MULTILIN 139 (01) PDF MANUAL


Post questions, comments, reviews or errors in the comment box below.

Your File is Ready … Download PDF

CLICK HERE TO DOWNLOAD MULTILIN 139 (01) PDF MANUAL


PDF Content Summary: INSTRUCTION MANUAL 139 SERIES MOTOR PROTECTION RELAY U.S. PATENTS 4,224,651 4,241,336 CANADIAN PATENT 1,130,383 U.K. PATENT 2,008,345 B 2. H MULTILIN DIVISION OF DERLAN MANUFACTURING INC. 215 ANDERSON AVENUE MARKHAM, ONTARIO, CANADA L3P 4C7 (905) 294-6222 FAX 294-8512 139 SERIES RELAY HORIZONTAL MOUNTING LIIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - . . . . . . . . . . . . . . . . . . . . . . - - - - - - - . . . - - - - - - . . . . . . . . . . . . . . . . . . + · · · - . - . . . . . . . . . . . . . . . . . . . . . . - - - . . . . . . . . . . . » :- + - - - · + + ++ + . . . . . . .. .. . . . . .. . .. . . .. .. .. .. .. . .. .. . .. . . . .. . . . .. .. ... .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . · - - - - . • - - - - - - - - . . . . . . . . . . . . . . . . . .................., TABLE OF CONTENTS 1. INTRODUCTION Page 1.1 Multilin Relay Features. ..... 1.2 Typical Applications. ....... 1.3 Relay Selection............ 1.4 Technical Specifications .... 2. INSTALLATION 2.1 Physical Dimensions. ....... 2.2 Option Selection........ 2.3 Mounting............ 2.4 External Connections. 2.5 Power Supply. ...... 2.6 Phase CTS. 2.7 Ground Fault CT........ 2.8 Main Relay Contacts...... 2.9 Auxiliary Relay Contacts.... 2.10 External Reset... 2.11 Emergency Restart............... 2.12 Temperature Sensing Option.............. 2.13 Connecting The Thermal Capacity Meter...... 2.14 Connecting The Current Output Option. 3. SETUP AND USE 3.1 Controls and Indicators...... 3.2 Maximum Load Control. .. 3.3 Unbalance Control. ..... 3.4 Start Timer... 3.5 Undercurrent Control... 3.6 Memory.......... 3.7 Emergency Restart.......... 3.8 Run Curve Selection. ...... 3.9 Mechanical Jam- Rapid Trip.. 3.10 Option Programming....... 3.11 Ground Fault ....... 3.12 Overtemperature Option... 3.13 Thermal Capacity. ...... 3.14 4-20mA Full Load Output. 3.15 Fault Diagnosis............ 3.16 Control Power.. 4. RELAY TESTING 4.1 Secondary Injection Test Equipment. 4.2 Commissioning Relay Tests. ..... 4.3 Overloads.......... 4.4 Start Timer.... 4.5 Unbalance....... 4.6 Undercurrent. ...... 4.7 Ground Fault ...... 4.8 Overtemperature Option. . 4.9 Routine Maintenance Verification 4.10 Problem Troubleshooting.. 5. THEORY OF OPERATION 5.1 Block Diagram. . ........ ........ 36 5.2 Circuit Diagram. ... BACK PAGE FOLD OUT 5.3 Component Locator.. . BACK PAGE FOLD OUT I I I , I .. . .. . . .. .. . ... . ... . .. .. .. .. . . . .. . . ... . .. . . . . . . .... . .. . . . . . . . .. . . . . . . .. . . . . .. . . . .. . . .. . . . . .. , .. . .. . .. . ... . .. . . ... . ... . .. ... .. .. .. .. ..... . .. . . .. . . .. .. .. . .... .. .. .. - - - + - - - - - . - - - . . . . . . . . . . . IT. . . . . . . .. .. . .. .. .. . .. . .. LIST OF FIGURES 4. Figure 2-1 . . . . . . . . . . . . - - - - . . . . . . . . . . . . . . . . 2-2 ........... ...............IIIIIIIII, 2-3 . . 2-4 2-5a en ................... . 2-5b OL.................... . 2-6 3-1 ......... ................., . Title Relay Dimensions. .................... CT Dimensions. ......... Relay Layout........... Relay Mounting. .....: Relay Wiring Diagram-AC Control Power Relay Wiring Diagram-DC Control Power .. Connecting Phase CTS.. Front Panel Layout. ............... Time/Overload Run Curves..... RTD Hot Motor Compensation....... Setting RTD Trip/Alarm Temperatures. ... Multilin Fault Finder.... Secondary Injection Test Set Schematic... Relay Block Diagram. .............. Relay Schematic. .......................BACT .........BACK PAGE FOLD OUT Relay Component Locator................ BACK PAGE FOLD OUT . 3-2 . . 3-3 3-4 3-5 S.. .... . .. .. .. . .. . .. . . . . 4-1 . . 5-1 5-2 5-3 LIST OF TABLES Page Table 1-1 1-2 1-4 2-1 3-1 3-2 D.IN . L. . . . . . . .. . .. . . . . . . . . . .. .. . Title Multilin Relay Protection Features. ...... Relay Order Code......... Technical Specifications..... External Relay Connections. ... Controls and Indicators. ....... Memory Lockout Conditions. . . Overload Level Switch Settings...... Option Switch Settings........., Ground Fault Switch Settings...... RTD Resistance vs Temperature...... Problem Troubleshooting Guide. ..... 3-3 3-4 3-5 4-2 1. INTRODUCTION 1.1 MULTILIN RELAY FEATURES The Multilin relay is designed to fully protect three phase AC motors against con ditions which can cause damage. In addition to motor protection, the relay has features that can protect associated mechanical equipment, give an alarm before damage results from a process malfunction, diagnose problems after a fault and allow verification of correct relay operation during routine maintenance. One relay is required per motor. Since phase current is monitored through cur rent transformers, motors of any line voltage can be protected. The relay is used as a pilot device to cause a contactor or breaker to open under fault conditions; that is, it does not carry the primary motor current. TABLE 1-1 MULTILIN RELAY PROTECTION FEATURES PROTECTION FEATURES Overload (Selectable Curves) Trip/Alarm Outputs Locked Rotor Status Indication Stalt-- Mechanical Jam Fault Diagnosis Repeated Starts Memory Lockout Single Phase/Unbalance Simple Adjustment-No Tools Ground Fault Easy to Retrofit Field Testable Undercurrent CSA Approval ATAPPET" . ... ... . Am . . !" ! 1.2 TYPICAL APPLICATIONS. Versatile features and controls allow the relay to protect associated mechanical equipment as well as the motor. In addition to the basic electrical protection for motors listed in table 1-1, the relay can protect against common faults due to process problems such as: 1) Personal safety and mechanical protection of pumps using the undercur. rent feature to detect loss of suction or a closed discharge valve. 2) Personnel safety and mechanical protection of fans against loss of air fiow in mines or flow in steam generating boilers using the undercurrent feature. 3) Electrical protection of compressor motors from excessive run-up time caused by an open outlet using the start timer. 4) Mechanical protection of gears, pumps, fans, saw mill cutters and com pressors against mechanical jam using the rapid trip feature. 5) Safety to personnel from shock hazard using the ground fault feature to detect winding shorts or leakage currents from moisture in mines. 6) Protection of motors and equipment from operator abuse using the thermal memory lockout feature. " . " " " ! " . 1.3 RELAY SELECTION The Model 139 relay is available in horizontal or vertical mount versions and is equipped with a number of standard features that are programmed for a specific application by means of selector switches. Although these can be changed in the field, they will be factory preset if specified according to the relay order code of Table 1-2. Each relay is shipped with a yellow product specification card which shows instalied options and factory switch settings. Consult this card and Table 1-2 to determine how the relay has been equipped. Relays are available for use with 1 or 5 amp current transformers (CTS) which must be specified with the order. Since the relay only sees secondary current, any CT ratio can be used with the relay providing it has the correct secondary rating to match the relay (i.e. 1 amp or 5 amp type). Although many features are standard and field selectable, the following options will not be provided unless specifically ordered: 1) Ground Fault 2)RTD Overtemperature 3) Thermal Capacity Meter 4) 4-20mA Full Load Output Stocking of spare relays is simplified since many features are fieid programmable allowing a relay to be set up for different applications. Those features that must be specified at time of order are indicated in Table 1-2. TABLE 1-2 RELAY ORDER CODE 139 /H/5 / 6 / 200 / C / 10110101 / D - GF/8/Y / A / ATD / H /110 / 130 – TC Output Options (One only) ---TC - Thermal Capacity Meter Option FLC 4-20mA Full Load Current Model 139 Relay Mounting H- Horizontal V-Vertical ATD Trip Temperature °C RTD Alarm Temperature °C CT Inputs 1-1 amp 5-5 amp *Overload Levels 1-15 Overload Curve Number *Mechanical Jam Level 150% - 150 200% - 200 250%-250 300% - 300 Sensor Type H – 100 Ohm Platinum J - 10 Ohm Copper K – 120 Ohm Nickel L - 100 Ohm Nickel Thermistor - consult factory RTD Option Ground Fault Alarm -A – Alarm Enable B – Alarm Disable "Ground Fault Time Delay X - No Delay - Y - 100mS Delay 2 – 2 Second Delay "Ground Fault Sensitivity 0.5, 1, 4, 8, 12 amps -Ground Fault W OHS *Short Circuit B - Short Circuit Disable C- Short Circuit Enable OPTION SWITCH SETTINGS O=DEFEAT 1 = ENABLE 0/1 0/1 0/1 0/1 0/1 Cyclic Overload Compensation Immediate Overload Warning Undercurrent Override Emergency Restart Memory Override Motor Temperature Compensation Voltage Compensation Feeder Protection Supply Power D-120 V AC E-240 V AC F-DC 0/1 0/1 0/1 Specity with order: 1) Motor Full Load Current 2) Drive Equipment eg. Crusher, Pump † Requires Separate DC Power Supply Type: Control Voltage Multilin Part No. 48V DC: DCS4-48 125V DC: DCS4-125 250V DC: DCS4.250 *Field Programmable - Other features must be specified with order. TABLE 1-4 TECHNICAL SPECIFICATIONS OVERLOADS INPUT 0-20 TIMES RATED CT SECONDARY AMPS CONTINUOUS FREQUENCY 50 - 60 HZ MINIMUM LOAD RANGE. 0-100% OF MAXIMUM LOAD CONTROL SETTING 3 PHASE RMS. ACCURACY: +10% RESPONSE TIME. 1 SECOND MAXIMUM LOAD CONTROL - CT AMPS ACCURACY +39 OF DIAL SETTING TO 10 TIMES RESET LOCKOUT LOCKOUT TIME: 30 MINUTES + 20% (AC POWER ON! LOCKOUT TIME: 30 MINUTES 30% AC POWER OFF) DETECTION LEVEL - 1% PICKUP CALIBRATED VALUE AMS AMPS SINEWAVE INPUT: RANGE 10- 100% 01-1 AMP 1 AMP CI MODEL 10- 100% 0.5-5 AMP 5 AMP CT MODEL RESPONSE AVERAGE OF 3 PHASE AMS VALUES OVERLOAD TIMES - 15% OF CURVE VALUES GROUND FAULT TRIP LEVEL: 0.5. 