FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN SCB75CE (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB75CE (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What are the primary safety warnings for the SPEED QUEEN SCB75CE tumbler?
Please be aware of the following important safety warnings before operating your SPEED QUEEN SCB75CE tumbler:
WARNING: FAILURE TO INSTALL, MAINTAIN, AND/OR OPERATE THIS MACHINE ACCORDING TO MANUFACTURER’S INSTRUCTIONS MAY RESULT IN CONDITIONS WHICH CAN PRODUCE SERIOUS INJURY, DEATH AND/OR PROPERTY DAMAGE.
NOTE: The WARNING and IMPORTANT instructions appearing in this manual are not meant to cover all possible conditions and situations that may occur. It must be understood that common sense, caution and carefulness are factors which CANNOT be built into this tumbler. These factors MUST BE supplied by the person(s) installing, maintaining or operating the tumbler.
WARNING: To reduce the risk of fire, electrical shock, serious injury or death to persons do not operate the tumbler if it does not perform according to these instructions. Immediately disconnect electrical service, shut off gas supply and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.
WARNING: To reduce the risk of fire, electrical shock, serious injury or death to persons when using the tumbler unit, follow these basic precautions:
• Read all instructions before using tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into tumbler if cylinder is revolving.
WARNING: To avoid creating any flammable vapors which may explode, ignite or cause corrosive damage, DO NOT dry the following materials:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine, oil, flammable chemicals or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
WARNING: To reduce the risk of serious injury, install lockable door(s) to prevent public access to rear of tumblers.
What basic precautions should be followed when using the SPEED QUEEN SCB75CE dryer?
WARNING: To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN SCB75CE dryer, follow these basic precautions:
1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
3. Do not install or store the tumbler where it will be exposed to water and/or weather.
4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
5. Run tumbler with a load before putting tumbler into service.
6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.
7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram.
NOTE: Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from machine.
NOTE: This drying tumbler produces sound rated at 65 dbA.
Where can I find the model and serial numbers on my SPEED QUEEN SCB75CE tumbler?
The model and serial numbers for your SPEED QUEEN SCB75CE will be found on the nameplate. This nameplate is located either on the rear of the tumbler or underneath the door hinge.
What are the specifications for the SPEED QUEEN SCB75CE Electric Tumbler?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 37″ x 36″ (94 x 91.4 cm) perforated galvanized steel with four baffles; 75 pounds (34.1 kg) dry weight (cotton load) |
| Motor (Non-reversing models): | 3/4 H.P., lifetime lubricated internal overload protected. (See below for reversing models.) |
| Electrical Requirements: (See nameplate for voltage of your tumbler) | 230 Volt, 50 Hertz, 3 Phase, 77 Amps 380 Volt, 50 Hertz, 3 Phase, 50 Amps 415 Volt, 50 Hertz, 3 Phase, 45 Amps |
| Element: | 30,000 Watts (all models) |
| Air Flow: | 850 C.F.M. at 0.5″ W.C. (401 liters/sec at 1.25 mBar) |
| Net Weight: | 555 Pounds (252 kg) (approximate) |
What are the reversing motor sizes for the SPEED QUEEN SCB75CE?
| GAS | ELECTRIC | STEAM | |||
|---|---|---|---|---|---|
| HIGH PRESSURE | LOW PRESSURE | ||||
| 75 LB. | FAN | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/2 H.P. |
| CYLINDER | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | |
What should I do upon receiving my SPEED QUEEN SCB75CE tumbler?
Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there are signs of possible damage, have the carrier note the condition on the shipping papers before signing the receipt, or inform the carrier as soon as it is discovered.
Remove the crate and protective cover and check the items against the packing list. Advise the carrier of any damaged or missing articles as soon as possible. A written claim should be filed with the carrier immediately if articles are damaged or missing.
IMPORTANT: Remove the shipping tape from the two back draft dampers located in the exhaust thimble.
What materials do I need for installing the SPEED QUEEN SCB75CE?
For your electric SPEED QUEEN SCB75CE tumbler, you will need to obtain one circuit breaker locally.
