FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF DOCUMENT.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF USER GUIDE.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF USER MANUAL.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF OWNER GUIDE.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF OWNER MANUAL.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF REFERENCE GUIDE.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF INSTRUCTION GUIDE.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF REFERENCE MANUAL.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF INSTRUCTION MANUAL.
FREE ENGLISH SPEED QUEEN JCB75CSH (01) PDF OPERATING INSTRUCTIONS.
CLICK HERE TO DOWNLOAD SPEED QUEEN JCB75CSH (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What should I do if my SPEED QUEEN JCB75CSH tumbler is not performing correctly?
To reduce the risk of fire, electrical shock, serious injury or death, do not operate the SPEED QUEEN JCB75CSH tumbler if it does not perform according to these instructions. Immediately disconnect electrical service, shut off the gas supply, and contact an authorized service representative. Service and repairs are to be performed by authorized service representatives only.
What are the basic safety precautions to reduce the risk of fire, electrical shock, or injury when using the SPEED QUEEN JCB75CSH?
When using the SPEED QUEEN JCB75CSH tumbler unit, follow these basic precautions:
• Read all instructions before using the tumbler.
• DO NOT tamper with controls.
• DO NOT bypass any safety devices.
• Always follow the fabric care instructions supplied by the garment manufacturer.
• Remove laundry immediately after the tumbler stops.
• DO NOT reach into the tumbler if the cylinder is revolving.
What materials should NOT be dried in the SPEED QUEEN JCB75CSH to avoid flammable vapors?
To avoid creating any flammable vapors which may explode, ignite, or cause corrosive damage, DO NOT dry the following materials in the SPEED QUEEN JCB75CSH:
• Articles that have been cleaned in, soaked in, washed in or spotted with gasoline, dry cleaning solvents or other flammable/explosive substances.
• Plastics or articles containing foam rubber or similarly textured rubberlike materials.
• Articles that have traces of flammable substances like cooking oil, machine oil, flammable chemicals, or thinner.
• Articles containing wax or cleaning chemicals.
• Fiberglass curtains or draperies (unless the label says it can be done).
What are the general safety precautions for using the SPEED QUEEN JCB75CSH dryer?
To reduce the risk of fire, electric shock, serious injury or death to persons when using your SPEED QUEEN JCB75CSH dryer, follow these basic precautions:
1. Do not allow children to play on or in the tumbler. Close supervision of children is necessary when the tumbler is used near children. This is a safety rule for all appliances.
2. Before the tumbler is removed from service or discarded, remove the door to the drying compartment.
3. Do not install or store the tumbler where it will be exposed to water and/or weather.
4. Failure to install, maintain, and/or operate this machine according to the manufacturer’s instructions may result in conditions which can produce serious injury, death and/or property damage.
5. Run the tumbler with a load before putting it into service.
6. Always disconnect the electrical power to the tumbler before servicing. Disconnect power by shutting off the appropriate circuit breaker or fuse and by turning off the disconnect switch located on the rear of the tumbler.
7. All manually operated models are factory-equipped with an emergency stop button located on the front panel. If the emergency stop function is desired on coin-operated models, an external emergency stop switch may be installed as specified on the machine wiring diagram. NOTE: Activation of the emergency stop switch stops all machine control circuit functions, but does not remove all electrical power from the machine.
What do the warning labels on the SPEED QUEEN JCB75CSH mean?
The following warning labels and their meanings will be found on the SPEED QUEEN JCB75CSH drying tumbler:
• A clothes dryer produces combustible lint. TUMBLER MUST BE EXHAUSTED OUTDOORS.
• Do not touch rotating parts.
• Do not touch surface until it has cooled.
• WARNING!
• Do not operate without guards in place.
• Disconnect electrical power before servicing.
• To reduce risk of accumulating unsafe concentrations of combustion gases, tumbler MUST BE EXHAUSTED OUTDOORS.
A larger warning label provides the following information:
– DO NOT put articles soiled with flammable liquids or flammable cleaning solvents in dryer.
– DO NOT store or use flammable liquids near this appliance.
– DO NOT spray or store aerosols in the vicinity of this appliance.
– Various chemicals used in laundries contain chlorine (some dry cleaning fluids, aerosols, bleaches). When decomposed in a flame, these materials may rapidly corrode and destroy this appliance.
– Dryer must be exhausted outdoors, and area around dryer must be free of lint because dryer produces combustible lint.
– DO NOT dry articles containing foam rubber, plastic or similarly textured rubberlike materials.
– Use for drying water washed fabrics only.
– DO NOT put articles soiled with vegetable or cooking oil in dryer as these oils may not be removed during washing. Due to the remaining oil, the fabric may catch on fire by itself.
