Free English FURUNO FI-5002 (01) PDF document. Download the PDF, use the online viewer, or browse the FAQs for easy troubleshooting.
CLICK HERE TO DOWNLOAD FURUNO FI-5002 (01) PDF DOCUMENT
If this is not the document you want for this product, click here to see if we have any other documents for this product.
How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.
What is the purpose of the FURUNO FI-5002 Junction Box?
The FURUNO FI-5002 Junction Box has six CAN bus (NMEA2000) drop ports for use with the CAN bus (NMEA2000) network. It allows signals from up to six CAN bus (NMEA2000) devices to be dropped onto the backbone cable.
What components are included in the package contents for the FURUNO FI-5002 Junction Box?
The package contents for the FURUNO FI-5002 Junction Box are as follows:
| Name | Type | Code No. | Qty |
|---|---|---|---|
| Junction Box | FI-5002 | 1 | |
| Self-tapping Screw | 4×20 SUS304 | 000-158-850-10 | 2 |
| Cable Tie | T18R | 000-167-891-10 | 9 |
| Power Cable | FI-5002-POWERCABLE | 000-166-954-10 | 1 |
What are the installation procedures for the FURUNO FI-5002 Junction Box?
The procedure for installing the FURUNO FI-5002 Junction Box is as follows:
Step 1. Remove the cover of the Junction Box.
Step 2. Fix the Junction Box to the mounting location with two self-tapping screws (♔4×20, supplied).
Step 3. Connect the cables to the applicable connector, referring to the interconnection diagram provided in the operator’s manual or installation manual of a device connected to the Junction Box.
Step 4. Fasten the cables to the cable clamp with the supplied cable ties.
Step 5. Close the cover of the Junction Box.
What size self-tapping screws are supplied with the FURUNO FI-5002 Junction Box for mounting?
Two self-tapping screws of size 4×20 SUS304 are supplied for fixing the FURUNO FI-5002 Junction Box to the mounting location.
How many Cable Ties (T18R) are supplied with the FURUNO FI-5002 Junction Box package?
Nine Cable Ties of type T18R are supplied with the FURUNO FI-5002 Junction Box package.
What is the Code No. for the Power Cable supplied with the FURUNO FI-5002 Junction Box?
The Code No. for the Power Cable (FI-5002-POWERCABLE) supplied with the FURUNO FI-5002 Junction Box is 000-166-954-10.
After connecting the cables to the FURUNO FI-5002 Junction Box connectors, how should the cables be secured?
After connecting the cables to the applicable connectors on the FURUNO FI-5002 Junction Box, fasten the cables to the cable clamp with the supplied cable ties.
CLICK HERE TO DOWNLOAD FURUNO FI-5002 (01) PDF DOCUMENT