What are the facility requirements for the SPEED QUEEN SCB75CE?
FLOOR
The drying tumbler may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
LAYOUT
Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler, as this would prevent an adequate air supply.
VENTING
For maximum efficiency and minimum lint accumulation, tumbler air must be exhausted to the outdoors by the shortest possible route.
MAKE-UP AIR
A tumbler is a forced air exhaust and requires provisions for make-up air to replace the air exhausted by the tumbler.
What are the exhaust ducting requirements for the SPEED QUEEN SCB75CE?
Proper sized exhaust ducts are essential for proper operation. All elbows should be sweep type. Exhaust ducts must be assembled so interior surfaces are smooth to reduce lint accumulation. Do not use sheet metal screws to join vent sections.
Exhaust ducts shall be constructed of sheet metal or other noncombustible material, equivalent in strength and corrosion resistance to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.
Where an exhaust duct pierces a combustible wall or ceiling, an opening having a diameter of 4 inches (10.2 cm) larger than the duct’s diameter shall be provided, with the duct centered in the opening. The space around the duct must be sealed with non-combustible material.
Individual Venting
It is preferred to exhaust tumblers individually to the outdoors. The cross-sectional area of the installed venting must not be less than the cross-sectional area of the tumbler’s exhaust thimble. The maximum allowable length of venting is 14 feet (4.3 m) plus two 90° elbows or equivalent. With the tumbler in operation, airflow at any point in the duct must be at least 1200 feet (366 m) per minute to ensure lint remains airborne.
| DUCT DIAMETER | EQUIVALENT LENGTH OF STRAIGHT DUCT |
|---|---|
| 6″ (15.2 cm) | One 90° elbow = 7′ (2.1 m) |
| 8″ (20.3 cm) | One 90° elbow = 9.3′ (2.83 m) |
| 10″ (25.4 cm) | One 90° elbow = 11.6′ (3.5 m) |
| 12″ (30.5 cm) | One 90° elbow = 14′ (4.3 m) |
Equivalent Length (feet) (m) = 1.17 x Duct Diameter (inches) (cm)
What are the make-up air requirements for the SPEED QUEEN SCB75CE?
The recommended make-up air opening for the 75-pound SPEED QUEEN SCB75CE is 195 square inches (1258 sq. cm). At a minimum, tumblers must have at least 1 in² (2.54 cm²) of opening for every 1000 BTU/hr (252 Kcal/hr) of input rating for proper combustion.
Protective louvers in an opening to the outdoors can reduce air movement by approximately 40%. The opening must compensate for the area taken up by louvers.
If it is necessary to duct make-up air to the tumbler, increase the area of the ductwork by 25% to compensate for any restriction in air movement.
Are there any specific warnings regarding the exhaust for the SPEED QUEEN SCB75CE?
Yes. Please adhere to the following warning:
WARNING: To reduce the risk of fire and accumulation of combustible gases, DO NOT exhaust tumbler air into a window well, gas vent, chimney or enclosed, unventilated area such as an attic wall, ceiling, crawl space under a building, or concealed space of a building.
NOTE: Do not install wire mesh or screen in the exhaust opening as lint will build up and prevent proper discharge of air from tumblers. The inside of the duct shall be smooth. Do not use sheet metal screws to join sections.
What are the electrical requirements for the SPEED QUEEN SCB75CE tumbler?
The following tables outline the electrical requirements for 75 Pound (34 kg) tumblers like the SPEED QUEEN SCB75CE.
REQUIREMENTS
| Heat Source | Electrical Specs | Wires Required and Terminal Block Connection | |||
|---|---|---|---|---|---|
| Electric | 208-230/50-60/3 | L1 | L2 | L3 | Ground to PE Busbar |
| Electric | 380/50/3 | L1 | L2 | L3 | Ground to PE Busbar |
| Electric | 415/50/3 | L1 | L2 | L3 | Ground to PE Busbar |
ELECTRIC DRYING TUMBLERS
NOTE: DO NOT use aluminum wire.
| 380 V, 3 Ph, 50 Hz. | 415 V, 3 Ph, 50 Hz. | |
|---|---|---|
| Minimum Wire Size | 6 AWG (13.32 mm²) | 6 AWG (13.32 mm²) |
| AMP Rating | 48 Amp | 45 Amp |
| Circuit Breaker | 50 Amp | 50 Amp |
| Poles | 3 | 3 |
How do I properly ground the SPEED QUEEN SCB75CE?