– DO NOT reach into the dryer until all moving parts have stopped.
– DO NOT let children play in the dryer.
Where can I find the model and serial numbers on my SPEED QUEEN JCB75CSH?
When writing for information on your SPEED QUEEN JCB75CSH tumbler, be sure to mention the model and serial numbers. These numbers will be found on the nameplate as shown on the rear of the tumbler or underneath the door hinge.
What are the specifications for the SPEED QUEEN JCB75CSH Gas Tumbler?
| Cabinet Finish: | Electrostatically applied thermosetting polyester |
| Cylinder: | 37″ x 36″ (94 x 91.4 cm) perforated galvanized steel with four baffles; 75 pounds (34.1 kg) dry weight (cotton load) |
| Motor (Non-reversing models): | 3/4 H.P., lifetime lubricated, internal overload protected. (See below for reversing models.) |
| Electrical Requirements Nonreversing Models: | 230 Volt, 50 Hertz, 1 Phase, 9.0 Amp |
| Electrical Requirements Reversing Models: | 230 Volt, 50 Hertz, 1 Phase, 9.0 Amp |
| Gas Consumption: | 165,000 B.T.U. per hour (174.1 MJ/hr.) |
| Types of Gas: | Factory equipped with Natural/Mixed gas (6-1/2 A 1-1/2 inch water column line pressure) (1.62 A .37 kPa); or Liquefied Petroleum gas (11.0 A .3 inch water column line pressure) (2.74 A .07 kPa) |
| Gas Connection: | 1/2 inch (12.7 mm) N.P.T. |
| Air Flow: | 1000 C.F.M. at 0.5″ W.C. (472 liters/sec. at 1.25 mBar) |
| Net Weight: | 550 Pounds (250 kg) (approximate) |
| Calorific Value: | Natural Gas — 8900 kCal/m³ (37.2 MJ/m³) L.P. Gas — 22250 kCal/m³ (93.1 MJ/m³) |
What are the reversing motor sizes for the 75 lb. SPEED QUEEN JCB75CSH?
| REVERSING MOTOR SIZES | ||||
|---|---|---|---|---|
| GAS | ELECTRIC | STEAM | ||
| HIGH PRESSURE | LOW PRESSURE | |||
| FAN | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/2 H.P. |
| 75 LB. CYLINDER | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. | 1/3 H.P. |
What should I do upon receiving my SPEED QUEEN JCB75CSH tumbler?
Upon delivery, visually inspect the crate, carton, and parts for any visible shipping damage. If there are signs of possible damage, have the carrier note the condition on the shipping papers before signing the receipt, or advise the carrier as soon as it is discovered. A written claim should be filed with the carrier immediately if articles are damaged or missing.
Remove the crate and protective cover as soon as possible and check items listed on the packing list.
IMPORTANT: Remove shipping tape from the two back draft dampers located in the exhaust thimble.
What materials are required for installing a SPEED QUEEN JCB75CSH Gas Drying Tumbler?
The following materials should be obtained locally for installation:
• One circuit breaker.
• One gas shut-off valve for the gas service line to each tumbler.
What are the floor and layout requirements for installing the SPEED QUEEN JCB75CSH?
Floor: The SPEED QUEEN JCB75CSH drying tumbler may be installed on any level floor capable of supporting 100 pounds per square foot (488 kg/m²). Floor covering materials such as carpeting or tile should be removed.
Layout: Whenever possible, the tumbler should be installed along an outside wall where duct length can be kept to a minimum, and make-up air can be easily accessed. Construction must not block airflow at the top rear of the tumbler, as this would prevent an adequate air supply to the tumbler’s combustion chamber.
How do I properly install exhaust ducts for the SPEED QUEEN JCB75CSH?
Properly sized exhaust ducts are essential for proper operation. All elbows should be sweep type. Exhaust ducts must be assembled so interior surfaces are smooth to reduce lint accumulation. Do not use sheet metal screws to join vent sections.
Exhaust ducts shall be constructed of sheet metal or other noncombustible material, equivalent in strength and corrosion resistance to galvanized sheet steel not less than 0.0195 inches (0.495 mm) thick.
Where an exhaust duct pierces a combustible wall or ceiling, an opening with a diameter 4 inches (10.2 cm) larger than the duct diameter must be provided, with the duct centered in the opening. The space around the duct must be sealed with non-combustible material.
Individual Venting: It is preferred to exhaust tumblers individually to the outdoors. At no point may the cross area of the installed venting be less than the cross area of the tumbler’s exhaust thimble. The maximum allowable length of venting is 14 feet (4.3 m) and two 90° elbows or equivalent. If the required duct length exceeds this, the diameter must be increased.