1.4.8. 12. AMPS THROUGH CT. LEVEL ACCURACY. +0. - 25% TRIP DELAY: 50mS + 0. – 25ms 100mS +0. - 25m 2 SECONDS + 0.5 SECONDS. OVERLOAD RAPID TRIP: 150/200/250/300 TIME DELAY: NOMINAL 1 SEC. MAXIMUM UNBALANCE CALCULATION RTD INPUT SENSOR USER SUPPLIED PLATINUM COPPER NICKEL RTD. ALARM TEMPERATURE. O- 180°C. 110°C NOMINAL TRIP TEMPERATURE: 0-180°C. 130°C NOMINAL ANALOG OUTPUT: 10mV/°C, OV @ 0°C 10n - Davl = UB% LESS THAN MAXIMUM LOAD CONTROL SETTING n, løn -- Davl = UB% FULL LOAD OUTPUT OPTION NO LOAD OUTPUT: 4mA FULL LOAD OUTPUT: 20mA MAXIMUM LOAD RESISTANCE: 3002 OVERLOAD SATURATION: 30mA MAXIMUM Dav GREATER THAN MAXIMUM LOAD CONTROL SETTING WHERE Øn = RMS VALUE OF ANY PHASE Qav = AVERAGE OF PHASES 1 2 3 FLC = MAXIMUM LOAD CONTROL SETTING RANGE 4-50% ACCURACY + 5% DIAL POINTS TRIP DELAY 5 SECONDS +2 SECONDS MAIN RELAY CONTACTS TYPE: SINGLE FORM C. RATINGS: 120VAC RESISTIVE 7 AMPS 240VAC RESISTIVE 5 AMPS 125VOC RESISTIVE 0.25 AMPS 28VDC RESISTIVE 5 AMPS SHORT CIACUIT TRIP LEVEL: 10 TIMES MAXIMUM LOAD CONTROL SETTING ACCURACY + 10% MAXIMUM TIME DELAY: 100ms @ 14 TIMES MAXIMUM LOAD CONTROL SETTING CONTROL POWER STANDARD. 120/240 VAC OPTIONAL 125 VDC POWER 5 VA FREQUENCY: 50/60 HZ 120VAC INPUT RANGE: 90-150 VAC 240VAC INPUT RANGE: 176-270 VAC 125VDC INPUT RANGE: 80-150 VOC BVADEN: .1 VA ENVIRONMENT OPERATING TEMPERATURE RANGE: -10°C to +60°C DUSTPROOF CASE START TIMER RANGE 4-60 SECONDS ACCURACY (VOLTAGE COMP B7 OFF): + 10% (VOLTAGE COMP B7 ON, INPUT 5-7 TIMES MAX. LOAD): + 20% ACTIVATION INRUSH RISES FROM 10% TO 101% OF MAXIMUM LOAD CONTROL SETTING IN ONE SECOND. DEACTIVATION LOAD CURRENT DROPS BELOW MAXIMUM LOAD CONTROL SETTING CERTIFICATION APPROVED RECOGNIZED COMPONENT 2. INSTALLATION 2.1 PHYSICAL DIMENSIONS The relay circuitry is housed in a high impact plastic case with a clear dust pioof cover for viewing indicators and control settings. The clear cover is screwed on and seals are available to prevent tampering with controls. Dimensions for the relay are given in Figure 2-1. Phase and ground fault CTs rire available from Multilin. The dimensions of these CTs are shown in Figure 2-2. FIGURE 2-1 -- RELAY DIMENSIONS ZU 21 GET 61 12hhh TUDU x 22 1 MANODOKANAL 8+ 188 BACK --- PRASE - 200 - RTD INPUTS 201 --- - PANEL CUTOUT FOR MOUNTING 56 10901010101010 elegetete ele 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PANEL CUTOUT MODEL 139 RELAY CLEAR COVER 202 — - 206 ade . (0000) - 55 — FRONT SIDE TERMINALS 17, 19, 21 ALL DIMENSIONS IN MILLIMETERS FIGURE 2-2 CT DIMENSIONS GROUND FAULT CAT 12-5-32.5/76 49. 50 ------ WIT : 1:14" 291 (30) DIMENSIONS ALRT No. A Inch mich miner mm lunch mm Inch mm CT-HF3 7.80 198 705 179 915 207 3-94 100 5-50140 CT-HGF3 606 154 15 28 134 6-18 157 315 80 3:54 90 Inches (mm) PHASE C/T-WINDOW TYPE Pori Ho CT-CXXIX 087 122) 2.73 (70) - ------- TERIODIT LSI.. - L - - L - - -- -- ---- - -- -0-22 m 1 651 - - - - - - - »---LLLLL 3.30" (89) INCHES (mm) 2.2 OPTION SELECTION In addition to the front panel controls, there are selector switches inside the relay used to program user requirements. Consult the yellow product specification card supplied with the relay to ensure that the factory switch settings match the order requirements. Field changes can be made by removing the cover and altering the switch settings. These changes should be noted on the product specification card and kept on file or mounted near the relay. Figure 2-3 shows switch locations. A description of each switch function will be found in sections 3-8, 3-10 and 3-11. Ensure switches are firmly pushed in when changing settings. FIGURE 2-3 OVERLOAD LEVEL SWITCH SETTINGS A 1 to AB FUNCTION OVEALOAD LEVEL SWITCH SETTINGS I = Such OF Al 2 A3 A5 A6 A7 A8 Q = Sutch OM -= Elect Run Curso Timu (Second) 2.5 1.5 TE 12.5 15 175 20 i 225 25 275 | 0X0 | | | x | | 0 12 37 13 125 15 I 375 NO RAPTO TRP 150414 RAP TOP 2004 RAPID TRP 20% RAPID TRE D RAPO TARE Short Circui Deu Ooo oodoooo 0 0 0 0 0 000077 IRID ALARM SET #RID TRIP SET 120 VOLT SUPPLY 240 VOLT SUPPLY OPTION SWITCH SETTINGS B1 TO 38 FUNCTION OPTION SWITCH SETTINGS X = Switch On O = Switch Off - = No Effect B1 B2 83 84 B5 B6 87 88 Cyclic Overload Compensation Immediate Overload Wuning Disable Undercurrent Emergency Restart Mernary Defeat Motor Temperature Cornpensation Voltage Compensation Enable Feeder Protection GROUND FAULT SWITCH SETTINGS CT TO CS FUNCTION GROUND ALT SWT TUSS X = Swan On Ers THE 0 = Switch Om - = N Enect 12 ATU Tp L x 0101010 Bung To OOOO 4 Απο Το 1 Amp ro 05 Ano lo DOID o Irp Del I S Tho Dolar 2 Second Tnç Delag - - - OTO Erale Cound Futt um - -I- - - 010 Oo. thtatto - _ 2.3 MOUNTING Flush mounting of the relay on a panel or switchgear door is shown in Figure 2-4. Both the horizontal and vertical faceplate versions of the relay require the same size rectangular panel cutout although the latter will be rotated 90 degrees from that shown in Figure 2-1. Once the rectangular slot is cut, the relay is held in place by two U-shaped clamps, ready for wiring. Connections to the relay are through 16 terminals on the upper surface near the back. CT connections are made to the interposing transformer module mounted on the back of the relay. CT wires are passed directly through the holes in the module or connected to the terminals supplied as described in Section 2-6. If the RTD option is supplied, 5 extra terminals will be provided on the back of the relay. The mounting scheme used should allow for access to the terminals. Before mounting and connecting the relay check the yellow product specifica tion card to ensure that all options and switch settings are set as desired. FIGURE 2-4 RELAY MOUNTING BRACKET CABINET FRONT PANEL 201... 01733 O/ MULTILIN RELAY VoOo eeeeeeeeee .-.-.-163 - -... ------ 206 ------- -- CLEAR COVER DIMENSIONS IN MILLIMETERS 2.4 EXTERNAL CONNECTIONS The complexity of wiring to the relay will vary with the number of options used. A minimal configuration would require supply power, 3 phase current CT inputs and the main relay contacts wired in series with the contactor control relay or circuit breaker shunt trip coil. Extra terminals will be provided on the back of the relay when the RTD over temperature option is ordered. Terminals for other extra options will be marked if they have been supplied with the relay. Consult the yellow product specification card to verify which options have been provided. A summary of all the external connections that can be used appears below. Items marked as optional are standard on all relays but not necessary for correct operation. Items marked as optional extra are supplied only if ordered with the relay. TABLE 2-1 EXTERNAL RELAY CONNECTIONS INPUTS 1) Supply power 120/240 V AC or 80- 150 V DC (Optional Extra) 2) Phase 1 current CT 3) Phase 2 current CT 4) Phase 3 current CT 5) Ground fault current CT (Optional Extra) 6) External reset switch (Optional) 7) Emergency restart keyswitch (Optional) 8) RTD temperature sensor (Optional Extra) OUTPUTS 1) Contactor/breaker trip-main relay contacts (N.O.& N.C.) 2) Alarm--auxiliary relay contacts (N.O. & N.C.) 3) Analog temperature output (Optional Extra with RTD) 4) 4-20mA output of full load current (Optional Extra) 5) Thermal capacity used meter (Optional Extra) 2.5 POWER SUPPLY Control power to the relay is normally 120V AC or 240V AC at 50HZ/60HZ The voltage is selected by means of soldered jumpers or switch. Power consumption is 5VA Terminals 15 and 16 will be marked with the supply voltage for which the relay has been set. If the voltage is changed, the extra voltage identification label supplied with the relay should be placed next to terminals 15 and 16 so that the correct value is marked. Wiring connections are shown in Figure 2-5a (A.C. CONTROL POWER) or Figure 2-5b (D.C. CONTROL POWER). It is essential that the relay receive control power before the motor is energized and recom mended that the relay remain powered after a motor has been shut down. An optional 80-150 V DC power supply is also available. . FIGURE 2-5a - RELAY WIRING DIAGRAM / AC CONTROL POWER IN MOTON PTD TELITERATURE 0-2 VOLT DC VETEN GAOU4D SHIELD AT ONE ENO ONLY (PREFERABLY RELAY TEAMINAL A) 3 PHASE MOTOR SUPPLY CONTACTOS DA SAEAKER ATC TEMPERATURE METEA RTD SENSOR PHASE 3 MULTIUN 139 AELAY GEN PHASE 2 1 ALP OR SAMP PHASE CTS CONTROL SUPPLY POWER VAN RELAY CONTACTS AUXILIARY RELAY CONTACTS PHASE 1 118 17 1 LN GAQUND FAULT CT 13 EXTERNAL RESET 6 5 THERMAL EMERGENCY CAPACITY RESTAAT METER GROUND 4 3 2 1 154 12 11 10 9 8 7 STAAT REMOTE RESET EMERGENCY RESTART PUSHBUTTON DA KEY SWITCH MOTOR THERMAL CAPACITY WETER STOP FULL 10AD OUTPUT OPTION CONTACTOR ALARM TWISTED PAIR GROUND FAULT CT 2000 1 5 AWD FUSE MOTOR T20/240V AC 50/80 HZ CA 110/125Y OC SUPPLY POWER NOTE: RELAY CONTACTS SHOWN IN UNTRIPPED STATE (AEADY FOR STARTING WITH NO ALAAM WITH CONTROL POWER APPLIED FIGURE 2-5b-RELAY WIRING DIAGRAM / DC CONTROL POWER. ATO RTD TEMP ta GROUND SHIELD AF ONE END ONLY 37 MOTOR SUPPLY EDC BA RTD TEMP METER SENSOR MULTILIN 139 RELAY PHASE CT'S CONTAOL 15V 15 V + - IR MAIN RELAY AUX RELAY CONTACTS CONTACTS on the GROUND REMOTE EM FAULT RESET RESTARI 14 13 12 11 10 9 8 7 6 5 4 3 IC 2 1 16 15 GROUND SHIELD WITH TERMINAL 1 T A BFAULT GROUND FAULT CI TWISTED PAIR 6 VOUT+ 5 VOUT - COM * MULTILIN DC$4 POWER SUPPLY GND VIN VIN - MOTOA KOTES: 1 MAIN AND AUX RELAY CONTACTS ARE SHOWN WITH CONTROL POWER APPLIED AND NG FAULT OR ALARM CONDITION 2) OCS4 "COM" (TERMINAL 4) MUST BE TIED DIRECTLY TO 139 RELAY TERMINAL 1 3) USE 18" LONG (MAX.) OF WIRE LENGTH TO CONNECT TERMINALS 16, 15 AND 1 (139 RELAY, TO TERMINALS 6 (V OUT+). 5{V OUT -) AND 4 (COM). {DCS4) RESPECTIVELY. 