Your SPEED QUEEN SCB75CE tumbler must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. The tumbler must be connected to a grounded metal, permanent wiring system; or an equipment grounding conductor must be run with the circuit conductors and connected to the PE Busbar.
WARNING: To reduce the risk of fire and electric shock, check with a qualified serviceman for proper grounding procedures. Improper connection of the equipment grounding conductor can result in a risk of electric shock.
WARNING: To reduce the risk of fire and electric shock, if electrical supply is coming from a three phase service, DO NOT connect a “Stinger Leg” to a single phase machine.
How do I make the electrical connections to the SPEED QUEEN SCB75CE?
WARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
Use the following steps to connect electrical service to the tumbler:
1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a separate circuit breaker should be provided for each.
2. Making connections:
a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert the conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch.
e. Connect a ground wire to the PE Busbar in the junction box.
3. Check electrical service phase sequence (three phase only) as follows:
a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct. If it rotates counterclockwise, proceed with step “b”.
b. Disconnect and reverse any two leads at the connections.
4. Close the junction box cover and turn “on” the disconnect switch.
How should I position and level the SPEED QUEEN SCB75CE tumbler?
Positioning
The tumbler can be removed from its shipping skid before or after moving to its installation location. To remove it from the skid, unscrew the four shipping capscrews (one at each corner). The lint panel door will need to be removed to access two front capscrews.
NOTE: Do not throw these four capscrews away — they are the leveling legs.
Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight is evenly distributed and the tumbler does not rock.
Leveling
The tumbler should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.
What are the preliminary operating checks for the SPEED QUEEN SCB75CE?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals and fittings for security.
2. Check belt tension, adjust if necessary (refer to Adjustment Section).
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Load the tumbler with clothes or clean rags.
5. Press and hold in the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop rotating, adjust the cylinder door interlock.
6. Check the air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.
7. Turn off the tumbler.
8. Check air flow switch operation again by opening the lint panel. Heating systems should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.
How do I perform the final operating checks on the SPEED QUEEN SCB75CE?
Coin Operated Tumbler
1. Set temperature selector to HIGH.
2. Insert the required amount of coins.
3. Press and hold in the Push-to-Start Button for approximately three (3) seconds. The motor will start and the heat system will turn on.
4. Near the end of the cycle a preset 2 1/2 minute cool down cycle will start.
5. When metered time expires, the motor will stop, indicating the drying cycle is finished.
Electronic Control Tumbler
Your SPEED QUEEN SCB75CE comes equipped with Electronic Control, which gives the owner a variety of programming options. To learn how to use the Electronic Control, consult the supplemental manual.
How do I adjust the air flow switch on my SPEED QUEEN SCB75CE?
The air flow switch is factory-set for proper operation. If an adjustment is needed, follow these steps:
WARNING: To reduce the risk of fire, air flow switch operation may be affected by a clogged lint screen, lack of make-up air, or obstructions in the ducts. These conditions must be checked and corrected before adjusting the air flow switch. Always adjust air flow at installation.
The counterweight should be adjusted so airflow will force the disc away from the cabinet when the lint panel is opened 6 inches (15.24 cm) with a full load. Adjust as follows:
1. Load the tumbler.
2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation.
3. If the switch does not open as described, it needs to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest and continue moving the counterweight toward the disc until it operates correctly.
4. If the switch opens BEFORE the lint panel is opened the proper distance, it is LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates correctly.
How do I adjust the loading door switch on the SPEED QUEEN SCB75CE?
The loading door switch turns off the tumbler anytime the loading door is opened. To adjust it, follow these steps:
1. Start the tumbler following its operating instructions.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3 inches (7.5 cm) plus or minus 1/4 inch (0.635 cm).