How is the equivalent length of venting calculated for the SPEED QUEEN JCB75CSH?
The table below shows how to determine equivalent venting length.
| DUCT DIAMETER | EQUIVALENT LENGTH OF STRAIGHT DUCT |
|---|---|
| 6″ (15.2 cm) | One 90° elbow = 7′ (2.1 m) |
| 8″ (20.3 cm) | One 90° elbow = 9.3′ (2.83 m) |
| 10″ (25.4 cm) | One 90° elbow = 11.6′ (3.5 m) |
| 12″ (30.5 cm) | One 90° elbow = 14′ (4.3 m) |
| Equivalent Length (feet) (m) = 1.17 x Duct Diameter (inches) (cm) | |
Example: A 6-inch (15.2 cm) diameter duct’s equivalent length of 14 feet (4.3 m) of duct and two 90° elbows is:
Equivalent length = 14 feet (4.3 m) + (2) 90° elbows
= 14 feet (4.3 m) + 7 feet (2.1 m) + 7 feet (2.1 m)
= 28 feet (8.5 m)
What are the requirements for collector venting if I am venting multiple SPEED QUEEN JCB75CSH tumblers together?
While individual exhaust is preferred, a main collector duct may be used if sized correctly. Diameters should be increased if the collector length exceeds 20 feet (6.1 m).
• The collector duct may be rectangular as long as the area is not reduced. Provisions for lint removal are necessary.
• The collector duct must be tapered.
• Individual tumbler ducts must enter the collector duct at a 45° angle in the direction of airflow.
• Never connect a tumbler duct at a 90° angle to the collector duct.
• Never connect two tumbler exhaust ducts directly across from each other at the point of entry.
• The system must be designed so the static back pressure measured 12 inches (30.5 cm) from the exhaust thimble does not exceed the maximum allowable pressure specified on the installation sticker on the rear of the tumbler, measured with all tumblers running.
What are the make-up air requirements for the SPEED QUEEN JCB75CSH?
The SPEED QUEEN JCB75CSH is a forced air exhaust tumbler and requires make-up air to replace the exhausted air. The recommended make-up air opening is 195 square inches (1258 sq. cm) for 75 pound tumblers. At a minimum, tumblers must have at least 1 sq. inch (2.54 sq. cm) of opening for every 1000 BTU/hr of input rating for proper combustion.
Protective louvers can reduce air movement by approximately 40%, so the opening must be sized to compensate. Make-up air openings must be increased sufficiently to prevent downdrafts in any vents if other gas-fired appliances are in the same room.
What are the warnings regarding solvent gases and make-up air for the SPEED QUEEN JCB75CSH?
Solvent gases and vapors from dry cleaning machines create corrosive acids when drawn through the heater of a drying tumbler. These acids are corrosive to the tumbler and the laundry load. Ensure the make-up air is free of solvent gases and vapors. If dry cleaning machines are in the same area as the tumbler, the make-up air must come from a source free of these contaminants.
Where should the exhaust from the SPEED QUEEN JCB75CSH NOT be vented?
To reduce the risk of fire and accumulation of combustible gases, DO NOT exhaust tumbler air from the SPEED QUEEN JCB75CSH into a window well, gas vent, chimney, or enclosed, unventilated area such as an attic, wall, ceiling, crawl space under a building, or concealed space of a building.
What are the minimum diameter requirements for a collector exhaust duct system for multiple SPEED QUEEN JCB75CSH tumblers?
| MINIMUM DIAMETER | MINIMUM DIAMETER | ||||
|---|---|---|---|---|---|
| DUCT STATION | *GAS ELECTRIC | STEAM | DUCT STATION | *GAS ELECTRIC | STEAM |
| A | 9″ (22.9 cm) | 10″ (25.4 cm) | G | 23″ (58.4 cm) | 26″ (66 cm) |
| B | 12″ (30.5 cm) | 14″ (35.6 cm) | H | 25″ (63.5 cm) | 28″ (71.1 cm) |
| C | 15″ (38.1 cm) | 17″ (43.2 cm) | I | 26″ (66 cm) | 30″ (76.2 cm) |
| D | 17″ (43.2 cm) | 20″ (50.8 cm) | J | 27″ (68.6 cm) | 31″ (78 cm) |
| E | 19″ (48.3 cm) | 22″ (55.9 cm) | K | 29″ (73.9 cm) | 33″ (83.8 cm) |
| F | 21″ (53.3 cm) | 24″ (61 cm) | L | 30″ (76.2 cm) | 34″ (86.4 cm) |
What are the electrical requirements for a 75 Pound SPEED QUEEN JCB75CSH Gas Drying Tumbler?
