HUAWEI ATN 910C-A (01) Image

FREE ENGLISH HUAWEI ATN 910C-A (01) PDF USER GUIDE
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF USER MANUAL
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF OWNER GUIDE
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF OWNER MANUAL
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF REFERENCE GUIDE
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF INSTRUCTION GUIDE
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF REFERENCE MANUAL
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF INSTRUCTION MANUAL
FREE ENGLISH HUAWEI ATN 910C-A (01) PDF OPERATING INSTRUCTIONS


CLICK HERE TO DOWNLOAD HUAWEI ATN 910C-A (01) PDF MANUAL

If this is not the document you want for this product, click here to see if we have any other documents for this product.

NO IMAGE CONTENT AT THIS TIME. PLEASE CHECK BACK LATER

Which devices does this quick installation guide apply to?

This document applies to the installation of the ATN 910C-K/M/G, ATN 910D-A, NetEngine 8000 M1A/M1C, and OptiX PTN 916-F.


What is included in the packing list?

The packing list includes:

• Insulation tape

• Corrugated pipe

• Fiber binding tape

• Floating nut (M6)

• Serial cable

• Label cable tie

• Power cable label

• Panel screw (M6x12)

• Cable management frame

• ESD wrist strap

• Signal cable label

• Cable tie (300 x 3.6 mm)

NOTE:

• DC and AC Chassis are installed in the same way. For installation details, see the corresponding installation guide.

• Figures in the document are for reference only and may be different from actual devices.

• The type and quantity of items in an installation accessory package vary according to the device model. Check the delivered items against the actual packing list.


Can DC and AC power modules be installed in any power module slot for certain models?

Yes, DC and AC power modules can be installed in any of the power module slots on the ATN 910C-K/M and ATN 910D-A.


What are the technical specifications for the DC and AC chassis models?

Item DC Chassis AC Chassis
Chassis height [U] 1 U 1 U
Dimensions without packaging (H x W x D) [mm(in.)] 44.45 mm x 442 mm x 220 mm(1.75 in. x 17.4 in. x 8.66 in.) 44.45 mm x 442 mm x 220 mm(1.75 in. x 17.4 in. x 8.66 in.)
Weight without packaging (base configuration) [kg(lb)] OptiX PTN 916-F: 4.0 kg
NetEngine 8000 M1A: 3.9 kg
NetEngine 8000 M1C: 3.8 kg
ATN 910C-K: 4.0 kg
ATN 910C-M: 3.8 kg
ATN 910C-G: 3.9 kg
ATN 910D-A: 4.2 kg
OptiX PTN 916-F: 3.6 kg
NetEngine 8000 M1A: 4.5 kg
NetEngine 8000 M1C: 3.9 kg
ATN 910C-K: 4.1 kg
ATN 910C-M: 3.9 kg
ATN 910C-G: 4.5 kg
ATN 910D-A: 4.3 kg
Maximum input current [A] OptiX PTN 916-F: 2.5 A
NetEngine 8000 M1A: 4 A
NetEngine 8000 M1C: 10 A
ATN 910C-K/M: 10 A
ATN 910C-G: 4 A
ATN 910D-A: 10 A
OptiX PTN 916-F: 1.5 A
NetEngine 8000 M1A: 1.5 A
NetEngine 8000 M1C: 4 A
ATN 910C-K/M: 4 A
ATN 910C-G: 1.5 A
ATN 910D-A: 4 A
Input voltage range [V] -48 V/-60 V OptiX PTN 916-F/NetEngine 8000 M1A/ATN 910C-G: 110 V/220 V
NetEngine 8000 M1C/ATN 910C-K/M/ATN 910D-A: 200 V to 240 V/100 V to 127 V dual live wires, support 240V HVDC
Operating input voltage range [V] -40 V to -72 V 100 V to 240 V

What are the key safety guidelines and precautions?

General Precautions:

• To ensure personal and equipment safety, observe all the safety precautions on the equipment and in this document. The DANGER, WARNING, CAUTION, and NOTICE items do not cover all the safety precautions and are only supplementary.

• Follow all the safety precautions and instructions provided by Huawei. The safety precautions outlined in this document are only requirements of Huawei and do not cover general safety regulations. Huawei is not liable for any consequence that results from violation of regulations pertaining to safe operations or safety codes pertaining to design, production, and equipment use.

Operator Qualifications:

Only trained and qualified personnel are allowed to install, operate or maintain the equipment. Familiarize yourself with all safety precautions before performing any operation on the equipment.

DANGER:

• Do not install or remove the equipment or power cables while power is on.

• To ensure equipment and personal safety, ground the equipment before powering it on.

WARNING:

• Use multiple persons to move or lift a chassis and take measures to protect personal safety.

• Laser beams will cause eye damage. Do not look into bores of optical modules or optical fibers without eye protection.

NOTICE:

• During equipment transport and installation, prevent the equipment from colliding with objects like doors, walls, or shelves.

• Move an unpacked chassis upright. Do not drag it with it lying down.