4) USE 3 CONDUCTOR SHIELDED CABLE FOR CONNECTIONS IF WIRE EXCEEDS 18" LONG GROUND SHIELD AT TERMINAL 1 ONLY (139 RELAY), 5) POWER SUPPLY INPUT IS INTERNALLY PROTECTED WITH AGC STYLE. FAST-ACTING FUSE Power Supply Model Number DCS4-48 DCS4-125 DCS4-250 DC SUPPLY Minimum Operating Voltage 30 VDC 80 VDC 160 VOC Maximum Operating Voltage 55 VDC 150 VDC 300 VDC 11 2.6 PHASE CTS One CT for each of the three motor phases is required to input a current into the relay proportional to the motor phase current. Although polarity is not im portant, it is recommended that the polarity markings shown in Figure 2-5 be observed in accordance with standard practice. The CT used can either have a 1 amp or 5 amp secondary and should be sized so that the motor full load current is between 50-95% of the rated CT primary amps. When ordering the relay, it is necessary to specify whether 1 amp or 5 amp CTs are being used. The CT ratio should be typed on the CT ratio label supplied and fastened to the front panel as shown in Fig. 3.1. The maximum load control is specified as a percentage of the CT value so the relay will work with any CT ratio. Con ventional current transformers will work with the relay which presents negligible burden or CTs can be purchased directly from Multilin. Five amp current transformers are connected to the CT module on the back of the relay as shown in figure 2-6b by connecting the CT secondary wires to the screw terminals provided. If desired, the CT common wires can be connected to a single terminal using the common bar provided in the accessory kit. It is also possible to remove the three brass terminals and pass the CT wires directly through holes in the CT module as shown in figure 2-6a. A relay designed for 5 amp CTs can be used with 1 amp CTs by removing the brass terminals and wrapping 5 turns through the holes as shown in figure 2-6c or 2-6d. If the relay is ordered for use with 1 amp CTs these turns will already be installed as shown in figure 2-6d. Otherwise, a conversion kit is available on request. Use of the common bar with the 1 amp version is not recommended as it may cause the windings to short. Each of the CT secondaries is isolated from the relay but one side should be grounded for safety reasons, Terminal 1 of the relay is the circuit ground which will also normally be tied to an external ground. FIGURE 2-6 PHASE CT WIRING Cik MUR TEAMS FE 2. ONEATH SAND PIIMPO PR$$ 48 INGEN ERPOSICC Beeeeee TILL LILL PUS PS) SVTC SECOP S cr 30HWAT EDECKY PG? TOT SECO CHE CI SCONTATTI Pe 1 CELLOW Ft 7. FC 7 EL CLIECINCS HP CT: B ÆLA TERUS CINCC s 10 PR PNJE TEISED No hii WONTS 19 11 OP COW TSRT FRC CCSSORY Pre PSE ? LEI SUPC! UFC DOCTY YAHY SECAMY PLATES CI SECONOWA, RUS IP GUVU PUE! WUPCI CINTA TVPC SCOKY 2.7 GROUND FAULT CT All current carrying conductors must pass through the ground fault CT window. If a safety ground is used, it should pass outside the CT window. Terminals 13 and 14 are connected to the external ground fault CT. Polarity is not important and one of the CT terminais should be grounded for safety reasons. A specially designed CT is used that is capable of outpuiting low level signals which allows for sensitive ground fault detection. It is recom mended that the two CT leads be twisted together to minimize noise pickup. If it is desired to use a different ground fault CT, consult the factory. 2.8 MAIN RELAY CONTACTS The control relay or shunt trip coil of the starter or circuit breaker is connected to the main relay contacts which are available as normally open or normally closed. Contact ratings are 7 amps maximum at 115V AC. Silver cadmium oxide contacts are used because of their ability to withstand high inrush currents on inductive loads. Consult the factory if these contacts are to be used for carrying low When the relay is ready for motor starting the contacts for terminals 10, 11, 12 will be as shown in Figure 2-5. When the relay trips, or if control power is lost, the contacts will change to the opposite condition. However, if this change occured from lost control power, the main relay will return to it's normal operating state when power is re-applied, without having to reset the relay. A change in state due to a relay tockout trip, requires that the reset button be pushed, or the external reset terminals shorted, in order to reset the relay. A motor start/stop scheme is indicated in Figure 2-5. Use terminals 10 and 11 in conjunction with a contactor starter and terminals 10 and 12 for a breaker shunt trip coil. On special order the relay can be equipped so that the main relay picks up only on a fault; that is, it is in the untripped state whenever power is lost. If the relay is purchased this way, the contact state will be opposite to that shown in Figure 2-5; that is, 10 and 11 will be open when the motor is ready for starting while 10 and 12 will be closed. The yellow product specification card wilt be marked "Non fail-safe Operation” if the relay is ordered this way. 2.9 AUXILIARY RELAY CONTACTS An extra set of contacts which operate independently of the main relay contacts, is provided in normally open and normally closed formats. These contacts have the same ratings as the main relay contacts. Internal selector switches are used to program which conditions will activate the auxiliary relay. This normally will be one of the following: Undercurrent, immediate overload warning, ground fault alarm or RTD overtemperature alarm. When the alarm condition is not present, the contacts of terminals 7, 8, 9 will be as shown in Figure 2-5. These contacts are normally used for alarm purposes to signal a fault condition before the motor is shut down. 2.10 EXTERNAL RESET An external reset switch, which operates in parallel with the front panel reset switch, can be connected to terminals 5 and 6 for remote reset operation. The 13 normally open contacts of this external switch are closed to reset the relay. Auto resetting of the relay after a fault has cleared can be obtained by permanently connecting a jumper across terminals 5 and 6. 2.11 EMERGENCY RESTART OPTION If it is desired to sometimes override the memory after a lockout trip, a keyswitch can be connected across terminals 3 and 4. This keyswitch, which can be purchased from Multilin, should be located close to the relay to avoid long wire runs. Shorting the terminals allows the memory to be discharged for motor restarting. Emergency restart enable switch B4 (Section 3.10) must be on if this feature is to be used. A temporary jumper placed across these terminals is also a useful way to test the relay or reset it from a lockout condition allowing restarting after a trip. 2.12 TEMPERATURE SENSING When the temperature sensing option is ordered, 5 terminals are added to the back of the relay. Terminals A, B, C are connected to the customer supplied RTD sensor in the motor as shown in Figure 2-5. The RTD sensor used should agree with that indicated on the yellow product specification card. Consult the factory if thermistors are to be used The motor temperature can be monitored if desired by connecting a standard voltmeter across terminals D and E. The output from these terminals iş 0 volts @ 0°C, 10mV/°C. A digital voltmeter with a 0-2 volt DC range will give a direct readout of motor temperature in degrees celcius. A suitable digital meter with °C markings is available from Multilin for panel mounting. The RTD sensor changes its resistance in proportion to temperature; conse quently, lead resistance compensation is employed. To prevent errors, each lead must have the same resistance. Thus, identical length runs of the same wire are required in connecting the sensor. Shielded 3 wire cable of #18 wire is recommended. This should be routed away from wires carrying large currents and the shield grounded at only one end, preferably at relay terminal A. If the RTD leads are brought from the relay to a terminal block in the switch-gear cabinet and an RTD is not to be connected immediately, the terminals A, B, C should be left disconnected at the relay to prevent the wires from acting as an antenna and causing nuisance tripping. 2.13 CONNECTING THE THERMAL CAPACITY METER On relays equipped with the thermal capacity meter option a 0-1mA output from terminais 1 and 2 (+VE) is provided to drive the meter supplied with this option. It may be desirable to place this meter away from the relay near the operator controlling the motor since accuracy is not affected by lead length. This allows the user to determine how close the relay is to tripping the motor, 2.14 CONNECTING THE CURRENT OUTPUT OPTION When the relay has been ordered with this option a 4-20mA output from terminals 1 and 2 (+VE) proportional to the percentage of full load motor current 14 is provided. Current levels are not affected by wire length and are suitable for driving chart recorders, programmable controllers or a computer interface. Output current saturates below 30mA on overloads. The wire connected to terminal 1 may also be grounded at the receiver. 3. SETUP AND USE FIGURE 3-1 FRONT PANEL LAYOUT a Q Q Q Q छ @ @ @ Ta a a a е в 3.1 CONTROLS AND INDICATORS Once the relay has been wired and the internal selector switches programmed for the desired options (Sections 3.8. 3.10, 3.11) all that remains is to set the front panel controls for the required application. Tabie 3-1 provides a summary of controls and indicators. Indicators come on whenever the corresponding condi tion is present and remain latched after the relay trips. TABLE 3-1 CONTROLS AND INDICATORS NO. NAME FUNCTION 1 Maximum load control Sets the maximum average RMS current to the motor at which overload occurs. Calibrated in % of CT amps. Unbalance control Sets the level of unbalance between phases for indication of an unbalance fault. Undercurrent control Sets the current level at which loss of load will be detected, Calibrated as percentage of maximum load current amps. Start time Sets maximum time motor can take to attain normal running mode. Calibrated in seconds. 