The electrical requirements vary by heat source and electrical specification.
Wires Required and Terminal Block Connection
| Heat Source | Electrical Specs | Wires Required and Terminal Block Connection | ||
|---|---|---|---|---|
| Gas & Steam | 230/50/1 | L1 | L2 | Ground to PE Busbar |
Gas and High Pressure Steam Drying Tumblers
| 208V / 240 V, 1 Phase, 50 Hz. | 208 / 240 V, 3 Phase, 50 Hz. | 380 / 415 V, 3 Phase, 50 Hz. | |
|---|---|---|---|
| Minimum Wire Size | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) | 14 AWG (2.081 mm²) |
| Circuit Breaker | 15 AMP | 15 AMP | 15 AMP |
| Poles | 2 | 3 | 3 |
What are the grounding instructions for the SPEED QUEEN JCB75CSH?
The SPEED QUEEN JCB75CSH drying tumbler must be grounded. In the event of a malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. The drying tumbler must be connected to a grounded metal, permanent wiring system; or an equipment grounding conductor must be run with the circuit conductors and connected to the PE Busbar.
WARNING: To reduce the risk of fire and electric shock, check with a qualified serviceman for proper grounding procedures. Improper connection of the equipment grounding conductor can result in a risk of electric shock.
WARNING: To reduce the risk of fire and electric shock, if the electrical supply is coming from a three-phase service, DO NOT connect a “Stinger Leg” to a single-phase machine.
How do I make the electrical connections for the SPEED QUEEN JCB75CSH?
WARNING: All electrical connections should be made by a qualified electrician. To reduce the risk of electrical shock, de-energize the electrical circuit being connected to the tumbler before making any electrical connections. Never attempt to connect a live circuit.
Use the following steps to connect electrical service to the SPEED QUEEN JCB75CSH tumbler:
1. Install a circuit breaker as close to the tumbler as possible. If more than one tumbler is being installed, a separate circuit breaker should be provided for each.
2. a. Connect conduit-encased leads to the circuit breaker.
b. Turn “off” the disconnect switch on the tumbler and open the junction box.
c. Insert conduit-encased leads through one of the knockout holes in the junction box.
d. Connect wire leads to the disconnect switch.
• 1 Phase Units: Connect one lead to the top left connection point. Connect the other lead to the top right connection point.
• 3 Phase Units: Connect one lead to each connection point.
e. Connect a ground wire to the PE Busbar in the junction box.
3. Check the electrical service phase sequence (three-phase only).
4. Close the junction box cover and turn “on” the disconnect switch.
How do I check the electrical service phase sequence for a three-phase SPEED QUEEN JCB75CSH?
Follow these steps to check the phase sequence for three-phase models only:
a. Energize the electrical service and momentarily start the tumbler. Check the direction of the cylinder rotation. If the cylinder rotates clockwise (viewed from the front), the phase sequence is correct.
b. If the cylinder rotates counterclockwise, disconnect power and reverse any two leads at the connections.
How do I position and level the SPEED QUEEN JCB75CSH tumbler?
Positioning: The tumbler may be removed from its shipping skid before moving to the installation location. Unscrew the four shipping capscrews (one at each corner) to remove the tumbler from the skid. The lint panel door will need to be removed to access the two front capscrews. NOTE: Do not throw away these four capscrews – they are the leveling legs.
Screw the four leveling legs back into the level adjusting fittings from the top. Slide the tumbler to its permanent location. Keep the tumbler as close to the floor as possible. All four legs must rest firmly on the floor so the weight is evenly distributed and the tumbler does not rock.
Leveling: The SPEED QUEEN JCB75CSH should be leveled within 1/8 inch (3.2 mm) from front to rear, and 1/8 inch (3.2 mm) from side to side. Check the front-to-rear level by rotating the clothes cylinder until one rib is at the bottom, then place a level on that bottom rib. The side-to-side level should be checked by placing a level on the front and rear of the top panel.
What are the gas requirements for the SPEED QUEEN JCB75CSH Gas Drying Tumbler?
The size of the gas service pipe depends on many variables (length, tees, etc.). Specific pipe size information should be obtained from a gas supplier. It is important that equal gas pressure is maintained at all tumbler gas connections. This can be best achieved by installing a one-inch pipe gas loop.
WARNING: To reduce the risk of fire or explosion, if the SPEED QUEEN JCB75CSH is to be connected to Liquefied Petroleum (L.P.) gas, a vent to the outdoors must be provided in the room where the tumbler is installed.
How should the gas loop piping be installed for multiple SPEED QUEEN JCB75CSH tumblers?