3. Slowly close the loading door. The switch should close with an audible “click” when the door is closed 3 inches (7.5 cm) plus or minus 1/4 inch (0.635 cm).
4. If the switch does not close at the correct position:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify the loading door switch operation.
How do I adjust the cylinder door strike on the SPEED QUEEN SCB75CE?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of the tumbling load. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.
To adjust, open the door, loosen the jamnut on the door strike, and turn the door strike screw in or out as required. Once adjusted, retighten the jamnut.
How do I adjust the drive V-belt on the SPEED QUEEN SCB75CE?
WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation.
Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) by applying light thumb pressure at a point midway between the sheave and motor pulley.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten the V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
4. To loosen the V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
5. Replace the guard on the rear of the tumbler.
6. The upper belt (Poly V-belt) requires no adjustment as it is self-adjusting.
WARNING: To reduce the risk of serious injury or death, the guard MUST be installed on the rear of the tumbler after belt adjustment is made.
What daily preventive maintenance is required for the SPEED QUEEN SCB75CE?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.
6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps between the lint screen and hood allow lint to flow into the ductwork.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.
8. Replace and securely lock the lint panel.
What monthly preventive maintenance should be performed on the SPEED QUEEN SCB75CE?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
5. Reinstall the exhaust duct.
6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
7. Reinstall the vertical exhaust duct cover.
8. Inspect the entire duct work assembly and clean out all accumulated lint.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What is the quarterly preventive maintenance schedule for the SPEED QUEEN SCB75CE?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
6. Remove the screws holding the rear drive guard to the back of the tumbler.
7. Inspect belts for wear and proper tension (refer to the Adjustments section).
8. Reinstall the rear drive guard to the back of the tumbler.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What biannual preventive maintenance is needed for the SPEED QUEEN SCB75CE?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals, and fittings for tightness.
8. Close and securely lock the service panel.
9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.
10. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
Is there a maintenance check chart for the SPEED QUEEN SCB75CE?
Yes, you can use the following chart to track maintenance tasks.
| QUARTERLY MAINTENANCE | (DATES) |
|---|---|
| Clean air vents on drive motor. | |
| Check and clean steam coils. (Steam Models Only) | |
| Clean exhaust ducts. | |
| Check flow of combustion air. | |
| Check flow of ventilation air. | |
| Check belt tension. |
| BIANNUAL MAINTENANCE | (DATES) |
|---|---|
| Check for loose nuts. | |
| Check for loose bolts. | |
| Check for loose screws. | |
| Check for loose gas connections. | |
| Check for loose electrical connections. | |
| Check for loose steam connections. (Steam Models Only.) |
How do I decommission the SPEED QUEEN SCB75CE tumbler?
Follow these steps to decommission the machine:
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Turn off the gas supply external to the machine (if applicable).
4. Turn off the manual gas shut-off valve on the machine (if applicable).
5. Turn off the steam supply external to the machine (if applicable).
6. Remove all electric, gas, and steam connections.
How do I install an accessory timing cam on my SPEED QUEEN SCB75CE (Coin Meter Models)?
Cams that allow other timer increments are available. To figure time increments, use this formula: Timer Motor Speed (60) divided by number of pins on cam = Cycle Length (minutes). Cams are available with 1 to 12 pins.
Example: 60 ÷ 5 (Pin cam) = 12 minute cycle.
| No. of Pins in Cam | Cycle Length (Minutes) |
|---|---|
| 6 | 10 |
| 5 | 12 |
| 4 | 15 |
REMOVAL OF EXISTING TIMING CAM
1. Rotate the cam by hand until the “V” notch lines up beneath the ratchet tooth.
2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft. Lift gently off the shaft. Ensure that pressure is directed upward and that the “V” notch clears the ratchet tooth.
INSTALLATION OF NEW TIMING CAM
1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.
2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press the timing cam down firmly to seat it onto the motor shaft.
4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to the fully seated timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one cycle before an accurate measure of time can be made.
CLICK HERE TO DOWNLOAD SPEED QUEEN SCB75CE (01) PDF DOCUMENT