5 Reset push button I-J-10 Resets relay after a trip. If relay in memory fockout condition reset does not function. Unbalance light Indicates that the actual current phase unbalance exceeds the set value Control 2). Overload light Indicates the motor current exceeds the set value (Control 1). Start light Indicates motor in a start up mode. Overtemperature light Indicates the external RTD sensor in the motor exceeds the internally set RTD alarm temperature, 10 Ground fault light Indicates ground fault (earth leakage) current exceeds 50% of internally preset value. 11 | Trip light Indicator flashes when relay has tripped. 12 Undercurrent light Indicates motor current has dropped below minimum load setting (Control 3). Power on Indicates relay energized by supply power. CT Ratio sticker Customer to mark existing CT ratio on this sticker (in accessory kit) and affix to front panel, 3.2 MAXIMUM LOAD CONTROL To set the maximum load control, determine from the motor nameplate the full load current and the service factor. e.g. 1.0, 1.15. Set the maximum load current control to the nameplate rating, or this value times the service factor. If the current rises above this value the overload light will come on and the relay will shut down the motor after a time determined by the run curve selected, degree of overioad and cumulative effect of previous overloads when the memory is active. Selection of the appropriate run curve is outlined in Section 3.8. As explained in Section 3.4 the run curve is not active during a startup. FIGURE 3-2 RUN CURVES 10.000 9000 · - - - +----- TIME TO TRIP SECONDS 5000 4000 - -- 600 500 20 00 On CURVE 15 CURVE 12 CURVES CURVE ? CURVE 4 CURVE 3 CURVE 2 CURVE 9 10 MAX LOAD CONTROL SETTING OVERLOAD FACTOR MULTIPLES OF MAX LOAD CONTROL 3.3 UNBALANCE CONTROL An unbalance in the three motor phase currents will result when a voltage un balance exists in a plant, if the resistance of one phase increases due to a pitted contactor or if loose connections develop. This results in a rapidly rotating field which induces severe heating in the rotor. It is difficult to predict the exact effect on rotor heating from a given amount of unbalance because of the problems in measuring rotor current directly and different types of rotor construction used in induction motors. Consequently there is no single recommended setting for the unbalance control. A suggested procedure for setting this control is to initially dial it fully clockwise to 50%. After the motor is powered on, dial back until the unbalance indicator (U/B) comes on. The scale reading at this point is the residual motor current unbalance, typically 4-50%. Increase the setting a few percent to avoid nuisance tripping. If the motor unbalance now increases above the normal setting the relay will trip within 5 seconds and the unbalance light will remain on. Unbalance levels ex ceeding the dial value do not affect the memory nor is the effect of previous unbalances cumulative. The condition must persist for a full 5 seconds for a trip to occur. In this way the motor is shut down before it can overheat while nuisance tripping is avoided. Periodic flashes of the unbalance light due to surges from other plant loads are normal and will not cause any problems. If an unbalance condition exists at a dial setting above 20% the plant distribution and motor con nections should be checked. Measurement of the negative sequence component of current which results in rotor heating is difficult to do reliably because both phase and magnitude calcula tions are involved and as such the output is prone to nuisance tripping from har monics. An approximation to this component is used in the Multilin relay to give effective unbalance protection. The actual dial value is calculated as follows: 1) Average 3 phase RMS current below maximum load control valve. U/8% On - Davlj (Dial Setting) = ? * x 100 OFLC Example running 120 + 110 + 108 01 = 120 amps Dav= -= 113 amps 02 = 110 amps 03 - 108 amps ØFLC = 120 amps UB a 120 – 113 100 = 6% 120 nr.--.. 14 2) Average 3 phase RMS current above maximum load control value. U/B% On - Way (Dial Setting)=-* - X 100 Jav Example: During Start 600 + 550 + 400 01 = 600 amps Dav =516 amps 02 = 550 amps 400 – 516 03 = 400 amps U/B=" 2 x 100 = 22% 516 ØFLC = 120 amps 3 Where On = RMS value of phase with max, deviation from Oav. Dav = average of 3 RMS phase values OFLC = maximum load control setting converted to amps, (i.e, control setting in % x phase CT primary rating). 18 The relay relates unbalance to the full load control setting for normal loads to pre vent nuisance tripping on very lightly loaded motors where large unbalances have a small effect. During starting and overloads, the unbalance is related to the average to give a more accurate approximation to motor heating. 3.4 START TIMER Induction motors will draw an inrush current while running up to speed on starting which is greater than the full load current. For across the line starting the current will typically be 5-7 times the normal running current. The start timer, with a range of 4-60 seconds, is used to provide protection against locked rotor, ex cessive loading during start-up and multiple starts. This control is only active when power is first applied to the motor. To set the start timer determine the actual measured run-up time of the motor, the specified locked rotor time and the number of consecutive starts allowed by the manufacturer. Set the start time control to a time less than the maximum locked rotor time but greater than the total time required for the maximum number of consecutive starts allowed. Ahigh start timer setting corresponds to a large motor thermal capacity When the relay first senses a motor current greater than 15% of the maximum load current setting it goes into start mode; that is, the run curve and rapid trip are ignored during start-up. When the motor current drops back down below the maximum load setting, the relay switches to the normal run curve. Subsequent Overioads will time out on the inverse time run curve (Figure 3-2). If the motor current does not drop below the maximum load setting within the start time, the relay will trip with a start and overload indication. When using the memory feature, the heat build up within the motor is accurately simulated and kept within safe limits. Since heat is dissipated in the motor during starting, the available overload time during running after a start will be reduced accordingly. If the relay is to be used for an application other than rotating machinery the start timer can be defeated (Section 3-10). In this mode, the relay will always respond to overloads according to the run curve. Operating in this mode may be useful for protecting transformers, feeder cables or motors that have multitap reduced voltage starters which allow the load current to fall below the full load value during acceleration. 19 3.5 UNDERCURRENT CONTROL This control, used to detect loss of load, is calibrated in percentage of the maxi mum load control. When the motor current drops below the control set point the undercurrent indicator (U/C) comes on and the auxiliary relay cioses (it selected, Section 3-10). This auxiliary relay operates a separate set of contacts from the main relay and is used for warning or process control functions. Typical uses for the undercurrent control include protection of pumps from loss of Suction, fans from loss of airflow due to a closed damper or conveyor system from a broken belt. For example, if the maximum load control is set to cause an overload condition when a pump draws 100 amps, setting the undercurrent control to 60% will cause the auxiliary relay to activate an alarm when the current drops below 60 amps which might represent loss of suction. A further use of this control is as a preoverload warning. Suppose a fan normally drew 90 amps and the maximum load control was set to give an overload condition at 100 amps which was the maximum rating for the fan motor. If the undercurrent control was set at 95% the relay would always sense an undercurrent condition with the auxiliary relay energised. Bearing wear would cause the current to in crease above 95 amps causing the undercurrent condition to drop out. Ifan alarm was wired across the normally closed contacts terminals 7 and 9, the alarm would sound above the normal current but before an overload occured signalling an ab normal condition prior to actual shut down. 3.6 MEMORY Heat build-up in the motor is simulated electronically by means of a memory cir cuit which integrates the phase currents over time. Motor start-ups or previous overloads are remembered by the circuit and reduce the remaining time available for future overloads. The memory will be fully discharged if no overloads occurred during the previous 30 minutes. When a motor trips due to overheating, the relay will prevent restarting by locking out for 30 minutes to allow the motor to cool. Conditions which will not cause motor overheating do not lock out the relay. Table 3-2 shows which conditions will allow immediate reset and which require a 30 minute wait before reset. TABLE 3-2 MEMORY LOCKOUT CONDITIONS TRIP CONDITION MEMORY LOCKOUT Yes Yes No Start Overload Jam-Rapid Trip Short Circuit Unbalance Ground Fault RTD High Temperature No No No No – Reduces Memory Capacity Memory lockout can be defeated by setting option switch B5 on (Section 3-10) allowing immediate resetting after any trip condition. Since no memory can allow a motor burnout for multiple starts or overloads, this setting should only be used with caution where production considerations are more important than motor protection. During loss of control power the memory discharges at the same rate as when power is applied. When power is restored the relay will automatically revert to a lockout trip state if it was in this condition before loss of power and sufficient cool ing time has not elapsed. However the lockout condition causing the trip is not indicated after power is re-applied. 