Gas loop piping must be installed as illustrated in diagrams to equalize gas pressure for all tumblers connected to a single gas service. Other gas-using appliances should be connected upstream from the loop. A one-inch (2.54 cm) pipe gas loop is recommended. The minimum pipe size to the tumbler itself is 1/2″ (1.27 cm).
IMPORTANT: Line pressure must be maintained at 6-1/2″ ± 1-1/2″ water column inches (1.62 ± .37 kPa) for Natural Gas, or 11 ± .3 water column inches (2.74 ± .07 kPa) for L.P. Gas, with all gas appliances running (tumblers, water heaters, space heaters, furnace, etc.). An in-line pressure regulator may be required on Natural Gas models if the line pressure exceeds eight water column inches (2.00 kPa) with all gas appliances firing.
How do I determine the required gas pipe size for my SPEED QUEEN JCB75CSH based on BTU/HR and pipe length?
The following table shows the required gas pipe size for 1,000 BTU Natural Gas (.64 specific gravity) at 6.5 ± 1.5 inch water column pressure (1.62 ± .37 kPa), based on a 0.3″ water column (0.75 mBar) pressure drop for the given equivalent pipe length.
| GAS APPLIANCES TOTAL BTU/HR. (Kcal/hr) | EQUIVALENT LENGTH | |||||
|---|---|---|---|---|---|---|
| 25 FT. (7.63 m) | 50 FT. (15.25 m) | 75 FT. (22.88 m) | 100 FT. (30.50 m) | 125 FT. (38.13 m) | 150 FT. (45.75 m) | |
| 100,000 (25,200) | ¾” (1.905cm) | ¾” (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) |
| 120,000 (30,240) | ¾” (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) |
| 140,000 (35,280) | ¾” (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1¼” (3.18cm) |
| 160,000 (40,320) | ¾” (1.905cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1¼” (3.18cm) |
| 180,000 (45,360) | 1″ (2.54cm) | 1″ (2.54cm) | 1″ (2.54cm) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1¼” (3.18cm) |
| 200,000 (50,400) | 1″ (2.54cm) | 1″ (2.54cm) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1½” (3.81cm) |
| 300,000 (75,600) | 1″ (2.54cm) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1½” (3.81cm) | 1½” (3.81cm) | 1½” (3.81cm) |
| 400,000 (100,800) | 1¼” (3.18cm) | 1¼” (3.18cm) | 1½” (3.81cm) | 1½” (3.81cm) | 1½” (3.81cm) | 2″ (5.08cm) |
| 500,000 (126,000) | 1¼” (3.18cm) | 1½” (3.81cm) | 1½” (3.81cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) |
| 600,000 (151,200) | 1½” (3.81cm) | 1½” (3.81cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) |
| 700,000 (176,400) | 1½” (3.81cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) |
| 800,000 (201,600) | 1½” (3.81cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) |
| 900,000 (226,800) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) |
| 1,000,000 (252,000) | 2″ (5.08cm) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) |
| 1,100,000 (277,200) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) |
| 1,200,000 (302,400) | 2″ (5.08cm) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) |
| 1,300,000 (327,600) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) |
| 1,400,000 (352,800) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 1,500,000 (378,600) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 1,600,000 (403,200) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 1,700,000 (428,400) | 2″ (5.08cm) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 1,800,000 (453,600) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 1,900,000 (478,800) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) |
| 2,000,000 (504,000) | 2½” (6.35cm) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3½” (8.89cm) |
| 2,200,000 (554,400) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3½” (8.89cm) | 3½” (8.89cm) |
| 2,400,000 (604,800) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3½” (8.89cm) | 3½” (8.89cm) |
| 2,600,000 (655,200) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3½” (8.89cm) | 3½” (8.89cm) | 3½” (8.89cm) |
| 2,800,000 (705,600) | 2½” (6.35cm) | 3″ (7.62cm) | 3″ (7.62cm) | 3½” (8.89cm) | 3½” (8.89cm) | 3½” (8.89cm) |
| 3,000,000 (756,000) | 2½” (6.35cm) | 3″ (7.62cm) | 3½” (8.89cm) | 3½” (8.89cm) | 3½” (8.89cm) | 4″ (10.16cm) |
How do I connect the gas piping to the SPEED QUEEN JCB75CSH tumbler?
Before connecting, make certain the gas service is the same as that specified on the nameplate. NATURAL GAS must be supplied at 6.5 ± 1.5 inch water column pressure (1.62 ± .37 kPa). L.P. GAS must be supplied at 11 ± .3 inch water column pressure (2.74 ± .07 kPa). If the service is not correct, DO NOT CONNECT THE GAS LINE; the burner orifice and gas valve must be converted first by authorized personnel.
