HUAWEI ATN 910C-G (01) Image

Free English HUAWEI ATN 910C-G (01) PDF document. Download the PDF, use the online viewer, or browse the FAQs for easy troubleshooting.


CLICK HERE TO DOWNLOAD HUAWEI ATN 910C-G (01) PDF DOCUMENT

If this is not the document you want for this product, click here to see if we have any other documents for this product.

What is included in the packing list for the HUAWEI ATN 910C-G?

The packing list for the HUAWEI ATN 910C-G includes the following items:

• Insulation tape

• Corrugated pipe

• Fiber binding tape

• Floating nut (M6)

• Serial cable

• Label cable tie

• Power cable label

• Panel screw (M6x12)

• Cable management frame

• ESD wrist strap

• Signal cable label

• Cable tie (300 x 3.6 mm)

Note: The type and quantity of items in an installation accessory package vary according to the device model. Check the delivered items against the actual packing list.


What are the technical specifications for the HUAWEI ATN 910C-G?

Item DC Chassis AC Chassis
Chassis height [U] 1 U 1 U
Dimensions without packaging (H x W x D) [mm(in.)] 44.45 mm x 442 mm x 220 mm (1.75 in. x 17.4 in. x 8.66 in.) 44.45 mm x 442 mm x 220 mm (1.75 in. x 17.4 in. x 8.66 in.)
Weight without packaging (base configuration) [kg] 3.9 kg 4.5 kg
Maximum input current [A] 4 A 1.5 A
Input voltage range [V] -48 V/-60 V 110 V/220 V
Maximum input voltage range [V] -40 V to -72 V 100 V to 240 V

What are the key safety guidelines for the HUAWEI ATN 910C-G?

When working with the HUAWEI ATN 910C-G, observe all safety regulations and precautions:

• To ensure personal and equipment safety, observe all the safety precautions on the equipment and in this document. The DANGER, WARNING, CAUTION, and NOTICE items do not cover all the safety precautions and are only supplementary.

• Follow all the safety precautions and instructions provided by Huawei. The safety precautions outlined in this document are only requirements of Huawei and do not cover general safety regulations. Huawei is not liable for any consequence that results from violation of regulations pertaining to safe operations or safety codes pertaining to design, production, and equipment use.


What are the operator qualifications for installing the HUAWEI ATN 910C-G?

Only trained and qualified personnel are allowed to install, operate, or maintain the HUAWEI ATN 910C-G. Familiarize yourself with all safety precautions before performing any operation on the equipment.


What are the DANGER warnings for the HUAWEI ATN 910C-G?

• Do not install or remove the equipment or power cables while power is on.

• To ensure equipment and personal safety, ground the equipment before powering it on.


What are the WARNINGS for handling the HUAWEI ATN 910C-G?

• Use multiple persons to move or lift a chassis and take measures to protect personal safety.

• Laser beams will cause eye damage. Do not look into bores of optical modules or optical fibers without eye protection.


What NOTICES should I be aware of when handling the HUAWEI ATN 910C-G?

• During equipment transport and installation, prevent the equipment from colliding with objects like doors, walls, or shelves.

• Move an unpacked chassis upright. Do not drag it with it lying down.

• Do not touch unpainted surfaces of the equipment with wet or contaminated gloves.

• Do not open the ESD bags of cards and modules until they are delivered to the equipment room. When taking a card out of the ESD bag, do not use the connector to support the card’s weight because this operation will distort the connector and make the pins on the backplane connector bend.


How can I protect my HUAWEI ATN 910C-G from electrostatic discharge (ESD)?

Before installing, operating, or maintaining the equipment, wear an ESD wrist strap and insert the other end into the ESD jack on the chassis or cabinet. Remove conductive objects like jewelry and watches to prevent damages to the equipment and cards caused by electrostatic discharge.


What are the site requirements for installing a HUAWEI ATN 910C-G?

The HUAWEI ATN 910C-G must be used indoors. To ensure normal operation and long service life, the following requirements must be met:

• The device needs to be installed in a clean, dry, well-ventilated, and temperature-controllable standard equipment room. The equipment room must be free from leaking or dripping water, heavy dew, and condensing.

• Dustproof measures must be taken in the installation site. Dust can cause electrostatic discharges, affect connections, shorten service life, and result in device failures.