3.7 EMERGENCY RESTART During testing of the relay or when production and safety considerations override motor protection needs, it may be desirable to reset the relay from a memory lockout condition. Placing a wire across terminals 3 and 4 for several seconds when emergency restart is enabled(Section 3-10) will discharge the memory. It is now possible to reset the relay by pushing the reset button. A key switch wired across these terminals can be left in the memory mode (contacts open) then switched to discharge the memory whenever it is required to set the relay from a lockout mode. Since previous starts and overloads are ignored, lack of caution using this feature could lead to a motor burnout. 3.8 RUN CURVE SELECTION Fifteen different run curves are provided to tailor the relay to the exact thermal re quirements of the motor being protected. These curves are numbered in Figure 3-2 and are selected by 4 switches according to Table 3-3. These switches are located on the large circuit board as shown in Figure 2-3. Curve numbers that are not shown in Figure 3-2 for clarity lie in between curves of adjacent numbers. If the manufacturer's data for the motor is available this can be plotted directly on the run curve figure and the next lower curve chosen. In absence of this informa tion the curve which has the closest value to the locked rotor time at 6 times full load current would be the best choice. If short circuit protection is enabled the relay will trip in approximately 100ms cuit protection should only be selected if the motor breaker or contactor is capable of opening safely under short circuit conditions. If switch A8 is turned off, short circuit protection will be enabled. 21 TABLE 3-3 OVERLOAD LEVEL SWITCH SETTINGS FUNCTION OVERLOAD LEVEL SWITCH SETTINGS X = Switch On A1 A2 A3 A4 A5 A6 A7 A8 0 = Switch Off - = No Effect Rapid S/C Run Curve Locked Rotor Time (Seconds) Run Curve Selection Trip No. 2.5 HuuULU 5 TO X X 3 4 7.5 10 12.5 15 17.5 20 22.5 XX | 0 COXXO XOXO 00X0 - 10 25 11 13 0x00 XOOO | - 10000 _ TIT 27.5 12 30 32.5 14 35 15 37.5 NO RAPID TRIP 150% RAPID TRIP 200% RAPID TRIP 250% RAPID TRIP 300% RAPID TRIP Short Circuit Defeat - 2 - X 3.9 MECHANICAL JAM RAPID TRIP in protecting driven equipment such as pumps, gearboxes, compressors and bandsaws, it is often desirable to have an immediate trip in the event of a locked rotor during running. Table 3-3 shows switch settings for current surge levels from 150-300% of the maximum load current at which the relay will trip after 1 second. During startup the rapid trip is disabled because a typical inrush of 600% is normal. Use of this feature with loads that experience overloads as part of normal operation such as crushers is not recommended. Rapid trip selection can be shown on the run curves of figure 3-2 by plotting a line horizontally at a time to trip of one second, and vertically from the rapid trip over load factor until it intersects with the selected curve. 22 3.10 OPTION PROGRAMMING Each relay can be programmed for a particular application using a group of selector switches. This provides flexibility since only the desired features are used and the settings can be changed at any time. Table 3-4 is a summary of the switch options. TABLE 3-4 OPTION SWITCH SETTINGS OPTION SWITCH SETTINGS B1 B2 B3 B4 B5 B6 B7 B8 X - FUNCTION X = Switch On O = Switch Off - = No Effect Cyclic Overload Compensation Immediate Overload Warning Disable Undercurrent Emergency Restart Memory Defeat Motor Temperature Compensation Voltage Compensation Enable Feeder Protection IIII! OLX11X Switch B1-Cyclic Overload Compensation In applications where the motor periodically goes into overloads such as crushing, switches B1 should be on and B5 off. Motors of this type are de signed for frequent short overloads but the relay memory would accumulate the overloads and eventually trip. Cyclic overload compensation causes the memory to discharge every time the motor recovers from an overload but still allows repeat start protection from jogging. A continuous overload will still trip according to the run curves (Figure 3-2). Switch B2- Immediate Overload Warning Turning this switch on will cause the auxiliary relay to be activated whenever the relay senses an overload providing a useful warning signal. Since overloads are normal during start up, this function is not active when the relay is in start mode. Switch B3-Undercurrent Detection An undercurrent condition will activate the auxiliary relay if this switch is off. When the auxiliary relay is to be activated by a condition other than undercurrent this switch should be set on. Switch B4--Emergency Restart It may be necessary to disable the emergency restart terminals 3 and 4 to prevent unauthorised reset of the relay after a lockout. Turning switch B4 off disables the emergency restart feature. Switch B5-Memory Defeat Each relay incorporates a memory which simulates heat buildup in the motor by accumulating previous overloads and start-ups reducing the time available for future overloads. When the memory is defeated by turning switch B5 on, the unit can be reset immediately after a trip instead of the normal 30 minute lockout. Only a continuous overload or start will cause a trip when the memory is defeated. Previous overloads and starts will have no effect. 23 Switch B6- Motor Temperature Compensation When the relay is equipped with the overtemperature option, the memory capaci ty available in the relay can be reduced proportional to the temperature of the motor winding RTD by turning this switch on. An improvement in motor protec tilation which can't be predicted from phase currents alone are compensated for. The available relay trip time reduces linearly so that at approximately 100°C the start timer setting and overload time available from run curves Fig. 3-2) are reduced 50% to represent a hot motor. Figure 3-3 shows the relationship be. tween RTD temperature and derating of start and overload times. This switch has no effect on relays that aren't equipped with the over temperature FIGURE 3-3-RTD HOT MOTOR COMPENSATION RELAY CAPACITY AVAILABLE 100% 75% 50% 25% 50 100 150 MOTOR TEMPERATURE (°C) Switch B7-Voltage Compensation When the supply voltage to the motor drops from its normal value, the run-up time of the motor will increase by the square of the change but the heating effect will be the same despite the longer time because of the decreased current. By turning this switch on, the start timer value will be multiplied by: (normal starting current)2 (actual starting current)? It is assumed that the normal inrush current is 6 times full load. If the actual inrush current was only 5 times full load because of reduced supply voltage and the start timer had been set to 20 seconds, the actual start time allowed would be: X 20 = 28.8 seconds. Similarly for an overvoltage condition the start time would be reduced. This feature is only active during starting because the effects of a change in supply voltage will automatically show up in the current during running which will ad just the trip time according to the run curve. 24 If the supply voltage fluctuates significantly and a fixed start time is not required 6 times full load when using this compensation; otherwise set the start timer as follows: Actual Start Timer _ Normal Start). (Actual start current multiples of fuli load) Setting (Time ( Example- Normal start time-20 seconds. Full voltage actual inrush current --4.5 times full load. Set start timer to = (20) 14.5) - 113 seconds. ( 6 )2 Switch B8-Feeder Protection The relay can be used to protect loads other than rotating machinery by turning this switch on which defeats the start timer. In this case, the run curve selected is always active and the relay behaves as an inverse/time overload device with the following features: (i) 3 phase overcurrent protection - The time/overload characteristic of the relay is matched to the device being protected by suitable adjustment of the maximum load control and selection of the appropriate run curve (Section 3.8). (ii) Rapid trip at high currents--Using the mechanical jam levels (Section 3.9) or short circuit an immediate cutout at high fault currents can be obtained. (iii) Phase Unbalance Protection--the desired level of phase unbalance that is acceptable can be selected by the unbalance control. (iv) Ground Fault Protection-Ground faults between the protected device and ground can be detected to obtain first an alarm and then a shutdown. Fault current level and time delay to trip are adjustable. These features make the relay particularly useful for protection of transformers, feeder cables in portable substations and arc furnace electrodes. Normally the memory will be defeated (Switch B5 on) when operating in this mode to prevent a lockout or nuisance trip from repeated short overloads. 