Purge air and sediment from the gas service line before connecting it loosely to the tumbler. Purge the remaining air until the odor of gas is detected, then tighten the connection. Use pipe compound resistant to the actions of L.P. gas on all pipe threads.
WARNING: The tumbler and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.45 kPa). The tumbler must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig (3.45 kPa).
How do I check for gas leaks on my SPEED QUEEN JCB75CSH?
WARNING: Check all pipe connections, internal and external, for gas leaks using a soapy solution. To reduce the risk of explosion or fire, DO NOT USE AN OPEN FLAME TO CHECK FOR GAS LEAKS! Gas connections should be checked annually for leakage.
What are the clearance requirements when installing a SPEED QUEEN JCB75CSH in an enclosure?
WARNING: To reduce the risk of serious injury, install lockable doors to prevent public access to the rear of the tumblers.
When installing the SPEED QUEEN JCB75CSH in an enclosure, ensure sufficient clearance for servicing and operating. The clearance of the tumbler cabinet from combustible construction must be a minimum of 12 inches (30.5 cm) at the top.
• Top: 12″ (30.5 cm) minimum clearance.
• Front: 0″ clearance is permitted for the first 4″ (10.16 cm) of the enclosure, with a maximum depth of 4″ (10.16 cm).
• Side: 0″ clearance.
• Rear: 24″ (61 cm) minimum / 36″ (91.4 cm) recommended for maintenance purposes. Make provisions for make-up air.
IMPORTANT: Do not block airflow at the top rear of the tumbler with laundry, etc., as this would prevent an adequate air supply to the tumbler’s heat chamber.
How do I light and shut down the gas ignition system on the SPEED QUEEN JCB75CSH?
Lighting the System:
1. Turn the machine disconnect switch, located on the rear of the tumbler, to the “on” position.
2. Turn the gas shut-off valve, located on the rear of the tumbler, to the “on” position (gas valve handle should be parallel with the gas line).
3. Start the tumbler, following the operating instructions that accompanied it.
Shutting Down the System:
If the tumbler will not start, remove it from service by turning the machine disconnect switch to the “off” position and turning the gas shut-off valve to the “off” position (gas valve handle should be at a right angle to the gas line).
What happens during the ignition sequence of the SPEED QUEEN JCB75CSH, and how do I reset it if it locks out?
The ignition control circuitry will first verify the airflow switch is open. Once the cylinder motor starts, air flowing through the tumbler will cause the airflow switch to close. The tumbler will purge air for 18 seconds. Ignition will then start with a three-second release of gas from the gas valve and sparking of the ignitor.
If ignition does not occur during this first three seconds, the ignition control will “lockout,” causing the gas valve to close and a red button on the ignition control to illuminate.
To reset the ignition system, open the access door and press the red button on the ignition control. Close and lock the access door, verify that the gas shut-off valve is in the “on” position, and attempt to start the tumbler again.
How do I install an accessory timing cam on a coin-operated SPEED QUEEN JCB75CSH?
Removal of Existing Timing Cam:
1. Rotate the cam by hand until the “V” notch lines up beneath the ratchet tooth.
2. Insert a narrow screwdriver under the nylon cam, close to the clock shaft. Lift gently off the shaft, ensuring upward pressure and that the “V” notch clears the ratchet tooth.
Installation of New Timing Cam:
1. Insert the drive into the timing cam with the wide prong in the wide hole of the cam.
2. Position the timing cam and drive fork over the timer shaft, aligning the timer flat with the drive fork and the “V” notch with one of the ratchet teeth.
3. Press the timing cam down firmly to seat it onto the motor shaft.
4. Remove all accumulated time by turning the cam counterclockwise until the switch shuts off. Apply moderate clockwise pressure to the fully seated timing cam and drive against the timing motor shaft. The meter must be advanced electrically for one cycle before an accurate measure of time can be made.
To figure time increments, use this formula: Timer Motor Speed (60) divided by the number of pins on the cam = Cycle Length (minutes). Cams are available with 1 to 12 pins.
Example: 60 ÷ 5 (Pin cam) = 12 minute cycle.
What are the preliminary operating checks I should perform on my SPEED QUEEN JCB75CSH after installation?
1. Remove or open all panels and inspect accessible bolts, nuts, screws, terminals, and fittings for security.
2. Check belt tension; adjust if necessary.
3. Energize the electrical circuit to the tumbler circuit breaker and turn on the tumbler disconnect switch.
4. Turn on the gas supply at the manual gas shut-off valve (gas models only). The handle should be parallel with the gas supply line when in the “ON” position.
5. Press and hold the Push-to-Start Button for approximately three (3) seconds. Release the button and open the cylinder door. The cylinder should stop rotating within seven (7) seconds after the door is opened 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm). If the cylinder does not stop, adjust the cylinder door interlock.