• The installation site must be free from acidic, alkaline, and other types of corrosive gases.

• The device may cause radio interference. If this occurs, relevant measures may be needed to reduce the interference.

• Generally, wireless antennas should not be installed in the equipment room. If they must be installed indoors, ensure the electromagnetic environment meets requirements or take necessary shielding measures.


What are the environmental requirements for operating the HUAWEI ATN 910C-G?

Item Requirements
Long-term operating temperature [°C] -40°C to +65°C
Storage temperature [°C] -40°C to +70°C
Relative operating humidity [RH] Long-term: 5% to 85% RH, non-condensing
Relative storage humidity [RH] 5% to 100% RH, non-condensing
Long-term operating altitude [m] ≤ 4000 m (For altitudes between 1800 m and 4000 m, the operating temperature of the device decreases by 1°C for every 220 m increase in altitude.)
Storage altitude [m] < 5000 m

What are the cabinet requirements for installing the HUAWEI ATN 910C-G?

The device must be installed in an IEC 19-inch or an ETSI 21-inch cabinet. If you purchase your own cabinet, it must meet the following requirements:

1. 19-inch or 21-inch cabinet with a depth of greater than or equal to 300 mm.

2. The cabling space in front of the cabinet complies with the cabling space requirements of boards. It is recommended that the distance between the cabinet door and any device board be greater than or equal to 120 mm. A cabinet with broader cabling space, such as a convex door, is recommended.

3. The device draws air from the left side and exhausts from the right side. If installed in a 19-inch cabinet, there must be a clearance of at least 75 mm at the left and right sides of the cabinet for good ventilation.

4. The porosity of each cabinet door must be greater than 50% to meet heat dissipation requirements.

5. The cabinet must have installation accessories, such as guide rails, floating nuts, and screws.

6. The cabinet must have a ground terminal to connect to the device.

7. The cabinet must have a cable outlet on the top or at the bottom for overhead or underfloor cabling.


What are the recommendations for cabinet installation of the HUAWEI ATN 910C-G?

• The cabinet may be installed on an ESD floor or a concrete floor.

• For cabinets with left-to-right air channels, installing them side by side may cause cascaded heating. It is advised to install such cabinets vertically at different levels rather than side by side. If side-by-side installation is unavoidable, the distance between cabinets should be at least 500 mm (19.67 in.).

• If the device requires optical modules or attenuators with a puller, ensure sufficient space for routing optical fibers. For a convex door or open rack, the distance between the cabinet door and the front panel of the board should be 120 mm (4.72 in.) or more.


What should I be cautious about when installing multiple HUAWEI ATN 910C-G devices in a cabinet?

• Ensure that the total heat consumption of all devices in the cabinet does not exceed the heat dissipation capability of the cabinet.

• To prevent air return from affecting heat dissipation, leave at least 2 U space between devices in the cabinet.

• Do not block the heat dissipation holes on panels.

• A device that needs to share the same cabinet with other devices cannot be installed near the air exhaust vents of those devices.

• Consider the impact of a device’s air exhaust vent on adjacent devices to prevent high temperature.

• When fastening floating nuts, ensure that there is at least 75 mm space on the left and right sides of the device for ventilation after device installation.


How do I install the HUAWEI ATN 910C-G in an IEC 19-inch cabinet?

Follow these steps to install the HUAWEI ATN 910C-G in an IEC 19-inch cabinet:

Step 1. Install floating nuts onto the cabinet. Align the floating nuts with the installation holes on the cabinet columns and install them.

Step 2. Connect the PGND cable to the front or side face of the device. Connecting the cable to the side face is preferred. Use a screwdriver to tighten the M4 screw.

Step 3. Install the device into the cabinet. Slide the device into the cabinet, align the installation holes on the mounting ears with the floating nuts, and use a screwdriver to tighten the M6 panel screws.


How do I install the HUAWEI ATN 910C-G in an ETSI 21-inch cabinet with front columns?

Follow these steps to install the HUAWEI ATN 910C-G in an ETSI 21-inch cabinet:

Step 1. Install floating nuts onto the cabinet. Align the floating nuts with the installation holes on the cabinet columns and install them.

Step 2. Install the conversion mounting ears on both sides of the chassis. Use a screwdriver to tighten the M6 screws.