• Do not touch unpainted surfaces of the equipment with wet or contaminated gloves.

• Do not open the ESD bags of cards and modules until they are delivered to the equipment room. When taking a card out of the ESD bag, do not use the connector to support the card’s weight because this operation will distort the connector and make the pins on the backplane connector bend.


How should I protect against Electrostatic Discharge (ESD)?

Before installing, operating, or maintaining the equipment, wear an ESD wrist strap and insert the other end into the ESD jack on the chassis or cabinet. Remove conductive objects like jewelry and watches to prevent damages to the equipment and cards caused by electrostatic discharge.


What are the site requirements for installation?

The device to be installed must be used indoors. To ensure normal operation and long service life of the device, the following requirements must be met:

• The device needs to be installed in a clean, dry, well-ventilated, and temperature-controllable standard equipment room. In addition, the equipment room must be free from leaking or dripping water, heavy dew, and condensing.

• Dustproof measures must be taken in the installation site. This is because dust will cause electrostatic discharges on the device and affect connections of metal connectors and joints, shortening the service life of the device and even resulting in device failures.

• The installation site must be free from acidic, alkaline, and other types of corrosive gases.

• The device that is operating may cause radio interference. If this is the case, relevant measures may be needed to reduce the interference.

• Generally, devices such as wireless antennas should not be installed in the equipment room. If such devices must be installed indoors, ensure that the electromagnetic environment meets relevant requirements or take necessary electromagnetic shielding measures.


What are the environmental requirements for the installation site?

Item Requirements
Long-term operating temperature [°C] -40°C to +65°C
Storage temperature [°C] -40°C to +70°C
Relative operating humidity [RH] OptiX PTN 916-F: Long-term: 10% to 90% RH, non-condensing Short-term: N/A
Other devices: Long-term: 5% to 85% RH, non-condensing Short-term: N/A
Relative storage humidity [RH] OptiX PTN 916-F: 10% to 100% RH, non-condensing
Other devices: 5% to 100% RH, non-condensing
Long-term operating altitude [m] ≤ 4000 m (For the altitude in the range of 1800 m to 4000 m, the operating temperature of the device decreases by 1°C every time the altitude increases by 220 m.)
Storage altitude [m] < 5000 m

What are the cabinet requirements for installation?

The device must be installed in an IEC 19-inch cabinet or an ETSI 21-inch cabinet. If customers choose to purchase cabinets by themselves, the cabinets must meet the following requirements:

1. 19-inch or 21-inch cabinet with a depth of greater than or equal to 300 mm.

2. The cabling space in front of the cabinet complies with the cabling space requirements of boards. It is recommended that the distance between the cabinet door and any device board be greater than or equal to 120 mm. If the cabling space is insufficient, cables will block the cabinet door from closing. Therefore, a cabinet with broader cabling space is recommended, such as a cabinet with a convex door.

3. The device draws air from the left side and exhausts from the right side. Therefore, if the device is installed in a 19-inch cabinet, there must be a clearance of at least 75 mm at the left and right sides of the cabinet to ensure good ventilation.

4. The porosity of each cabinet door must be greater than 50%, meeting heat dissipation requirements of devices.

5. The cabinet has installation accessories, such as guide rails, floating nuts, and screws.

6. The cabinet has a ground terminal to connect to the device.

7. The cabinet has a cable outlet on the top or at the bottom for overhead or underfloor cabling.

NOTE:

• The cabinet may be installed on an ESD floor or a concrete floor.

• For cabinets with left-to-right air channels, such as open racks, installing cabinets side by side may cause cascaded heating. Therefore, you are advised to install cabinets with left-to-right air channels vertically at different levels rather than side by side. If side-by-side installation cannot be avoided, it is recommended that the distance between cabinets be at least 500 mm (19.67 in.).

• If the device requires optical modules or attenuators with a puller, ensure that sufficient space is available for routing optical fibers. For a convex door or open rack, it is recommended that the distance between the cabinet door and the front panel of the board be greater than or equal to 120 mm (4.72 in.).


What should I consider before installing a device in a cabinet?

CAUTION:

• When installing a device in a cabinet, ensure that the total heat consumption of all devices in the cabinet does not exceed the heat dissipation capability of the cabinet.

• To prevent air return from affecting heat dissipation, leave at least 2 U space between devices in the cabinet.

• Do not block the heat dissipation holes on panels.

• A device that needs to share the same cabinet with other devices cannot be installed near the air exhaust vents of those devices.

• Consider the impact of a device’s air exhaust vent on adjacent devices to prevent high temperature.

• When fastening floating nuts, ensure that there is at least 75 mm space on the left and right sides of the device for ventilation after device installation.

NOTE:

• Certain steps support two installation modes. Select a proper PGND cable installation mode according to cabling requirements. The PGND cable can be connected to either the front or side face of the device. Connecting the cable to the side face is preferred.

• Figures in the document are for reference only, and the actual device appearance may vary depending on the exact device model.


How do I install a device in an IEC 19-inch cabinet?

