FREE ENGLISH STEELGREEN SG42 (01) PDF USER GUIDE

FREE ENGLISH STEELGREEN SG42 (01) PDF USER MANUAL

FREE ENGLISH STEELGREEN SG42 (01) PDF OWNER GUIDE

FREE ENGLISH STEELGREEN SG42 (01) PDF OWNER MANUAL

FREE ENGLISH STEELGREEN SG42 (01) PDF REFERENCE GUIDE

FREE ENGLISH STEELGREEN SG42 (01) PDF INSTRUCTION GUIDE

FREE ENGLISH STEELGREEN SG42 (01) PDF REFERENCE MANUAL

FREE ENGLISH STEELGREEN SG42 (01) PDF INSTRUCTION MANUAL

FREE ENGLISH STEELGREEN SG42 (01) PDF OPERATING INSTRUCTIONS


CLICK HERE TO DOWNLOAD STEELGREEN SG42 (01) PDF MANUAL

If this is not the document you want for this product, click here to see if we have any other documents for this product.

How do I start the assembly of the 7 Gal. Independent Sprayer Attachment?

STEP 1: Disconnect the battery, ground first and then power wire.

STEP 2: Remove existing storage container and support bracket from the frame. Note: Steps 2 & 3 instructions are the same for the right and left side, if both left & right side tanks are being installed.


How do I install the independent sprayer unit to the frame?

STEP 3: Install the independent sprayer to the frame as shown using Carriage bolts CB-51634 qty. (4) and Hex nuts HFNCS-516S qty. (4).

How do I prepare the panel and install the rocker switch?

STEP 4: Use an exacto or utility knife and cut out the appropriate “Aux” opening in the panel (Right Side Pump or Left Side Pump).

STEP 5: Attach the rocker switch to the appropriate opening.


How do I wire the pump harness and install fuses?

STEP 6:

• Connect the pump harness to the pump switch.

• Connect the second harness if equipped with both left & right 7 gal. attachments.

• Left tank equipped, connect the orange power wire to port 3 on the fuse block.

• Right tank equipped, connect the orange power wire to port 4 on the fuse block.

• Connect the ground wire to the ground block.

• If equipped with left & right, Connect the ground wire from the second harness right side to the ground block.

• Attach the proper fuses according to the chart Fig. 1.

• Attach the clear cover to the fuse block.


What are the fuse specifications for the SG 52 Series Fuse Block?

Fig. 1: SG 52 SERIES FUSE BLOCK

PORT COMPONENT FUSE PORT COMPONENT FUSE
1 SPRAY PUMP 1 25 AMP 6 USB PORT 5 AMP
2 SPRAY PUMP 2 25 AMP 7 SPRAY PUMP SWITCH 25 AMP
3 7 GAL. LEFT 25 AMP 8 SPEEDOMETER 1 AMP
4 7 GAL. RIGHT 25 AMP 9 FOAM MARKER 25 AMP
5 HSA 10 AMP 10 HEADLIGHT 10 AMP

How do I complete the wiring connections for the sprayer attachment?

STEP 7: Connect the plug on the harness to the pump on the 7 gallon tank.

STEP 8: Reconnect the battery power wire first along with the pump power wire from the wiring harness, and then reconnect the ground wire.


How do I operate the 7 Gal. Independent Sprayer?

OPERATION

STEP 1: Press the switch on the dash to power the pump “on”.

STEP 2: Turn the knob on the throttle valve to adjust the spray pressure.

STEP 3: Squeeze the trigger on the spray handle to spray.


How do I perform maintenance on the sprayer’s strainer?

MAINTENENCE

• Turn the ball valve off to stop the fluid flow.

• Remove the cap from the strainer to clean it.


CLICK HERE TO DOWNLOAD STEELGREEN SG42 (01) PDF MANUAL


Leave comments, questions, reviews, tips, tricks, hacks or page errors below. Account not required.