Step 3. Connect the PGND cable to the front or side face of the device. Connecting the cable to the side face is preferred. Use a screwdriver to tighten the M4 screw.

Step 4. Install the device into the cabinet. Slide the device into the cabinet, align the installation holes on the conversion mounting ears with the floating nuts, and use a screwdriver to tighten the M6 panel screws.


What are the common cables used with the HUAWEI ATN 910C-G?

The common cables used with the device are:

• PGND cable

• DC power cable

• Optical fiber

• AC power cable

• Shielded Ethernet cable

• 120-ohm 16 x E1 cable

• 75-ohm 16 x E1 cable


What is the recommended cable routing plan for the HUAWEI ATN 910C-G?

• To ensure that power cables are connected in order, you are advised to plan power cable routing.

• It is recommended that power cables and ground cables be routed on the left side of the cabinet. It is recommended that cables, such as optical fibers and Ethernet cables, be on the right side of the cabinet.

• If cables are routed on the rear of a device, ensure that the cables do not block the air vents of the device to achieve proper heat dissipation.

• Before routing cables, make temporary labels and attach them to the cables. After the cables are routed, make formal labels and attach them to the cables as required.

• Do not bundle or route outdoor cables (such as outdoor antenna feeders and outdoor power cables) and indoor cables together in the cabinet or cable tray.


What is the recommended fuse capacity for the DC-powered HUAWEI ATN 910C-G?

For a DC-powered HUAWEI ATN 910C-G, the recommended fuse capacity of the external power supply is ≥6 A. For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 6 A. The maximum cable size is 4 mm².


What is the recommended fuse capacity for the AC-powered HUAWEI ATN 910C-G?

For an AC-powered HUAWEI ATN 910C-G, the recommended fuse capacity of the external power supply is ≥1.5 A. For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 1.5 A.


What are the guidelines for installing optical fibers on the HUAWEI ATN 910C-G?

WARNING: When performing operations such as installing or maintaining optical fibers, do not move your eyes close to or look into the optical fiber outlet without eye protection.

CAUTION: Before routing internal optical fibers, install fixed optical attenuators at the corresponding optical ports on devices according to the fixed optical attenuator installation table.

General Guidelines:

• The bending radius of a single-mode G.657A2 optical fiber is no less than 10 mm, and that of a multi-mode A1b optical fiber is no less than 30 mm.

• After laying out optical fibers, use binding straps to bind the fibers neatly without squeezing them.

• After the optical fibers are connected, the optical ports and optical connectors that are not used must be covered by dustproof plugs and dustproof caps, respectively.

• Do not use an open-end corrugated pipe to hold excessive optical fibers. It is recommended that an open-end corrugated pipe with a diameter of 32 mm accommodate a maximum of 60 fibers with a diameter of 2 mm.

• It is recommended that the length of a corrugated pipe inside a cabinet be about 100 mm.


What checks should be performed before powering on the HUAWEI ATN 910C-G?

Before powering on the device, perform the following checks:

• Check whether fixed optical attenuators have been added in accordance with corresponding configuration rules.

• Check whether the fuse capacity of the external power supply meets requirements.

• Check whether the external power supply voltage is normal.

CAUTION: If the power supply voltage does not meet requirements, do not power on the device.


What is the power-on check procedure for the HUAWEI ATN 910C-G?

WARNING:

• Before performing a power-on check, turn off all the switches on the device and external power supply system.

• If indicators are in specified abnormal states after you power on the device, handle the abnormalities onsite.


What do the chassis indicators mean when the HUAWEI ATN 910C-G is operating properly?

The following table describes the states of indicators when the device is operating properly.

Indicator Name State
STAT Working status indicator Steady green
ALM Alarm indicator off
PWR/STAT Power supply status indicator Steady green

How to use the PDF below:
* Touchscreen: Swipe up/down with-in the PDF to scroll and pinch or spread with two fingers to zoom.
* Mouse: While your mouse is hovering over the PDF, use the mouse wheel to scroll and click on the – / + buttons at the bottom of the PDF to zoom.

NO IMAGE CONTENT AT THIS TIME. PLEASE CHECK BACK LATER

CLICK HERE TO DOWNLOAD HUAWEI ATN 910C-G (01) PDF DOCUMENT


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.