6. Load the tumbler with clothes or clean rags.
7. Start the tumbler and check the burner flame; adjust the gas inlet shutter if necessary.
8. Check the air flow switch operation by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 1-1/2″ (3.81 cm). Adjust if necessary.
9. Turn off the tumbler.
10. Check the air flow switch operation again by opening the lint panel. The heating system should shut off when the lint panel is opened approximately 6″ (15.24 cm) with a full load.
What are the final operating checks for a Manual Dual Timer SPEED QUEEN JCB75CSH?
1. Set the temperature selector to HIGH and set the drying and cool down selectors to their maximum settings.
2. Press and hold the Push-to-Start Button for approximately three (3) seconds. The motor will start, the heat system will turn on, the drying indicator will light, and the drying selector will rotate counterclockwise.
3. When the drying selector reaches zero (0), the heat system will shut off, the drying indicator will turn off, the cooling indicator will light, and the cooling selector will rotate counterclockwise.
4. When the cooling selector reaches zero (0), the motor will stop and the cooling indicator will turn off, indicating the drying cycle is finished.
How do I adjust the main gas burner air shutter on the SPEED QUEEN JCB75CSH for a proper flame?
NOTICE: Both air inlet shutters on the burner must be adjusted for proper combustion and maximum efficiency. Before adjusting, ensure all lint is removed from the lint compartment and screen.
1. Unlock and open the access door.
2. Start the tumbler and check the flame pattern. A correct mixture is indicated if the flame is primarily blue with small yellow tips and bends to the right of the heater section. Too little air is indicated if the flame is yellow, lazy, and smokey.
3. To adjust, loosen the air inlet shutter adjusting screw.
4. Open or close the air shutter as necessary to obtain the proper flame intensity.
5. After adjustment, tighten the air shutter adjusting screw securely.
6. If the shutter is correctly adjusted but the flame pattern is straight up, it indicates insufficient primary air. A flame pattern that flares to the right and left indicates no air is flowing through the tumbler.
How do I adjust the air flow switch on the SPEED QUEEN JCB75CSH?
WARNING: To reduce the risk of fire, air flow switch operation may be affected by a clogged lint screen, lack of make-up air, or obstructions in ducts. Check and correct these conditions before adjusting the switch. Always adjust air flow at installation.
NOTICE: The control panel must be in place and the access door closed before attempting to adjust the air flow switch.
The counterweight should be adjusted so airflow will force the disc away from the cabinet when the lint panel is opened 6 inches (15.24 cm) with a full load.
1. Load the tumbler.
2. Start the tumbler. Open the lint panel 6 inches (15.24 cm). The airflow disc should move away from the cabinet, opening the switch contacts and shutting off the heat system. This indicates proper operation.
3. If the switch does not open as described, it needs to be MORE sensitive. Depress the spring clip and move the counterweight toward the disc. Retest and continue moving the counterweight toward the disc until it operates correctly.
4. If the switch opens BEFORE the lint panel is opened 6 inches, it needs to be LESS sensitive. Depress the spring clip and move the counterweight away from the disc. Retest and continue moving the counterweight away from the disc until it operates correctly.
How do I adjust the loading door switch on the SPEED QUEEN JCB75CSH?
To adjust the loading door switch, which turns off the tumbler when the door is opened, follow these steps:
1. Start the tumbler following its operating instructions.
2. Slowly open the loading door. The cylinder and heating system should stop when the door is open 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
3. Slowly close the loading door. The switch should close with an audible “click” when the door is closed 3″ (7.5 cm) plus or minus 1/4″ (0.635 cm).
4. If the switch does not close at the correct distance:
a. Close the loading door completely.
b. Loosen the lower screw on the switch coupler and rotate the switch coupler COUNTERCLOCKWISE until it stops.
c. Tighten the lower screw on the switch coupler.
d. Return to step 1 to verify the new adjustment.
How do I adjust the cylinder door strike on the SPEED QUEEN JCB75CSH?
The door strike must be adjusted to have sufficient tension to hold the loading door closed against the force of a tumbling load. Proper adjustment is when 8 to 15 pounds (35.6 N – 66.7 N) of pull is required to open the door.
To adjust, open the door, loosen the jamnut, and turn the door strike screw in or out as required. Retighten the jamnut when finished.
How do I adjust the drive V-belt on the SPEED QUEEN JCB75CSH?
WARNING: To reduce the risk of serious injury or death, disconnect power to the tumbler before performing this operation. The guard MUST be reinstalled on the rear of the tumbler after belt adjustment is made.