3.11 GROUND FAULT (EARTH LEAKAGE) An insulation breakdown in the motor windings can provide a current path between the motor casing (ground) and the high voltage supply. When this occurs, not only is it desirable to shut the motor down before severe structural damage occurs but also the motor casing may be above ground potential, thus presenting a safety hazard to personnel. A separate current transformer which encircles all the motor conductors is also required to provide the sensing signal. Ground fault detection is only suitable for systems that have a path from the supply neutral to ground either through a resistance or by direct connection. The current transformer ratio, required for ground fault detection on the 139 is 2000: 1. By means of an internally mounted selector switch the relay can be set to trip for ground fault currents of 0.5, 1, 4, 8, 12 amps with instantaneous trip, 100 milli second delay or two second delay. On solidly grounded systems the instantaneous trip should be used. The 100 millisecond delay is provided for applications where the relay has to be co-ordinated with other protective devices or a short delay is desired because of transients. The two second time delay is provided for use on high resistance grounded systems where nuisance tripping may be a problem. 25 An alarm is provided to activate the auxiliary relay when the ground fault current exceeds 50% of the selected value. This is especially useful in mines where moisture buildup in the windings may start to cause excessive leakage. If ground fault detection is not being used (ie. ZSCT not connected), ensure that switch C1 is on and switches, C2-C8 are off. The eight ground fault selector switches control ground fault functions according to Table 3-5. Figure 2-3 shows the location of these switches. TABLE 3-5 GROUND FAULT SWITCH SETTINGS 010 FUNCTION GROUND FAULT SWITCH SETTINGS X = Switch On TRIP AMPS TRIP TIME ALARM O = Switch Off - = No Effect 02 03 04 05 | 06 07 08 NOT USED 0 0 0 0 0 0 0 12 Amp Trip X TOTOOTOT 8 Amp Trip O XOT Oo 4 Amp Trip 1 Amp Trip 0.5 Amp Trip No Trip Delay 100 ms Trip Delay 2 Second Trip Delay Enable Ground Fault Alarm EXAMPLE (NOMINAL FACTORY SETTING): Required sensitivity 8 amps ground fault current-Switch No. 2 on. Required trip delay 100mS-Switch 7 on. Enable ground fault alarm-Switch 8 on. 3.12 OVERTEMPERATURE OPTION Protection against excessive motor temperature due to loss of ventilation or high ambient temperatures is provided by the RTD option which must be ordered with the relay if required. A resistance temperature detector (RTD) supplied by the customer, is placed in the motor stator slots or air stream and provides the sensing signal to the relay. The standard sensor is a 3 wire, 100 ohm platinum RTD although other types can be accommodated upon request. If temperature sensing from a thermistor is required consult factory. Two additional terminals are provided to give a direct readout of temperature using any standard voltmeter. The output voltage changes 10mV/°C from O volts at 0°C. Thus, 85°C would cause a voltage of 0.85 volts between terminals Dand E. Any digital voltmeter with a 0-2 volt range would be suitable as a readout device although a panel mount model marked in °C is available from Multilin. Even if no permanent display meter is used, the terminals can be probed after a trip to detect heat build-up within the motor. The RTD circuitry is factory calibrated to operate the auxiliary relay at 110°C unless otherwise specified. Connecting an alarm to the output of this set of contacts would give a warning but still allow the motor to run. The RTD indicator will come on when the temperature exceeds the preset alarm value. When the 26 sensor temperature reaches 130°C the main relay trips shutting down the motor. The relay cannot be reset until the RTD temperature falls below the trip value. Different alarm and trip temperatures can be factory preset upon request. The nominal factory settings are recommended for use with class B winding insulation or class F insulation with class 8 temperature use. It is possible to change the alarm and trip temperatures in the field if required. To make these changes a 200 ohm potentiometer is connected across terminals A, B, C as shown in Figure 3-4 to simulate the RTD sensor The potentiometer is varied until a voltmeter across terminals D and E reads the desired alarm or trip temperature. The preset alarm or trip temperature trimpot in the relay as shown in Figure 2-3 is then adjusted until the auxiliary relay(alarm) or main relay (trip) just picks up. There is a short time delay after the threshold temperature is reached before the relay is activated. Care should be taken to ensure the settings of the RTD calibration trimpots are not altered. FIGURE 3-4 SETTING RTD TRIP/ALARM TEMPERATURES RTD OPTION TERMINALS E D C B A 0-2V DC METER 200 OHM POTENTIOMETER 3.13 THERMAL CAPACITY In processes where the motor loads are varied and operated at near the motor full load such as in grinding or in conveyor systems it is useful to know how close the relay is to tripping so the load may be adjusted accordingly. When the thermal capacity option is ordered with the relay a remote meter, calibrated from 0-100% of motor capacity used, is available to be situated near the operator and connected to the relay. The meter indicates how much the memory has charged corresponding to heat buildup in the motor. When the relay is about to trip, the meter will approach 100% capacity used. After a trip, the meter will indicate how much charge is left in the memory to give a rough idea of the lockout time remaining. 3.14 4-20mA FULL LOAD OUTPUT If the relay is to be used in conjunction with programmable controllers, automated equipment, or a chart recorder, this option can be ordered. A 4-20mA current corresponding to 0-100% of the motor full load current as set on the maximum load control is output. Thus a computer can be used to automatically shed loads as the motor current increases or a chart recorder can be used to plot the loading of a motor in a particular process. Other output ranges of motor full load current can be obtained on special fac tory order. 3.15 FAULT DIAGNOSIS A valuable feature of the relay is its ability to record the fault condition which caused the motor to be shut down for later analysis. All the conditions present at the moment of tripping except for undercurrent continue to be displayed on the front panel indicators until the relay is reset. The Multilin Fault Finder shown in Figure 3-5 allows the user to determine the likely cause of trouble by examining the relay display. 3.16 CONTROL POWER Control power should always be applied to the relay before the motor is started. Even if control power is removed the memory will remain active dis charging at a rate proportional to an idle motor. If control power is removed from a relay in the lockout condition, it will remain locked out after power is reapplied unless sufficient time has elapsed. Whenever control power is re moved and reapplied, the condition causing the trip will not come on. If con. trol power is removed when in an untripped state, it is not necessary to press the reset button in order to restart the motor, when control power is reapplied. Relays are normally supplied with fail safe contacts so that the output reverts to a trip condition when control power is lost. It is possible to obtain the relay on special order with a contact configuration which allows motor starting if control power is lost. FIGURE 3-5 A U/B O/L TRIPPED RELAY INDICATION START ATD G/F TAIP W/C ON PROBABLE CAUSE OF TRIP STAAT TIMER EXCEEDED – locked rotor - too many starts - Start timer sel too low o o o o • o . OVERLOAD -excessive overloads during running - mechanical jam rapid trip - short circuit HIGH TEMPERATURE (RTD OPTION) - blocked ventilation - cooling fins blocked - high ambient temperature oooooo. • • •oo•o. • o o o o • o BLOWN FUSE START - check fuses EXCESSIVE UNBALANCE - blown fuses - Single phase Supply - loose wiring connection - short between motor windings 0 0 0 0 . . . GROUND FAULT -- motor winding to case short - wiring touching metal ground . . o o • o • GROUND FAULT -motor winding lo case short - Winng touching metal ground 0 0 0 0 0 . MEMORY LOCKOUT -memory still locked out after power is applied 0 0 0 0 0 0 . . UNDERCURRENT ALARM -pump loss of suction - pump closed discharge valve -blower loss of airflow -conveyor overload warning 4 RELAY TESTING 4.1 SECONDARY INJECTION TEST EQUIPMENT Although it is possible to verify correct relay operation after installation without any special equipment it may be desirable to check ali relay functions before commissioning. Basic operation of the relay can be checked using a commercial operates on average RMS current values, a single phase current source is adequate. Figure 4-1 is the schematic of a simple test circuit that can be built to perform all the tests described in the following sections. 4.2 COMMISSIONING RELAY TESTS Prior to applying power to a new installation, system operation can be verified by applying currents through the relay current transformers using a primary (high current) injection test set. Alternately, operation of all system components except the phase CTs can be checked by disconnecting the current transformer secondaries and applying an input signal to the relay using a secondary injection test set similar to that shown in Figure 4-1. 