Free English RESPEKTA MW 800 G (01) PDF document. Download the PDF, use the online viewer, or browse the FAQs for easy troubleshooting.


CLICK HERE TO DOWNLOAD RESPEKTA MW 800 G (01) PDF DOCUMENT

If this is not the document you want for this product, click here to see if we have any other documents for this product.


How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.


What is the purpose of the RESPEKTA MW 800 G bottom cabinet drilling template?

The drilling template is used to accurately locate the position of the drill holes labeled “a” for the mounting plate (locking bracket) in the lower cabinet. The locking bracket itself is designed to lock the RESPEKTA MW 800 G oven on its back once installed.


How do I use the drilling template to prepare the cabinet for the RESPEKTA MW 800 G?

Step 1. Check that the base cabinet is the correct size and has a smooth, flat base.

Step 2. Stick the drilling template onto the bottom of the base cabinet floor.

Step 3. Verify that the CENTER LINE of the drilling template is positioned in the middle of the base cabinet floor.

Step 4. Ensure that the front edge of the template is perfectly aligned with the front edge of the base cabinet floor.

Step 5. Use an awl to pierce the holes marked “a” on the template through to the bottom of the base cabinet floor.

Step 6. Once the holes have been pierced, remove the drilling template from the cabinet.


What are the technical specifications for the cabinet and mounting hardware for the RESPEKTA MW 800 G?

The underfloor cabinet board used for the RESPEKTA MW 800 G installation should have a minimum diameter of at least 15 mm. Additionally, the mounting plate must be secured using two 12 mm screws as indicated in the installation diagrams.


What are the key alignment points for the RESPEKTA MW 800 G drilling template?

When placing the template, you must ensure two primary alignment points are met:

1. The Center Line: This must be in the middle of the floor of the base cabinet.

2. The Front Edge: The front edge of the template must match and be aligned with the front edge of the base cabinet floor.


CLICK HERE TO DOWNLOAD RESPEKTA MW 800 G (01) PDF DOCUMENT


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.