1. Install floating nuts onto the cabinet.

2. Connect the PGND cable to the front or side face of the device. Connecting the cable to the side face is preferred.

3. Install the device into the cabinet using M6 screws.


How do I install a device in an ETSI 21-inch cabinet with front columns?

1. Install floating nuts onto the cabinet.

2. Install the conversion mounting ears on both sides of the chassis using M6 screws.

3. Connect the PGND cable to the front or side face of the device. Connecting the cable to the side face is preferred.

4. Install the device into the cabinet using M6 screws.


What are the common cables used with this device?

Common cables include:

• PGND cable

• DC power cable

• Optical fiber

• AC power cable

• Shielded Ethernet cable

• 120-ohm 16 x E1 cable

• 75-ohm 16 x E1 cable


What is the recommended plan for routing cables?

NOTE:

• To ensure that power cables are connected in order, you are advised to plan power cable routing.

• It is recommended that power cables and ground cables be routed on the left side of the cabinet. It is recommended that cables, such as optical fibers and Ethernet cables, be on the right side of the cabinet.

• If cables are routed on the rear of a device, ensure that the cables do not block the air vents of the device to achieve proper heat dissipation.

• Before routing cables, make temporary labels and attach them to the cables. After the cables are routed, make formal labels and attach them to the cables as required.

• Do not bundle or route outdoor cables (such as outdoor antenna feeders and outdoor power cables) and indoor cables together in the cabinet or cable tray.


What are the requirements for installing DC power cables?

First, check the fuse capacity of the external power supply and the maximum cable size.

Device Model Recommended Fuse Capacity Maximum Cable Size
NetEngine 8000 M1A/M1C
OptiX PTN 916-F
ATN 910C-G/K/M
≥4 A
For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 4 A.
4 mm²
ATN 910D-A ≥6 A
For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 6 A.

After checking, select a cabling mode according to the actual DC power supply port type of the device and connect the cables.


What are the requirements for installing AC power cables?

First, check the fuse capacity of the external power supply.

Device Model Recommended Fuse Capacity
NetEngine 8000 M1A
ATN 910C-G
≥1.5 A
For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 1.5 A.
NetEngine 8000 M1C
OptiX PTN 916-F
ATN 910C-K/M
≥2 A
For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 2 A.
ATN 910D-A ≥4 A
For hierarchical power supplying protection, the current of the circuit breaker at the user side should be no less than 4 A.

After checking, select a cabling mode according to the actual AC power supply port type of the device and connect the cables.


What precautions and best practices should be followed when installing optical fibers?

WARNING: When performing operations such as installing or maintaining optical fibers, do not move your eyes close to or look into the optical fiber outlet without eye protection.

CAUTION: Before routing internal optical fibers, install fixed optical attenuators at the corresponding optical ports on devices according to the fixed optical attenuator installation table.

NOTE (Best Practices):

• The bending radius of a single-mode G.657A2 optical fiber is no less than 10 mm, and that of a multi-mode A1b optical fiber is no less than 30 mm.

• After laying out optical fibers, use binding straps to bind the fibers neatly without squeezing them.

• After the optical fibers are connected, the optical ports and optical connectors that are not used must be covered by dustproof plugs and dustproof caps, respectively.

• Do not use an open-end corrugated pipe to hold excessive optical fibers. It is recommended that an open-end corrugated pipe with a diameter of 32 mm accommodate a maximum of 60 fibers with a diameter of 2 mm.

• It is recommended that the length of a corrugated pipe inside a cabinet be about 100 mm.


Are there special instructions for installing an E1 cable?

This step is required only for the ATN 910C-K chassis. It is recommended that E1 cables and Ethernet cables be routed in interleaving mode.


What are the recommendations for installing Ethernet cables?

NOTE:

• It is recommended that the ATN 910C-K chassis use Ethernet cables crimped onsite.

• Bundle the network cables in a rectangle shape. Ensure that the cable ties are evenly spaced and face the same direction.

• Before bundling network cables, use a network cable tester to test cable connectivity.

• In a 300 mm deep cabinet with a flat door, common shielded network cables are not recommended when electrical modules are used. Instead, use Huawei-customized conversion short pigtail shielded network cables.


What checks should be performed before and during power-on?

Check Before Power-on:

• Check whether fixed optical attenuators have been added in accordance with corresponding configuration rules.

• Check whether the fuse capacity of the external power supply meets requirements.

• Check whether the external power supply voltage is normal.

CAUTION: If the power supply voltage does not meet requirements, do not power on the device.

Power-on Check:

WARNING:

• Before performing a power-on check, turn off all the switches on the device and external power supply system.

• If indicators are in specified abnormal states after you power on the device, handle the abnormalities onsite.


What are the normal operating states of the chassis indicators?

The following table describes the states of indicators when the device is operating properly.

Hardware Module Indicator Name State
Chassis STAT Working status indicator Steady green
ALM Alarm indicator off
PWR/STAT Power supply status indicator Steady green


CLICK HERE TO DOWNLOAD HUAWEI ATN 910C-A (01) PDF MANUAL


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.