4.3 OVERLOADS Determine from the yellow product specification card whether the relay is de signed for 1 amp or 5 amps CTs. Set the maximum load control to 50% of CT amps. The overload light should come on when injecting equal currents in all three phases of 0.5 amps (1 amp CT's) or 2.5 amps (5 amp CTs). Other points across the scale can also be checked. Verification of the overload/time curve (Figure 3-2) is possible by setting a known amount of overload and deter mining the time to trip. For example, with a 5 amp CT relay and the maximum load control set at 50%, injecting 5 amps in each phase will cause the relay to trip within 117 seconds if run curve number 4 has been selected. To get ac curate measurements it is necessary to know which run curve has been selected (Section 3,8), to ensure that the memory is fully discharged by using the emergency restart feature (Section 3.7), and to ensure that the relay does not go into start mode by slowly increasing the current to the overload level. Once the relay has tripped due to the overload test it should not be possible to reset it if the memory is being used. Connect a jumper across emergency restart terminals 3 and 4 for 5 seconds to discharge the memory. The relay can now be reset for further tests. If the relay is programmed for mechanical jam rapid trip (Section 3.9) set the maximum load control to 100% and inject 5 amps (5 amp model) or 1 amp (1 amp model). Slowly dial back the maximum load control until the relay trips. The current injected should exceed the full load control setting by the jam level selected. For example, if mechanical jam rapid trip was set for 2 times full load, with 5 amps injected (5 amp CT model) the relay would trip at a maximum load setting of 50% since 5 amps represents a current level of twice full load. Further more, unlike prolonged overloads which cause lockout when the memory is used it should be possible to immediately reset the relay after mechanical jam. 30 FIGURE 4-1 SECONDARY INJECTION TEST SET SCHEMATIC VARULELE TRANSFORMER 0-120 VOLTS 7 @ 1A TRANSFORMER 120V Y @ 15A 110V AC 1A CURRENT ON s Ow TAANSFORMER <0.50 15 171 0.50 15W 1 AMP < UNBAN DIODE b aba GROUND FAULT 0-5 AMP AC METERS OR PHASE AMPS INC NO TO NO COTECT FOA PHASE MAN RELAY AUX RELAY 1616 15 11 12 0 , 3 FOR CONNECT GROUND FAUST TESTS MODEL 139 RELAY UNDER TEST CRIIND FAULT EXTERNAL RESET EMEACENCY RESTART THERMAL CAPACITY METER 0-24 OC RTD TEMPERATURE 2007 SIMULATED RTD 4-20mk FULL LOL OUTPUT NOTES: 11 DO NOT EXCEEDS AMPS PEA PHASE FOR VALUES SHOWN 21 "CREASE GROUND FAULT OURAENT BY WRAPPING EXTRA TUANS THROUGH CT AWO MULTIPLYING RETEA CURRENT BY NUMBER OF TARS 31 PHASE AND GROUND FAQT TESTS MUST BE CONNECTED SEPIATELY AS SHOWN 4.4 START TIMER Before performing any start timer tests discharge the memory by connecting a jumper across emergency restart terminals 3 and 4 for 5 seconds. With the voltage compensation switch off (Section 3.10) turn on the injection set so that a balanced overload is immediately applied to the relay. This will simulate motor starting causing both the overload and start lights to come on. The relay should trip after the time set on the start timer. On start time and overload tests, there will be a 30 minute lockout before resetting is possible if the injected signal is removed as soon as the relay has tripped. Delaying removal of the applied signal after a trip allows the relay to continue charging and may result in a much longer lockout period. if the voltage compensation switch is left on the actual start time will differ from the dial setting as explained in Section 3.10. 4.5 UNBALANCE Unbalance detection is simulated by injecting a different current in each of the 3 phases and noting the unbalance control setting at which the unbalance light comes on. The scale value at this point should correspond to the degree of unbalance simulated according to the formulae of Section 3.3. For example, using a 5 amp CT relay with the full load control set at 60% and the unbalance control at 50% inject phase currents of 2 amps, 2 amps and 1 amp. Dial the unbalance control back until the unbalance light comes on. The value at this point should be approximately 22% as determined from: On-Davlx 100 OFLC =11-1.661. 0.6X5 X 100 =22% Unbalance After about 5 seconds of continuous unbalance the relay should trip. 4.6 UNDERCURRENT Set the full load control to 50% and the undercurrent control to 60%. When the injected current falls below 60% of the maximum load setting the auxiliary relay will be activated if this feature has been enabled (Section 3.10). Thus for a 5 amp CT relay, when the input current falls below 60% of (0.5x5 amps) = 1.5 amps the auxiliary relay will be activated with the undercurrent light on. Increasing the current clears the condition automatically. 4.7 GROUND FAULT Connect a single phase through the window of the ground fault current trans former as shown in Figure 4-1. Note the required trip current and time from the yellow product specification card and Section 3.11. Increase the current from the test set until the relay trips with the ground fault light on. It should require a current equal to the setting value +0, -25% to cause a ground fault trip. If the ground fault alarm is enabled, the auxiliary relay should activate at a current approximately one half this value. 10 20 4.8 OVERTEMPERATURE OPTION If the relay is equipped with the RTD option, an overtemperature can be simu lated by substituting for the RTD sensor a resistance equivalent to the sensor resistance at high temperatures. A 200 ohm potentiometer is connected in place of the RTD sensor as shown in Figure 4-1. The relay can be made to alarm or trip by setting the potentiometer to the appropriate resistance corresponding to the preset temperatures which are nominally; alarm at 110°C, trip at 130°C. Table 4-1 gives temperature resistance relationships for 100 ohm platinum, 120 ohm nickel and 10 ohm copper RTD sensors. The actual temperature the relay is measuring can be checked if a voltmeter is connected across the temperature output terminals as shown in Figure 4-1. The reading is 10mV/°C from O volts at 0°C. TABLE 4-1 RTD RESISTANCE VS TEMPERATURE | TEMPERATURE 100 OHM 120 OHM 10 OHM PLATINUM NICKEL COPPER 100.00 120.00 9.04 103.90 127.17 9.42 107.79 134.52 9.81 30 111.67 142.06 10.19 40 115.54 149.79 10.58 50 119.39 157.74 10.97 123.24 165.90 11.35 70 127.07 174.25 11.74 80 130.89 182.84 12.12 90 134.70 191.64 12.51 100 138.50 200.64 12.90 110 142.29 209.85 13.28 120 146.06 219.29 13.67 130 149.82 228.96 14.06 140 153.58 238.85 14.44 150 157.32 248.95 14.83 160 161.04 259.30 15.22 164.76 269.91 15.61 180 168.47 280.77 16.00 190 172.16 291.96 16.39 200 175.84 303.46 16.78 60 - -- 170 - ---- - ---- 4.9 ROUTINE MAINTENANCE VERIFICATION Once a relay has been successfully installed, periodic tests as part of the plant maintenance program can be performed to check correct operation of the protection system. Each condition can be simulated without actually creating an overload unbalance etc. which is generally not practical. Place a jumper across emergency restart terminals 3 and 4 for 5 seconds before each test to ensure the memory is fully discharged. 33 OVERLOADS - With the motor running, dial back the full load control until the overload light comes on. The dial reading at this point should correspond to the RMS current measured in the motor leads with an ammeter. If half this current is quickly set on the full load control, the relay now sees a current of 2 times the full load setting. Consult the appropriate run curve from Figure 3-2 to determine the time to trip at this overload level. After the relay has tripped the motor it should not be possible to reset for about 30 minutes if the memory is activated. LOCKED ROTOR, To simulate a locked rotor trip or excessive run up time, set the start timer to be less than the actually measured run up time of the motor. Start the motor. After the selected start time the relay should trip with the siart and overload lights on. If the voltage compensation switch is on this time will be different from the dial value according to Section 3.10. UNBALANCED CONDITIONS - Dial back the unbalance control until the un balance light just stays on. This is the measured unbalance to the motor, After 5 seconds of continuous unbalance the relay should shut down the motor with the unbalance light on. If the residual plant unbalance is too low for any unbalance indication, remove one of the phase CT inputs to simulate a single phase condition after first placing a short across the phase CT ter minals to prevent a shock hazard. UNDERCURRENT — With the motor running slowly dial back the undercurrent control from 100% until the undercurrent light goes out. The undercurrent per centage at this point times the motor full load current setting should correspond to the actual current drawn by the motor. OTHER FUNCTIONS – Routine testing of the other functions such as ground fault and overtemperature is similar to the procedures outlined in Sections 4.7 and 4.8. 4.10 PROBLEM TROUBLESHOOTING Often a correctly functioning relay will appear to have a problem because switch settings or operation are not understood. Table 4-2 is a guide to help operators determine what steps are necessary to correct an apparent problem. Ensure that all switch settings are known before attempting to investigate Table 4-2 contact a factory service centre to determine if the relay is defective. TABLE 4-2 PROBLEM TROUBLESHOOTING GUIDE SYMPTOM PROBABLE CAUSE ACTION - - Relay won't resel -- locked out after tro - – place short across emergency restant terminals tor 5 seconds then press reset. Switch 34 must be on. - allow motor to cool or disconnect ATD input. -- condition still persists. e.g. Hot RTD above trip temperature. Excessive Unbalance -- unloaded new pianit --- tigh voltaye unbalance - CTS incorrectly sized. -- periodic Surges. - set unbalance control higher. - Change load distribution. - check CT ratios. – normal, will not cause nuisance tripping unless continuous - Overload surges Periodic Overload Fripping – Cyclic overloads (crushers etc.). — increase or defeat mechanical jam level. - turn on Cyclic overload switch or defeat memory - use run Clive with longer trip times. – increase maximum load control setting -- incorrect run curve selected. Start Time too short/long -- voltage compensation switch on – previous Overload, starts shorten time available -- Consult Instruction Manual Section 3.10 - use emergency restart to dis charge memory before test. - decrease maximum load control setting Start light flickers relay trips periodically - lightly loaded motor causes relay to see start condition. RTD Trip – motor not running - hot RTO above trip temperature. allow motor to cool. - no RTD connected at motor. – unshielded leads or noise pickup. - disconnect RTO wires running from relay to terminals in switchgear. - shield wires, check for correct connections. reroute away from noise sources -- place jumper across unused thermistor terminals. - it using thermistor option no thermistor connected. w not enabled inside relay. check relay switch settings. (Manual Section 3.10). Alarm not working - immediate overioads - RTD - ground fault. – undercurrent – set too sensitive. Ground Fault nuisance tripping - increase G/F trip level. - noise – increase G/F time delay – twist ground fault wires together and route away from heavy current conductors. All relay indicators off. - no control power. - control power applied to wrong terminals. - check for Supply voltage at terminals 15 and 16. - damaged components. return relay for repair. 