JOHN DEERE 1910 (01) Image

Free English JOHN DEERE 1910 (01) PDF document. Download the PDF, use the online viewer, or browse the FAQs for easy troubleshooting.


CLICK HERE TO DOWNLOAD JOHN DEERE 1910 (01) PDF DOCUMENT

If this is not the document you want for this product, click here to see if we have any other documents for this product.

What is the primary safety precaution to take before making connections to the JOHN DEERE 1910?

Make all connections with the tractor engine off and transmission in park.


What are the initial connection and setup checks for the JOHN DEERE 1910 air cart?

Before operation, perform the following checks:

• Verify proper drawbar and implement hitch compatibility.

• Verify proper safety chain size and connection.

• Verify all hitch connections.

• Connect the case drain hydraulic hose before other hydraulics.

• Connect all other hydraulic hoses and electrical harnesses. Refer to the Operator’s Manual for specific recommendations on hydraulic connections.

• Verify monitor settings for the cart and tool.


What checks should be performed on the metering system of the JOHN DEERE 1910 before use?

Ensure the metering system is correctly configured and clean:

• Verify meter cartridges on the cart have the correct meter segments, meter rollers, and tuning rings installed.

• Ensure manifolds, rollers, meter cartridges, and the inside of towers are free from product buildup, dirt, and debris.


What is the correct procedure for filling the tanks on the JOHN DEERE 1910?

• When filling tanks, position the auger or conveyer between the tank openings.

• Place the spout handle on the hook to provide proper and even tank fill.

• Fill tanks with enough product to cover the meters.


What steps should be taken on the JOHN DEERE 1910 after filling the tanks but before seeding?

• Run the blowers to warm hydraulic oil to operating temperature and to remove moisture from the product delivery system.

• Adjust tire pressures.

• Adjust cart blower speed as recommended on the monitor.

• Adjust the tank pressure valves (C) to set the tank differential pressure according to the gauge set range. Observe the pressure differential gauges (D) to verify there are no air leaks through the tank lid seals.

• Verify that screens on the cart blowers are clear of debris.


How do I perform a meter calibration on the JOHN DEERE 1910?

Perform meter calibration and verification procedures using the collection bag (A) and scale (B).

NOTE: Do not run the blowers while the collection bag (A) is attached.


How can I verify product flow to all openers on the JOHN DEERE 1910 after filling?

After each fill, raise the seeding tool to verify product flow to all openers by using the calibration switch (E) to activate the meters for a few seconds.


What are the final steps after filling and calibrating the JOHN DEERE 1910?

• Lock the auger or conveyor in its storage position after filling.

• For double shoot carts, adjust the plenum (D).

How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.

NO IMAGE CONTENT AT THIS TIME. PLEASE CHECK BACK LATER

CLICK HERE TO DOWNLOAD JOHN DEERE 1910 (01) PDF DOCUMENT


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.