPEED QUEEN SC75CSH?

1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals and fittings for security.

2. Check belt tension and adjust if necessary (refer to the Adjustment Section).

3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.

4. (Gas models only) Turn on gas supply at manual gas shut off valve in gas supply line.

5. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop rotating, adjust the cylinder door interlock.

6. Load the tumbler with clothes or clean rags.

7. (Gas models only) Start the tumbler and check the burner flame, adjust the gas inlet shutter if necessary.

8. (Gas and Electric models) Check air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.

9. Turn off the tumbler.

10. (Gas and Electric models) Check air flow switch operation by opening the lint panel. Heating systems should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.


How do I operate the SPEED QUEEN SC75CSH (Manual Dual Timer)?

1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.

2. Press and hold the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light and the drying selector will rotate counterclockwise.

3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light and the cooling selector will rotate counterclockwise.

4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.


How do I adjust the loading door switch on the SPEED QUEEN SC75CSH?

The loading door switch turns off the tumbler any time the loading door is opened. To adjust, follow these steps:

1. Start the tumbler following its operating instructions.

2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).

3. Slowly close the loading door. The loading door switch should close with an audible “click” when the loading door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).

4. If the loading door switch does not close at the correct distance:

a. Close the loading door completely.

b. Loosen the lower screw on the switch coupler and rotate the switch coupler COUNTERCLOCKWISE until it stops.

c. Tighten the lower screw on the switch coupler.

d. Return to step 1 to verify the loading door switch operation.


How do I adjust the cylinder door strike on the SPEED QUEEN SC75CSH?

The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of a tumbling load. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.

To adjust, open the door, loosen the jamnut on the door strike, and turn the door strike screw in or out as required. Retighten the jamnut when finished.


How do I adjust the drive V-belt on the SPEED QUEEN SC75CSH?

WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation.

Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) by applying light thumb pressure at a point midway between the sheave and motor pulley. The upper belt (Poly V-belt) is self-adjusting and requires no adjustment.

1. Remove the guard from the rear of the tumbler.

2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.

3. To tighten the V-belt:

a. Loosen the lower nut on the adjusting bolt.

b. Turn the bolt up until the belt has proper tension.

c. Tighten the upper and lower nut or adjusting bolt.

4. To loosen the V-belt:

a. Loosen the top nut on the adjusting bolt.

b. Turn the bolt down until the belt has proper tension.

c. Tighten the upper and lower nut or adjusting bolt.

5. Replace the guard on the rear of the tumbler.

WARNING: To reduce the risk of serious injury or death, the guard MUST be installed on the rear of the tumbler after the belt adjustment is made.


What are the daily preventive maintenance tasks for the SPEED QUEEN SC75CSH?

1. Make certain the drying cycle has ended.

2. Open the loading door.

3. Unlock and remove the lint panel.

4. Remove accumulated lint in the lint compartment. Lint left in the compartment will be drawn back onto the lint screen and restrict air circulation.

5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.

6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps allow lint to flow into the ductwork.

7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.

8. Replace and securely lock the lint panel.


What are the monthly preventive maintenance tasks for the SPEED QUEEN SC75CSH?

1. Perform daily cleaning of accumulated lint.

2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.

3. (Step skipped as it is a duplicate of 1)

4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.

5. Reinstall the exhaust duct.

6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.

7. Reinstall the vertical exhaust duct cover.

8. Inspect the entire duct work assembly and clean out all accumulated lint.

9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.


What are the quarterly preventive maintenance tasks for the SPEED QUEEN SC75CSH?

1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.

2. Perform daily cleaning of accumulated lint.

3. Perform monthly inspection and cleaning of accumulated lint.

4. Clean accumulated lint and other debris from the front and back motor air vents.

5. (Gas models only) Shut off gas supply.

6. Remove screws holding the rear drive guard to the back of the tumbler.

7. Inspect belts for wear and proper tension (refer to the Adjustments section).

8. Reinstall the rear drive guard to the back of the tumbler.

9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.

10. (Gas models only) Turn on gas supply.


What are the biannual preventive maintenance tasks for the SPEED QUEEN SC75CSH?

1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.

2. Perform daily cleaning of accumulated lint.

3. Perform monthly inspection and cleaning of accumulated lint.

4. Perform quarterly inspection and cleaning of accumulated lint.

5. Remove or open all panels and check accessible bolts, nuts, screws, terminals and fittings for tightness.

6. (Gas models only) Shut off gas supply.

7. (Gas models only) Unlock and open the service panel and inspect gas connections for evidence of leakage or loose connections. NOTE: Spraying a mild solution of soap and water on joints will cause bubbles to appear on any leaking connections.

8. Close and securely lock the service panel.

9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.

10. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.

11. (Gas models only) Turn on gas supply.


What is the preventive maintenance check chart for the SPEED QUEEN SC75CSH?

QUARTERLY MAINTENANCE (DATES)
Clean air vents on drive motor.
Check and clean steam coils. (Steam Models Only)
Clean exhaust ducts.
Check flow of combustion air.
Check flow of ventilation air.
Check belt tension.

BIANNUAL MAINTENANCE (DATES)
Check for loose nuts.
Check for loose bolts.
Check for loose screws.
Check for loose gas connections.
Check for loose electrical connections.
Check for loose steam connections. (Steam Models Only.)

How do I decommission the SPEED QUEEN SC75CSH tumbler?

1. Turn off the electrical supply external to the machine.

2. Turn off the electrical disconnect on the machine.

3. Turn off the gas supply external to the machine (if applicable).

4. Turn off the manual gas shut-off valve on the machine (if applicable).

5. Turn off the steam supply external to the machine.

6. Remove all electric, gas, and steam connections.


CLICK HERE TO DOWNLOAD SPEED QUEEN SC75CSH (01) PDF DOCUMENT


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.