5. THEORY OF OPERATION 5.1 RELAY BLOCK DIAGRAM The simplified block diagram of Figure 5-1 shows the main features of the relay. Further circuit details for troubleshooting at the component level are provided in the Model 139 Relay Service Manual available from Multilin. Each phase is isolated through a matching current transformer. The AC RMS current is converted to the equivalent DC average voltage for each phase by 3 precision AC to DC converter/averager circuits. These three DC values are then sampled at a rate of 3KHZ by an electronic switch. Each signal is amplified according to the full load current control to normalize the signal so that 800mV is one full load regardless of the actual current this might represent. Other circuits such as short circuit, rapid trip and undercurrent then compare the actual current level to preset reference levels to determine if a fault exists. The output of the 3 phase sampling multiplexer goes to a circuit which produces the average of each of the phase RMS values. This average is alternately sub tracted from each of the 3 RMS phase values in the unbalance circuit. This normalized value is then divided either by the full load current or the average current during overloads to get the degree of unbalance. If this level exceeds the unbalance control setting, an unbalance fault signal is generated. Overload timing is determined by charging an integrator memory circuit at a rate proportional to the average phase current squared. The output of the squar ing circuit is placed in series with different resistor values to control the integrator charging current and hence the appropriate run curve for any given level of overload. During startup mode, as determined by control circuitry, the integrator memory charges at a rate determined by the start timer. This rate is either directly in terms of the start timer settings from a reference voltage or proportional to the current squared when using the voltage compensation feature. Only during idle operation or normal running will the memory integrator be given a chance to slowly discharge. Emergency restart or no memory options cause the memory to discharge rapidly at these times. After the integrator reaches the trip threshold, it must discharge to a much lower threshold before reset is possible producing the lockout characteristic. A separate relay is provided for alarm functions such as immediate overload warning and undercurrent both of which are based on phase current level. RTD and ground fault alarms are also both available. A constant current is passed through a remote RTD sensor in the overtempera ture option. Three wires and a compensation circuit ensure that the temperature sensed is not affected by lead resistance, RTD circuitry converts the sensor resistance value to a voltage of 10mV/°C. Separate adjustable comparators are provided for detecting alarm and trip temperatures. A no sensor detection circuit eliminates false tripping when no sensor is connected or the RTD becomes damaged. 36 SHORT CIRCUIT DETECT 3 PHASE MOTOR SUPPLY SHOAT CCT SCAFF FIGURE 5.1 CONTACTDA BREAKER 3KHZ OSCILLATORI RAPID TAIP INTERPOSING CT MOOULE RAPIO TRIP SELECT MAMTIPLEXER PHASE 1 ACY DC CONVERTOR FULL LOAD GAIN NORMALIZE 1 2 3 181. 2. 3 - w PHASE 7 AC/DC CONVENTOR UNBALANCE BAV - DAY >VE DAY Or PHASE 3 AC100 CONVEATCA MAEN AELAY MAIN RELAY DRIVEi EFL SELECT UNBALANCE LEVEL REF RUN/TRIP DISCHARTE AATE PHASE Cls 4-20mA FUL LOAN CURRENT OUT EMERGENCY 3 RESTART INDICAICRSI MEMORY F GUAVE GENERATOR CURVE SELECTION CONTROL EXTERNAL 5 RESET PANELCO LOCKOUT RESELLI THERMAL CAPACITY METER RESEF LOGIC START TIMER 215 120/240V AC OA 125V DC 00+ JOV POWER 0+2.5W REF SUPPLY Hoo-25V REF F00--10V HMMEDIATE OVERLOAD WARNING GROUND FAULT AUX RELAY TIME DELAY UNDERCURRENT AUXILIARY RELAY DRIVE GROUND FAULT LEVEL DETECTOA FILT GROUND FAULT ALARM CONSTANT SENSOA CURRENT RIO TAP DETECT HOT MOTOR COMPENSATION FID SENSOR CALIBAATOK MOTOR ATO ALARM RTD TEMPERATURE When a ground fault is detected, a 50HZ/60HZ current is generated by the ground fault current transformer. This low level signal passes through a dif ferential amplifier and filter to remove common mode and high frequency noise. A comparator gives an output whenever this signal exceeds a selected threshold level. Further time delay of this signal can be selected before a trip signal is generated. A separate comparator generates an alarm signal at 50% of the trip level selected. Power for the unit is provided by an AC transformer designed to accept a wide range of input signals. Solid state voltage regulators provide +10V, - 10V to power the circuitry. Separate precision references provide +2.5V and -2.5V to give drift free calibration over temperature changes and time. 38 H MULTILIN VII. LILULIINILLU MODEL 139 RELAY SCHEMATIC L POWE. W IDQUIN 30 KHZ Coox MULTIRRER ELECIDO QOF IRIP 1 VW WOL YOKHZ CLOCK TOBIOIHDAY 1 HOUR PAPOTREP 21 A 230 1125 126 RP 10101 ut i • Ovom teiseset DECADET C TANDE COHEN RP+ 401 IN4744 2/ de 1 LCO VI 917 RESET DECADE CIRDECCOEN CHEN 090 07 GE OS 2 o2 o200 11.79 G T TO 420 T . . . 000 SIN 14 T0 7 AM 270 100/ PS INLILI AT PU 310K 23 CHE IOONE IGF; 12 Rita CI, IN V . OLRPUS le ovo . AP- 21 00 100K OVOUS AT ALLAN SO: 116 10) SLARTINO +11o ONZ OLERO Hes 740:74 A LED 11 ACDO CONVERTORO MOOULE TAPH INC SHORT CIRCEG AC IN4101 1023 1x pop-1 GOL 1- 220K PHASE ( PT 1919 210 160 0 47911 EN C10 100F HOTEN WB LED . IT SIDA LE 01] TNLILO KYS HT 1140 2 NALANCE STARI LED MOD QL LED H2O se cfar OCD - --- Cri os RPU RAUAPL ) IN, MTWT DNS OK RIOL 11 CNC th RUNE 9102 YO GAN NORMAL 123 74C Set ELOT SK H4140HLoldt RP2-1 OK 15 DrP) ? 25 - FO 02 4052 4-IHUL PSE 2 CI 14 016 IAP 199 7 07 MAIN Sice 20x 441 ¢ WAEL AT 10 SH ORAT 17 04 TONTACT ST 0173 IK PSP + ULI ' UN N-U1 APS DEL . 1LLV 4-0 FULL LOAD ANALOG output OPTION PUMA . R20 TOM 03 IML 1L + MI y Loh144 RIR 013 27 SR3] [ 阳出主 " BIZ -FL ] ware A2 AP . .a : AY C04115 R2 R207 OK + - 0403 21% THLAY NKS ) 7 H - Oma INDO homv. FL 4X 104 14448 Ov782 19L14 RII < USA 114142 R LUXX IN ci OFLAR ORTO ALAMI 1010 WHQERCA Tt141 Theo OR SR20 L EX 1 WO TKERU. CAP. IN LUL IR Fys EITESUAL HEAL CAPACIT METER " RSUS +40-2a t HUN OTT, 16L SRO 0-0", THEAULINARIO Capti OPITO Y31 * FOA-MA THERMAL CAPAC: - FI rIT 15. POWER SUPA R107 56 tw LOAD LIKE US [ CLC LATIVITIES 151 Oi: RIO C103 100/F 00 IRTO TEMPERATURE OPTION 000-101 EN WEIT ΕΤΗ VA CUAVE GEN 24 1981 R46 1x3 UTUL ALTA 15 ILI J71 RY 19 RP ALS 1 y 200 woo + 257 AM 7K I7 71 COHSV CURRENT IT 40 DS14 1176 11 OS2 -2 $V JIRPL .2 SV ATO HOTEF M 1 mit 000154 00 Ok2-2.5 GR tay TO05 TINULO TOS R231 1102 IN 146 DZOT 13 A279 * 100n 15 NEUTRAL NO SENSOR R232 O -250 SILE LOL S -1-25 196 114215 MOLDOFF ' LAIS EMCAT MODE CONTROL RS2 G CAL. ASUS RSS IN in uere. SRZ 15% , N4448 n R20 SIRA R223 LOSZ PUS II | 710 LA. 7 00-104 100 9X164 282 K$ San 7 586x 30K 511n TUGU OXYCLAGE COMPENSATION Y? HER EVDENT 000) 54 st Asz 5 RUN QUAVE SELECT ZR23 SIT -10V 0913 00N sing PO Rin Co bu 1066 BST AST 5 R13 11 FC 1+ TS 5212 02167 RI L ORTO OAS R ZNY LUF ou Raise 21 ЧОРңн OPONE * P 240K --O ON TO $177* YHTY 1XS Low ICK TO c DIO s 2 BON RIO tep EN IND C20 ZN VA101UL HUR ? V (onscal) | -25V 2273 VR20 $ ATO RPL R24 AIL) R742 2 1 1t: TASR 2209 20KR 257 . !2$ 602W RTO SENSOR RTO SENSOR YU MOTO HUW GROUHO C1 YOK 0715 020 00*7 T1 FAULT CT $120K -..-- 100A 1204 10A Plat. Nicka Coop 33 K? 35K2 J3K2 100 Nickel 33K2 hu RZE YA ? Esits to DOZ .25% RXAN 32:1 --- CX 00* 2 Jkt -042 15 0 SA250 ATO ALANL TO PT*-* IN 040 BOARD O BC BOARD ! REY. F. IO come <2NK Wys SRI GP ALARM 60 00015 GF IRPIO Qi NOA TOOK KOOK OOK OOK 033K2 33K2 OK 33 K2 OOK 133KZ JOOK +7X4 (8K25 1764 1764 293mA 3 HMA 800mA 1.44mal $11 $11 82 51 6) 33K2 33X2 46K4 K21 CURRENT OUTPUT COMPONENT LO-ima 14-301 R206 1 ZK21 R207 4K99 40RZ A209 2K2 R210 4K99 40R2 0212 IN4004 JUMPER 이이이이이이이이이이이이이이이 112 JE FE 21 Y WOWE LILLEH TE LIE EDITOV 14.! PA du MITRU MITTEL 1 1 IR 38 V21 R561 139A BOARD - COMPONENT SIDE o C1024 0 -621 ICD10134 ER PLT R1267 0 0. H ISA SITA 202111 0. &R18 R1061 4R1027.5 -O11---- -SØ STAZIONE TZ TT ART057 TO0108018 1 02EZZA 6 WD114) 9-RI 28 RI27 - WD113 WINS Y R12341 6 In -911 VR102 -101 ERI22 WD1019 +C104 V E 139B BOARD - COMPONENT SIDE | \f0207 02015N 212 6214 -R243 राव HD204 REN1622 41-GR2191 A C204 GR27 22 22:12 C220 HER2581 HR2207 YR2060 YR2041 U28 U27 U24 -ZON C210 R:242 VR207| I VR2051 TIL DIL ) LLIT C214, id pon-R22.5- WEL 992564 TL 209 Flood VR 2017 U25 61ZON 1 - ZOZON FAGBIZNIS SR2291 IRY3101 LEFT: ZI201 VR C203 208 YOU HONOU R2 Ki U26 VR2021 202 ER24 =R201 MILY CS1-CS8 VR2031 139C BOARD - COMPONENT SIDE Nec: bus :39.627 NO MOTOR PROTECTION RELAY TV But DIVISION OF DERLAN MANUFACTURING INC. 215 ANDERSON AVENUE MARKHAM, ONTARIO, CANADA L3P 407 (906) 294.-6222 FAX 294-9512 -921 NO. 160-000 WAV 90


FREE ENGLISH PDF

OPERATING INSTRUCTIONS

USER GUIDE - USER MANUAL

OWNER GUIDE - OWNER MANUAL

REFERENCE GUIDE - REFERENCE MANUAL

INSTRUCTION GUIDE - INSTRUCTION MANUAL

Leave a Reply