Proper tension is when the belt can be depressed approximately 1/2 inch (1.27 cm) with light thumb pressure at a point midway between the sheave and motor pulley.
1. Remove the guard from the rear of the tumbler.
2. To adjust belt tension, loosen the adjusting bolt holding the idler housing assembly to the housing support.
3. To tighten the V-belt:
a. Loosen the lower nut on the adjusting bolt.
b. Turn the bolt up until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
4. To loosen the V-belt:
a. Loosen the top nut on the adjusting bolt.
b. Turn the bolt down until the belt has proper tension.
c. Tighten the upper and lower nut or adjusting bolt.
5. Replace the guard on the rear of the tumbler.
6. The upper belt (Poly V-belt) requires no adjustment as it is self-adjusting.
What daily preventive maintenance is required for the SPEED QUEEN JCB75CSH?
1. Make certain the drying cycle has ended.
2. Open the loading door.
3. Unlock and remove the lint panel.
4. Remove accumulated lint in the lint compartment. Lint left in the compartment will be drawn back onto the lint screen and restrict air circulation.
5. Clean lint from the lint screen. If the lint screen is torn, replace it immediately. A torn lint screen allows lint to flow into the ductwork system, restricting air circulation.
6. Ensure the lint screen covers the entire opening in the lint screen hood. Gaps will allow lint to flow into the ductwork.
7. Wipe any accumulated lint off the thermostat sensing probe. Lint buildup on the sensing probe will cause overheating of the tumbler.
8. Replace and securely lock the lint panel.
What monthly preventive maintenance is required for the SPEED QUEEN JCB75CSH?
1. Perform daily cleaning of accumulated lint.
2. Deactivate the electrical circuit by turning off the electrical disconnect switch on the rear of the tumbler.
4. Remove the exhaust duct from the rear of the tumbler and clean out all accumulated lint.
5. Reinstall the exhaust duct.
6. Remove the bottom cover from the vertical exhaust duct and clean out all accumulated lint.
7. Reinstall the vertical exhaust duct cover.
8. Inspect the entire duct work assembly and clean out all accumulated lint.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
What quarterly preventive maintenance is required for the SPEED QUEEN JCB75CSH?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Clean accumulated lint and other debris from the front and back motor air vents.
5. Shut off the gas supply at the manual gas shut-off valve in the gas supply line (gas models only). The handle of the gas shut-off valve should be at a 90° angle to the gas supply line when in the “OFF” position.
6. Remove the screws holding the rear drive guard to the back of the tumbler.
7. Inspect belts for wear and proper tension (refer to the Adjustments section).
8. Reinstall the rear drive guard to the back of the tumbler.
9. Energize the electrical circuit to the tumbler by turning on the electrical disconnect switch on the rear of the tumbler.
10. Turn on the gas supply at the manual gas shut-off valve in the gas supply line (gas models only). The handle of the gas shut-off valve should be parallel with the gas supply line when in the “ON” position.
What biannual preventive maintenance is required for the SPEED QUEEN JCB75CSH?
1. Deactivate the electrical circuit by turning off the disconnect switch on the rear of the tumbler.
2. Perform daily cleaning of accumulated lint.
3. Perform monthly inspection and cleaning of accumulated lint.
4. Perform quarterly inspection and cleaning of accumulated lint.
5. Remove or open all panels and check accessible bolts, nuts, screws, terminals, and fittings for tightness.
6. Shut off the gas supply at the manual gas shut-off valve in the gas supply line (gas models only). The handle of the gas shut-off valve should be at a 90° angle to the gas supply line when in “OFF” position.
7. Unlock and open the service panel and inspect gas connections for evidence of leakage or loose connections. NOTE: Spraying a mild solution of soap and water on joints will cause bubbles to appear on any leaking connections.
8. Close and securely lock the service panel.
9. Open the electrical junction box cover and inspect all electrical and grounding connections for security. Tighten any loose electrical connections.
10. Close the electrical junction box cover and energize the electrical circuit to the tumbler by turning on the electrical disconnect switch.
11. Turn on the gas supply at the manual gas shut-off valve in the gas supply line (gas models only). The handle of the gas shut-off valve should be parallel with the gas supply line when in “ON” position.
How do I decommission the SPEED QUEEN JCB75CSH tumbler?
1. Turn off the electrical supply external to the machine.
2. Turn off the electrical disconnect on the machine.
3. Turn off the gas supply external to the machine.
4. Turn off the manual gas shut-off valve on the machine.
5. Turn off the steam supply external to the machine (if applicable).
6. Remove all electric, gas, and steam connections.
CLICK HERE TO DOWNLOAD SPEED QUEEN JCB75CSH (01) PDF DOCUMENT
